Plan Review Details - Permit 15031150
Plan Review Stops For Permit 15031150
Review Stop G GAS REVIEW
Rev No 3 Status P Date 2015-04-08 Cont ID  
Sent By tklarge Date 2015-04-08 Time 08:36 Rev Time 0.00
Received By tklarge Date 2015-04-08 Time 08:36 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2015-04-02 Cont ID  
Sent By tklarge Date 2015-04-02 Time 04:09 Rev Time 0.00
Received By tklarge Date 2015-04-02 Time 03:42 Sent To  
Notes
2015-04-02 04:03:431) THE ADDITIONAL INFORMATION PROVIDED HAS RAISED
 ADDITIONAL QUESTIONS: IT APPEARS FROM THE DRAWING THAT
 THE LINE FOR THE FIREPIT IS COMING FROM AN EXISTING
 FIREPLACE.HOW MANY MORE GAS FIXTURES ARE ON THIS LINE?
 SUBMIT THE TOTAL BTU LOAD FOR ALL THE GAS FIXTURES ON
 THIS PE LINE.DOES THIS PE LINE CONTINUE TO THE GAS
 METER? IF SO SUBMIT THE TOTAL LENGTH OF THIS LINE FROM
 THE METER TO THE FIRE PIT AND TO THE MOST REMOTE GAS
 FIXTURE AND INCLUDE THE TOTAL BTU LOAD ON THIS LINE.
 DOES THIS LINE FOR THE FIREPLACE AND FIRE PIT GO BACK
 TO THE METER WITH NO OTHER FIXTURES ON IT. THE PLAN IS
 VAGUE? WPB AMEND. TO 2010 FGC SEC.107.2.1.
 2) THE DRAWING SHOWS "UP WALL". CLARIFY. WHAT TYPE OF
 PIPE IS GOING UP THE WALL. WHAT IS THE LENGTH OF THIS
 PIPE? THE DRAWING IS VAGUE.WPB AMEND. TO 2010 FBC
 SEC.107.2.1.
 3) THE PLAN STATES THAT THIS IS A 2 PSI SYSTEM YET THE
 GAS TABLE YOU REFERENCE IS FOR LESS THAN 2 PSI. WHICH
 IS IT?
 4) SUBMIT TWO COPIES OF THE MANUF. SPECS.FOR THE FIRE
 PIT. THE APPLIANCE MUST BE LISTED AND LABELED PER THE
 2010 FGC SEC. 301.3.WHAT YOU HAVE SUBMITTED ARE NOT
 MANUF. SPECIFICATIONS, IT IS A SALES PAGE FROM THE
 INTERNET.PLEASE REFER TO 2010 FGC SEC. 202 FOR THE
 DEFINITION OF "LABELED". & "LISTED".
 5) I SUGGEST YOU CALL TO SET UP AN APPOINTMENT TO GO
 OVER THESE COMMENTS SO I CAN CLEARLY EXPLAIN WHAT IS
 REQUIRED TO ISSUE THIS PERMIT.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2015-03-30 Cont ID  
Sent By tklarge Date 2015-03-30 Time 06:10 Rev Time 0.00
Received By tklarge Date 2015-03-30 Time 05:55 Sent To  
Notes
2015-03-30 06:10:381) SUBMIT TWO COPIES OF ALL DOCUMENTS FOR PERMITING PER
 THE 2010 AMEND. TO 2010 FBC SEC. 107.1.
 2) INDICATE THE BTU LOAD OF THE APPLIANCE.WPB AMEND. TO
 2010 FBC SEC, 107.2.1.
 3) INDICATE ON THE PLAN WHERE THE PE PIPE CONNECTS AND
 WHAT IT CONNECTS TO.
 4) GALVANIZED PIPING CANNORT BE USED UNDERGROUND PER
 THE FGC SEC.404.9.
 5) INDICATE THE PSI OF THE GAS. FGC SEC.402.2.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2015-04-08 Cont ID  
Sent By tklarge Date 2015-04-08 Time 08:37 Rev Time 0.00
Received By tklarge Date 2015-04-08 Time 08:37 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-04-02 Cont ID  
Sent By tklarge Date 2015-04-02 Time 04:09 Rev Time 0.00
Received By tklarge Date 2015-03-31 Time 10:28 Sent To  
Notes
2015-04-01 10:29:15RE-SUBMITTAL SENT TO TIM LARGE FOR REVIEW. JG.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-03-30 Cont ID  
Sent By tklarge Date 2015-03-30 Time 06:11 Rev Time 0.00
Received By tklarge Date 2015-03-26 Time 12:42 Sent To  
Notes
2015-03-26 12:42:40TO PLUMBING < $5K