| 2015-04-03 12:14:26 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, |
| | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | PLEASE CONSIDER THE FOLLOWING AS PROVISO: |
| | |
| | 1) SHEET T INDICATES INCORRECT FIRE CODE REFERENCES. |
| | THE PROPOSED PROJECT SHALL MEET THE REQUIREMENTS OF THE |
| | 5TH EDITION OF FLORIDA FIRE PREVENTION CODE INCLUDING |
| | THE 2012 EDITION OF NFPA 1 AND NFPA 101 AND ALL OTHER |
| | APPLICABLE CODES OR STANDARDS. |
| | FIRE SPRINKLER WORK SHALL COMPLY WITH THE REQUIREMENTS |
| | OF NFPA 13, 2010 EDITION. |
| | FIRE ALARM WORK SHALL COMPLY WITH THE REQUIREMENTS OF |
| | NFPA 72, 2010 EDITION. |
| | CONSTRUCTION WORK SHALL COMPLY WITH THE REQUIREMENTS OF |
| | NFPA 241, 2009 EDITION. |
| | FIRE EXTINGUISHERS SHALL COMPLY WITH THE REQUIREMENTS |
| | OF NFPA 10, 2010 EDITION. |
| | |
| | 2) THE NATURE OF THE REMODEL REQUIRES AN EVALUATION OF |
| | THE FIRE ALARM AND SPRINKLER SYSTEM FOR CODE COVERAGE |
| | AND COMPLIANCE. |
| | THE LIFE SAFETY SYSTEMS, FIRE ALARM AND/OR FIRE |
| | SPRINKLER SHALL REMAIN ACTIVE THROUGHOUT THE |
| | CONSTRUCTION PERIOD. |
| | ANY AND ALL WORK ON THE FIRE ALARM AND FIRE SPRINKLER |
| | SYSTEMS SHALL BE DONE UNDER SEPARATE SHOP DRAWINGS AND |
| | BY CERTIFIED LIFE SAFETY CONTRACTORS. |
| | ANY TIME THAT WORK ON THE LIFE SAFETY SYSTEMS, |
| | SPRINKLER AND/OR FIRE ALARM, EXCEEDS 4 HOURS, A FIRE |
| | WATCH SHALL BE IMPLEMENTED AND MAINTAINED UNTIL FULL |
| | AND COMPLETE PROTECTION IS RETURNED. |
| | |
| | |
| | |