Plan Review Details - Permit 15030482
Plan Review Stops For Permit 15030482
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2015-06-27 Cont ID  
Sent By jgomez Date 2015-06-26 Time 15:15 Rev Time 0.00
Received By jgomez Date 2015-06-26 Time 15:15 Sent To  
Notes
2015-06-26 15:15:57BUILDING REVIEW APPROVED WITH PROVISO:
 1-REVISE ENERGY CALCULATIONS: (1)THERE ARE 2 TYPES OF
 ROOFING MATERIALS. (2) WHERE IS THE INSULATED DOOR
 SHOWN ON PAGE 3 OF 6?. (3) WINDOWS S.F. ON PAGE 3 OF 6
 DOESN'T MATCH PLANS. ALSO, SEE SEC. 405.5.3 FOR DOORS
 WITH GLAZING AND REVISE AS REQUIRED. (4) REVISE WINDOWS
 OVERHANG DEPTH AND SEPARATION TO MATCH PLANS.
 ***IMPORTANT: WINDOWS & DOORS NEED LABEL SHOWING THE
 U-FACTOR AND SHGC FACTOR SHOWN ON ITEM #7.
 2- PROVIDE ACTUAL WINDOW SIZES AND MANUFACTURER'S SPECS
 SHOWING COMPLIANCE WITH ALL THE EGRESS REQUIREMENTS FOR
 1ST & 2ND FLOOR WINDOWS.
 3- DOOR STRUCTURAL BUCK DETAIL. NEED TO PROVIDE FULL
 SUPPORT TO THE DOOR FRAME.
 4- PROVIDE CURRENT ICC EVALUATION REPORT FOR THE FOAM
 INSULATION.
 5- SPECIFY SIZE OF WINDOW MULLION TO VERIFY DESIGN
 PRESSURES.
 6 FLAT ROOF NOA 14-0224.03 SUBMITTED: CLEARLY IDENTIFY
 APPROVED ASSEMBLY AND PROVIDE SIGNED & SEALED RAS 117
 CALCULATIONS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2015-06-19 Cont ID  
Sent By JGOMEZ Date 2015-06-19 Time 11:05 Rev Time 0.00
Received By jgomez Date 2015-06-19 Time 11:04 Sent To  
Notes
2015-06-19 11:05:47RESIDENTIAL (R3) ADDITION/ALTERATION BUILDING REVIEW
 COMMENTS
 CODE: 2010 FBC
  
 1- PROVIDE ENERGY CALCULATIONS AS REQUIRED BY SEC.
 101.4.3 OF 2010 FBC-ENERGY CONSERVATION. PERMIT CAN NOT
 BE ISSUED WITHOUT THE ENERGY CALCULATIONS. SEC.
 103.2.3.2 OF 2010 FBC-RESIDENTIAL.
 NOTE: I AM NOT ASKING FOR THE A/C INFORMATION. ENERGY
 CALCULATIONS AND EQUIPMENT SIZING CALCULATIONS ARE TWO
 DIFFERENT THINGS.
  
 2- SIZE OF WINDOWS SHOWN ON THE WINDOW SCHEDULE ARE NOT
 SHOWN ON THE PRODUCT APPROVAL AND DON'T SEEM TO COMPLY
 WITH THE EGRESS REQUIREMENTS. CLEARLY SPECIFY TYPE AND
 SIZE OF ALL WINDOWS, INCLUDING THE BEDROOM WINDOWS TO
 VERIFY COMPLIANCE WITH SEC. 604 OF 2010 FBC-EXISTING
 BUILDING AND SEC. R310 OF 2010 FBC-RESIDENTIAL. NOTE:
 SEE OPENING SIZES REQUIRED FOR BEDROOMS IN THE SECOND
 FLOOR.
 NOTE: PROVIDE MANUFACTURER'S CHART SHOWING THE
 SPECIFIED SIZE OF WINDOW THAT COMPLIES WITH THE EGRESS
 REQUIREMENTS.
  
 3- DOOR STRUCTURAL BUCK DETAIL. NEED TO PROVIDE FULL
 SUPPORT TO THE DOOR FRAME AS REQUIRED BY SEC.
 R612.10.2.1 OF 2010 FBC-RESIDENTIAL. SEE DETAILS ON
 EXTERIOR DOOR AND SLIDING GLASS DOORS PRODUCT APPROVALS
 AND REVISE AS REQUIRED.
  
 4- PROVIDE CURRENT ICC EVALUATION REPORT FOR THE FOAM
 INSULATION SHOWN ON NEW SOFFIT DETAIL 1 ON SHEET A-1.
 SEC. R316 OF 2010 FBC-RESIDENTIAL. ESR-3102 REPORT
 SUBMITTED EXPIRED ON AUGUST OF 2013.
  
 5- SPECIFY SIZE OF WINDOW MULLION TO VERIFY DESIGN
 PRESSURES. WINDOW SCHEDULE ONLY SPECIFIES THE LENGTH.
 SEC. R301.1 OF 2010 FBC-RESIDENTIAL.
  
 6- FLAT ROOF NOA 14-0224.03 SUBMITTED:
 A) CLEARLY IDENTIFY WHICH APPROVED ASSEMBLY IS GOING TO
 BE INSTALLED AND PROVIDE SIGNED AND SEALED RAS 117
 CALCULATIONS AS REQUIRED BY GENERAL LIMITATION #7 ON
 LAST PAGE OF NOA. NEED CALCULATIONS TO MEET THE DESIGN
 PRESSURES OF SEC. R301 OF 2010 FBC-RESIDENTIAL.
 NOTE: ONLY APPROVED ASSEMBLIES WITH GENERAL LIMITATION
 #7 ALLOWS NAIL ENHANCING WITH RAS 117 CALCULATIONS.
 ASSEMBLIES WITH GENERAL LIMITATION #9 CAN NOT BE USED.
 SEE GENERAL LIMITATION #9 ON LAST PAGE OF NOA.
  
 7- SHEET S1: ENGINEER TO PROVIDE ALL HIS INFORMATION AS
 REQUIRED BY CHAPTER 471 F.S. DRAWING WAS SUBMITTED ONLY
 WITH THE SEAL AND SIGNATURE AT THE BOTTOM OF THE PAGE.
  
 **** PLEASE REMOVE ANDF REPLACE ANY REVISED DRAWING.
 ALSO SUBMIT OLD DRAWINGS FOR REFERENCE.
 ***** PLEASE PROVIDE RESPONSE LETTER ADDRESSING EACH
 COMMENT TO EXPEDITE THE REVIEW PROCESS
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 (561)805-6712
 [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2015-04-21 Cont ID  
Sent By jgomez Date 2015-04-20 Time 18:39 Rev Time 0.00
Received By jgomez Date 2015-04-20 Time 18:39 Sent To  
Notes
2015-04-20 18:46:36RESIDENTIAL (R3) ADDITION/ALTERATION BUILDING REVIEW
 COMMENTS.
 CODE: 2010 FBC.
  
 1- PROVIDE ENERGY CALCULATIONS AS REQUIRED BY SEC.
 101.4.3 OF 2010 FBC-ENERGY CONSERVATION.
  
 2- FIRST FLOOR PLAN ON SHEET A-1 SHOWS DEMOLITION OF A
 MASONRY BEARING WALL. SUPPORTING THE SECOND STORY.
 ENGINEER OF RECORD TO PROVIDE COMPLETE SHORING DETAILS
 AND SPECIFICATIONS. SEC. 107.2.1.3 CITY AMENDMENTS.
  
 3- PLANS SUBMITTED ARE MISSING THE DEMOLITION-PLAN D-1.
 PROVIDE DEMOLITION FLOOR PLAN. SEC. 107.2.1 CITY
 AMENDMENTS.
  
 4- SHEET A-1: INFORMATION SHOWN ON FIRST AND SECOND
 FLOOR PLAN DOESN'T MATCH INFORMATION SUBMITTED FOR
 INTERIOR DEMOLITION PERMIT #15030483. ALL WALLS ARE NOT
 EXISTING AS STATED ON THE WALL LEGEND. THE FLOOR LAYOUT
 WAS CHANGED. REVISE AS REQUIRED. CLEARLY IDENTIFY ALL
 NEW WALLS, ETC. SEC. 107.2.1 CITY AMENDMENTS.
  
 5- VALUATION DECLARED IN THE PERMIT APPLICATION IS TOO
 LOW. VALUATION TO INCLUDE ALL LABOR, MATERIALS,
 CONTRACTOR'S OVERHEAD AND PROFIT AND ALL DESIGN
 PROFESSIONAL FEES AS REQUIRED BY SEC. 109.3 CITY
 AMENDMENTS. REVISE VALUATION TO INCLUDE ALL SCOPE OF
 WORK SHOWN ON REVISED PLANS. COORDINATE SCOPE OF WORK
 WITH ITEM #5 ABOVE.
  
 6- SPECIFY SIZE OF NEW ENTRY DOOR. SEC. R311.2 OF 2010
 FBC-RESIDENTIAL.
  
 7- CLEARLY SPECIFY TYPE AND SIZE OF ALL WINDOWS,
 INCLUDING THE BEDROOM WINDOWS TO VERIFY COMPLIANCE WITH
 SEC. 604 OF 2010 FBC-EXISTING BUILDING AND SEC. R310 OF
 2010 FBC-RESIDENTIAL. NOTE: SEE OPENING SIZES REQUIRED
 FOR BEDROOMS IN THE SECOND FLOOR.
  
 8- SPECIFY CARBON MONOXIDE ALARMS AND LOCATION WITHIN
 BEDROOMS AS REQUIRED BY SEC. R315 OF 2010
 FBC-RESIDENTIAL.
  
 9- PROVIDE COMPLETE DETAILS AND SPECIFICATIONS FOR
 DOORS AND WINDOWS STRUCTURAL BUCKS SHOWING COMPLIANCE
 WITH SEC. R612.10.2.1 OF 2010 FBC-RESIDENTIAL. NOTE:
 NEED TO PROVIDE WINDOW/DOOR FULL FRAME SUPPORT.
  
 10- SHEET S-1:
 A) NEW PORCH: WHERE IS FOOTING SECTION #4 TAKEN AT?. I
 THIS FOR THE NEW PORCH. HOW IS THE FOOTING CONNECTED TO
 THE PORCH COLUMN SPECIFIED ON FLOOR PLAN. ENGINEER TO
 CLARIFY WHY SPECIFYING ONLY ONE #5 VERTICAL
 REINFORCEMENT FOR THE NEW PORCH COLUMNS. SEC. R401.2 OF
 2010 FBC-RESIDENTIAL.
  
 B) PROVIDE ROOF FRAMING PLAN FOR THE NEW PORCH. SPECIFY
 FRAMING MEMBERS AND ALL CONNECTORS. SEC. R801.2 OF 2010
 FBC-RESIDENTIAL.
  
 C) SPECIFY BEAM SUPPORTING THE SECOND FLOOR WHERE
 MASONRY WALL IS GOING TO BE REMOVED BY THE LIVING AREA.
 SEC. R601.2 OF 2010 FBC-RESIDENTIAL.
  
 D) SPECIFY ALL NEW LINTELS ABOVE NEW DOOR/WINDOW
 OPENINGS. SEC. R601.2 OF 2010 FBC-RESIDENTIAL.
  
 D) DESIGN LOAD ON ROOF FRAMING NOTES: SPECIFY THE ATTIC
 LIVE LOAD AS REQUIRED BY TABLE R301.5 OF 2010
 FBC-RESIDENTIAL. SEE FOOTNOTES B AND G OF TABLE R301.5.
  
 E) ROOF SHEATHING NAILING PLAN: ROOF PORCH IS MISSING
 ROOF ZONE #3 AND DIMENSION "A" TO BE 4'-0" MIN. . SEE
 FOOTNOTE ON FIGURE R301.2(7) OF 2010 FBC-RESIDENTIAL.
  
 F) NEW ROOF OVER FIRST FLOOR. PROVIDE COMPLETE DETAIL
 AND SPECIFICATIONS FOR THE ATTIC CROSS VENTILATION
 SHOWING COMPLIANCE WITH SEC. R806 OF 2010
 FBC-RESIDENTIAL.
  
 G) PROVIDE COMPLETE DETAILS AND SPECIFICATIONS FOR
 FIRST FLOOR SOFFIT CONSTRUCTION SHOWING COMPLIANCE WITH
 SEC. R703.1.3 OF 2010 FBC-RESIDENTIAL.
  
 11- PROVIDE PRODUCT APPROVAL (2 COPIES) AS REQUIRED BY
 DCA RULE 9N-3 FOR:
 A) WINDOW MULLIONS AND CLEARLY SPECIFY MULLION SIZE TO
 VERIFY DESIGN PRESSURES. SEC. R301.1 2010
 FBC-RESIDENTIAL
  
 B) CONCRETE TILE FOAM. SEE TILE NOA FOR LISTED
 PRODUCTS.
  
 C) ALL SIMPSON STRUCTURAL CONNECTORS SPECIFIED ON PLANS
 AND DETAILS. PROVIDE ONLY THE PRODUCT APPROVAL COVER
 PAGE AND PAGE SHOWING THE CONNECTOR OR ENGINEER TO LIST
 THE FLORIDA PRODUCT APPROVAL NUMBER NEXT TO THE
 SPECIFIED CONNECTOR.
  
 D) ENTRY DOOR.
  
 12- ALL PRODUCT APPROVALS TO BE REVIEWED AND APPROVED
 IN WRITING BY THE ENGINEER OF RECORD. SEC. 107.3.4.1
 CITY AMENDMENTS. NOTE: CLARIFY WHO APPROVED THE PRODUCT
 APPROVAL SUBMITTED. ONLY APPROVED AND THE INITIALS WERE
 PROVIDED, BUT THERE IS NO INDICATION OF WHO REVIEWED
 THEM.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 (561)805-6712
 [email protected]

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2015-05-26 Cont ID  
Sent By rlecky Date 2015-05-26 Time 13:49 Rev Time 0.00
Received By rlecky Date 2015-05-26 Time 13:25 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2015-11-05 Cont ID  
Sent By skennedy Date 2015-04-26 Time 10:51 Rev Time 0.00
Received By ppetty Date 2015-11-05 Time 08:19 Sent To  
Notes
2015-04-26 10:56:131ST REVIEW: FBC 2010
  
 FBC- 107.3.5.3 ? ELECTRIC SERVICE RISER, GROUNDING
 DETAIL TO FOOTING STEEL DOESN'T SEEM POSSIBPLE FOR THIS
 JOB AS NEW FOOTING ARE NOT PROPOSED & 1/0 WIRE LIKELY
 WILL NOT BE USED. ALSO PROVIDE ANEL SCHEDULES AND SHOW
 CIRCUITS ON FLOOR PLAN. PLEASE RE-SUBMIT.
  
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2015-06-26 Cont ID  
Sent By jgomez Date 2015-06-26 Time 15:15 Rev Time 0.00
Received By jgomez Date 2015-06-25 Time 15:03 Sent To  
Notes
2015-06-26 15:03:54ENERGY CALCULATIONS SUBMITTED. JG.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-06-19 Cont ID  
Sent By jgomez Date 2015-06-19 Time 15:26 Rev Time 0.00
Received By jgomez Date 2015-05-13 Time   Sent To  
Notes
2015-05-20 09:08:515/20/15 SENT TO R4 SHELF FOR REVIEW. JG.
2015-05-13 19:02:56R03

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-04-26 Cont ID  
Sent By skennedy Date 2015-04-26 Time 10:51 Rev Time 0.00
Received By skennedy Date 2015-03-12 Time 11:57 Sent To  
Notes
2015-03-13 11:57:42R28
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status N Date 2015-04-24 Cont ID  
Sent By jgomez Date 2015-04-24 Time 11:20 Rev Time 0.00
Received By jgomez Date 2015-04-23 Time 10:34 Sent To  
Notes
2015-04-24 11:26:07NO INFORMATION SUBMITTED. OWNER STATED IN THE PERMIT
 APPLICATION "A/C SEPARATE PERMIT".

Review Stop P PLUMBING
Rev No 1 Status P Date 2015-04-08 Cont ID  
Sent By tklarge Date 2015-04-08 Time 11:27 Rev Time 0.00
Received By tklarge Date 2015-04-07 Time 15:04 Sent To  
Notes
2015-04-08 11:32:20SEPARATE PLANS & PERMIT REQUIRED FOR GAS INSTALLATION.

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status P Date 2015-06-19 Cont ID  
Sent By jgomez Date 2015-06-19 Time 15:26 Rev Time 0.00
Received By jgomez Date 2015-06-19 Time 12:46 Sent To  
Notes
2015-06-19 15:30:251- FLAT ROOF NOA 14-0224.03. NEED RAS 117 CALCULATIONS.
  
 2- BORAL CONCRETE TILE NOA 12-0904.12.
  
 3- FOAM ADHESIVE 14-0805.01
  
 4- BORAL TILE UNDERLAYMENT NOA 13-1113.05.

Review Stop Z ZONING
Rev No 3 Status P Date 2016-03-07 Cont ID  
Sent By ajones Date 2016-03-07 Time 14:28 Rev Time 0.00
Received By ajones Date 2016-03-07 Time 14:28 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2015-05-19 Cont ID  
Sent By sgraham Date 2015-05-19 Time 15:50 Rev Time 0.00
Received By sgraham Date 2015-05-19 Time 15:50 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2015-03-27 Cont ID  
Sent By sgraham Date 2015-03-27 Time 15:50 Rev Time 0.00
Received By sgraham Date 2015-03-27 Time 15:50 Sent To  
Notes
2015-03-27 15:51:253/27/15 ZONING FAILED
  
 1. SURVEY AND SITE PLAN MUST MATCH,CORRECT THE STREET
 ON THE SITE PLAN.