| Plan Review Stops For Permit 15030308 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2015-04-14 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2015-04-14 |
Time |
08:56 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2015-04-14 |
Time |
08:56 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2015-04-06 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2015-04-06 |
Time |
15:22 |
Rev Time |
|
| Received By |
skennedy |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2015-04-06 15:29:22 | 1ST REVIEW: FBC 2010 | | | | | | FBC 107 MINIMUM PLAN REVIEW CRITERIA. PROVIDE SHOP | | | DETAILS REVIEWED BY THE DESIGNER OF RECORD TO SPECIFY | | | ALL CONNECTION DETAILS. ADDITIONALLY, THE DESIGNERR OF | | | RECORD MUST PROVIDE EVEDENCE OF REVIEW AND ACCEPTANCE | | | OF THE SUBMITTED ROOFING AND WINDOW PRODUCTS. | | | | | | FBC 107.3.4 - PROVIDE PRODUCT APPROVALS FOR THOSE | | | PRODUCTS WHICH ARE REGULATED BY | | | FAC RULE 9N-3 REVIEWED AND APPROVED IN WRITING BY THE | | | DESIGNER OF RECORD. SPECIFICALLY, PROVIDE ROOFING, | | | WINDOW, AND DOOR SUBMITTALS. | | | | | | | | | STEVEN KENNEDY, CBO | | | CHIEF PLANS EXAMINER | | | (561) 805-6710 | | | [email protected] | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2015-03-19 |
|
|
Cont ID |
|
| Sent By |
tlarge |
Date |
2015-03-19 |
Time |
09:02 |
Rev Time |
0.00 |
| Received By |
dhayes |
Date |
2015-03-19 |
Time |
09:02 |
Sent To |
P |
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
3 |
Status |
P |
Date |
2015-04-13 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2015-04-13 |
Time |
12:05 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2015-04-13 |
Time |
12:05 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
2 |
Status |
F |
Date |
2015-04-11 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2015-04-11 |
Time |
05:40 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2015-04-11 |
Time |
04:58 |
Sent To |
|
|
| Notes |
| 2015-04-11 05:21:14 | 1) THE SITE PLAN ( LARGE PLAN ) SHOWS PE PIPING BEING | | | INSTALLED UNDERGROUND AND UNDER THE PATIO SLAB. PE | | | PIPING IS LIMITED TO INSTALLATION OUTDOORS UNDERGROUND | | | ONLY PER THE 2010 FBCR SEC.G2415.15.1. SHOW CODE | | | COMPLIANT PIPING MATERIAL ON THE PLANS. | | | 2) SUBMIT 2 COPIES OF THE MANUFACTURER'S | | | SPECIFICATIONS/INSTALLATION MANUAL FOR THE GRILL. THE | | | GRILL SHALL BE LISTED AND LABELED PER THE 2010 FBCR | | | SEC.G2404.3. | | | 3) THE LARGE DRAWING (SITE PLAN) AND THE 8 1/2 " X 11" | | | CONTAIN CONFLICTING INFORMATION. THE SMALLER SHEETS | | | SHOW THE GAS LINE AS CSST AND THE LARGE SHEET SHOWS PE | | | PIPE. CLARIFY. | | | 4) REMOVE THE EHD NUMBER ON THE LARGE SHEET IF YOU ARE | | | NOT USING ANY CSST PIPE. | | | 5) THE LARGE PLAN SHOWS THE SLEEVE AS SCH. 40 PVC AND | | | THE SMALL PLAN SHOWS THE SLEEVE AS SCH. 80 PVC WITH | | | CSST PIPE.CLARIFY. | | | 6) PROVIDE A MORE DESCRIPTIVE EXPLANATION ON THE PERMIT | | | APPLICATIONS. THE PLUMBING & GAS APPLICATIONS STATE | | | "COVERED PATIO-GAS" AND "COVERED PATIO- PLUMBING." THE | | | DESCRIPTION IS EXTREMELY VAGUE. | | | 7) REFER TO THE 2010 FL. BUILDING CODE RESIDENTIAL FOR | | | THE INSTALLATION REQUIREMENTS FOR A SLEEVE FOR THE GAS | | | LINE.SEE SEC. G2415.6.1.THE SLEEVE SHALL BE INSTALLED | | | IN ACCORDANCE WITH THIS SECTION. READ THIS SECTION | | | THOROUGHLY AND PLACE APPLICABLE NOTES ON THE PLAN | | | REGARDING THE INSTALLATION. | | | | | | PLEASE DO NOT RESUBMIT THESE PLANS UNTIL ALL | | | DEFICIENCIES HAVE BEEN CORRECTED.IF NEEDED, YOU CAN | | | CONTACT ME AT THE NUMBER BELOW AND SET UP AN | | | APPOINTMENT TO REVIEW THESE COMMENTS. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | | | | |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2015-03-19 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2015-03-19 |
Time |
15:25 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2015-03-19 |
Time |
14:33 |
Sent To |
|
|
| Notes |
| 2015-03-19 14:57:47 | 1) THE GAS DRAWING ON ONE OF THE PLANS IS DONE IN | | | PENCIL. REDRAW THE PLAN IN INK. | | | 2) INDICATE THE PSI OF THE GAS ON THE PLAN. WPB AMEND. | | | TO 2010 FBC SEC. 107.2.1. | | | 3) INDICATE ON THE PLANS THE APPLICABLE SIZING TABLE | | | USED TO DETERMINE THE PIPE SIZE FOR THE GAS LINE. 2010 | | | FBCR SEC. GG2413.3 & G2413.4. | | | 4) THE BTU LOADS LISTED ON THE 8 1/2" X 11" SHEET DOES | | | NOT MATCH THE BTU LOADS ON THE LYNX SIZING SHEET.YOU | | | SHOW 65,000 FOR THE GRILL AND 30,000 FOR SIDEBURNER BUT | | | THE LYNX SHEET DOES NOT HAVE THE SAME BTU LOAD. | | | CLARIFY. | | | 5) THE SLEEVING OF GAS PIPING UNDER A BUILDING SHALL | | | COMPLY WITH SEC.G 2415.6.1 OF THE 2010 FBCR. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | |
|
|
| Review Stop |
HIST |
HISTORICAL |
| Rev No |
1 |
Status |
P |
Date |
2015-03-18 |
|
|
Cont ID |
|
| Sent By |
fmittner |
Date |
2015-03-18 |
Time |
15:05 |
Rev Time |
0.00 |
| Received By |
fmittner |
Date |
2015-03-18 |
Time |
15:05 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2015-04-14 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2015-04-14 |
Time |
08:57 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2015-04-10 |
Time |
16:04 |
Sent To |
|
|
| Notes |
| 2015-04-10 16:46:52 | TO TKLARGE DESK. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2015-04-06 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2015-04-06 |
Time |
15:22 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2015-03-09 |
Time |
12:37 |
Sent To |
|
|
| Notes |
| 2015-03-09 12:37:51 | ROUTED TO HISTORIC |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2015-04-11 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2015-04-11 |
Time |
04:57 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2015-04-11 |
Time |
03:48 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2015-03-19 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2015-03-19 |
Time |
15:26 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2015-03-19 |
Time |
15:26 |
Sent To |
|
|
| Notes |
| 2015-03-19 14:32:02 | 1) THE FLOOR DRAIN AND THE SINK ARE NOT VENTED. A VENT | | | IS REQUIRED FOR THESE TWO FIXTURES PER THE 2010 FBCR | | | SEC. P3101.2, P3101.2.1. | | | 2) A CLEANOUT IS REQD.IN THE BASE OF THE SINK STACK PER | | | FBCR SEC.P3005.2. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
2 |
Status |
P |
Date |
2015-04-14 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2015-04-14 |
Time |
08:57 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2015-04-14 |
Time |
08:57 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2015-04-06 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2015-04-06 |
Time |
15:29 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2015-04-06 15:30:03 | ROOFING FAILED, SEE BUUILDING COMMENTS. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2015-03-18 |
|
|
Cont ID |
|
| Sent By |
fmittner |
Date |
2015-03-18 |
Time |
15:05 |
Rev Time |
0.00 |
| Received By |
fmittner |
Date |
2015-03-18 |
Time |
15:05 |
Sent To |
B |
|
| Notes |
|
|