Plan Review Details - Permit 15020450
| Plan Review Stops For Permit 15020450 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2015-03-16 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2015-03-16 |
Time |
08:53 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2015-03-14 |
Time |
17:21 |
Sent To |
|
|
| Notes |
| 2015-03-16 08:55:33 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | 1. DOCUMENTS PREPARED BY AN ENGINEER AND SUBMITTED FOR | | | PUBLIC RECORD ARE TO BE SIGNED, SEALED, DATED ORIGINALS | | | FS471. | | | | | | 2. PLANS ARE A POOR PHOTOCOPY. PROVIDE LEGIBLE PLANS, | | | FBC 107. | | | | | | 3. ENGINEER'S TITLE BLOCK TO INCLUDE THE CERTIFICATE OF | | | AUTHORIZATION FOR THE COMPANY JC KOSINSKI ENGINEERING, | | | INC. PER FAC61G15-23.002, FS 471. | | | | | | 4. PROVIDE A COPY OF THE CONTRACT FOR THIS JOB, FBC | | | 109. | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2015-03-11 |
|
|
Cont ID |
|
| Sent By |
sciard |
Date |
2015-03-11 |
Time |
15:00 |
Rev Time |
0.00 |
| Received By |
sciard |
Date |
2015-03-11 |
Time |
15:00 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2015-03-16 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2015-03-16 |
Time |
08:55 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2015-02-12 |
Time |
16:20 |
Sent To |
|
|
| Notes |
| 2015-02-12 16:20:30 | SENT TO POOL BOX |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2015-02-17 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2015-02-17 |
Time |
06:21 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2015-02-17 |
Time |
04:27 |
Sent To |
|
|
| Notes |
| 2015-02-17 06:20:38 | 1) SHT. S-1 - THE PRINTING ON THIS SHEET IS VERY SMALL | | | AND DIFFICULT TO READ. SUBMIT 2 CLEAR AND LEGIBLE | | | COPIES. WPB AMEND. TO 2010 FBC SEC. 107.2.1. | | | 2) SHT. S-1 - BOTH COPIES OF THIS PLAN SHALL BE SIGNED | | | AND SEALED BY THE DESIGN PROFESSIONAL PER THE FLA. | | | ADMINISTRATIVE CODE RULE 61G15-23.002. | | | 3) SUBMIT TWO COPIES OF THE FSEC CERTIFICATION AND OF | | | THE PIPING DIAGRAM. WPB AMEND. TO 2010 FBC SEC. 107.1. | | | 4) SUBMIT A PIPING DIAGRAM / SCHEMATIC THAT CLEARLY | | | SHOWS THE LOCATION OF ISOLATION VALVES AS REQUIRED BY | | | THE 2010 FBCR SEC. M2301.2.8.ALSO, SUBMIT PIPING | | | DIAGRAM/SCHEMATIC THAT SHOWS HOW THE SOLAR SYSTEM IS | | | CONNECTED TO THE EXISTING POOL PIPING SYSTEM. | | | 5) SHOW THE LOCATION OF REQUIRED PRESSURE AND | | | TEMPERATURE RELIEF VALVES. 2010 FBCR SEC.M2301.2.3. | | | 6) ANY CONNECTION OF THE SOLAR SYSTEM TO THE POTABLE | | | WATER SYSTEM SHALL BE PROTECTED AGAINST BACKFLOW IN | | | ACCORDANCE WITH 2010 FBCR SEC.M2301.5 & P2902.5.5. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | |
|
|
|