Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2016-02-16 Cont ID  
Sent By jwitmer Date 2016-02-16 Time   Rev Time 0.00
Received By jwitmer Date 2016-02-16 Time   Sent To  
Notes
2016-03-02 10:49:34BUILDING PLAN REVIEW
 W. P. B. PERMIT: 15020419
 ADD: 1309 N. FLAGLER DR. / ADDITION
 1300 N. DIXIE HWY.
 74/43/43/15/19/001/0010
 CONT: DE ANGELIS DIAMOND HEALTHCARE GROUP
 TEL: (239)594-1994
 CONTACT: ??????? NOT FILLED IN ON FORM
 E-MAIL: [email protected]
  
 2010 FLORIDA BUILDING CODE W * 2010 WEST PALM BEACH
 AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1,
 ADMINISTRATION, 2010 EDITION 2012 FBC SUPPLEMENTS
 ADOPTED APRIL 25/2013.
  
 2010 EXISTING BUILDING CODE LEVEL II 701.3 COMPLIANCE.
 ALL NEW CONSTRUCTION ELEMENTS, COMPONENTS, SYSTEMS, AND
 SPACES SHALL COMPLY WITH THE REQUIREMENTS OF THE
 FLORIDA BUILDING CODE, BUILDING.
  
 GOOD SAMARITAN MEDICAL CENTER O?KEEFEE TOWER VERTICAL
 ADDITION
  
 4TH REVIEW
 DATE: FEB. 16/2016
 ACTION: BUILDING PROVISO
  
 1) PROVISO: ART IN PUBLIC PLACES. THE CITY OF WEST PALM
 BEACH ART IN PUBLIC PLACES ORDINANCE.
  
 2) ROVISO: NOTICE ONLY, NO ACTION NEED TO BE TAKEN FOR
 PLAN REVIEW. PAPER PLANS 3 SETS OF DOCUMENTS ARE
 REQUIRED. FOR DIGITAL PLANS, AFTER PERMIT ISSUANCE, THE
 PERMIT LIBRARIAN WILL E-MAIL YOU, THE APPROVED AND
 BATCH STAMPED PLANS SO YOU MAY PRINT YOUR PLANS, TWO
 SETS OF PLANS WILL NEED TO BE PRINTED IN COLOR, (1) FOR
 THE THRESHOLD INSPECTOR, THE OTHER FOR THE MEP
 INSPECTORS.
  
 3) PROVISO: NOTICE ONLY, NO ACTION NEED TO BE TAKEN FOR
 PLAN REVIEW. PLEASE CALL THE CITY OF WEST PALM BEACHES?
 AUTOMATED TELEPHONE INSPECTIONS LINE (561) 805-6700)
 FOR IN-PROGRESS INSPECTIONS FOR AUDITING OF JOBSITE
 INSPECTIONS.
  
 4)PROVISO: NOTICE ONLY, NO ACTION NEED TO BE TAKEN FOR
 PLAN REVIEW. SECTION 109.3.6 THRESHOLD BUILDINGS,
 OPERATING GUIDELINES FOR THRESHOLD INSPECTORS #26.
 ASSURE THAT THE DESIGNER HAS REQUIRED ON THE PLANS OR
 SPECIFICATIONS ONE MATERIAL, APPROVED FOR FIRE STOPPING
 PENETRATIONS, FOR WALLS AND CEILINGS.
  
 5) PROVISO 107.3.4.2 DEFERRED SUBMITTALS. DOCUMENTS FOR
 DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE
 REGISTERED DESIGN
 PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL REVIEW
 THEM AND FORWARD THEM TO THE BUILDING OFFICIAL WITH A
 NOTATION INDICATING THAT THE DEFERRED SUBMITTAL
 DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL
 CONFORMANCE TO THE DESIGN OF THE BUILDING. THE DEFERRED
 SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE
 DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE
 BUILDING OFFICIAL.
  
 PRODUCT APPROVALS. PLEASE PROVIDE COMPLIANCE WITH: 2010
 FBC-B 1609.1.2 PROTECTION OF OPENINGS, 1609.6.4.41
 COMPONENTS & CLADDING. FLORIDA DEPARTMENT OF COMMUNITY
 AFFAIRS RULE 9N-3 NOV. 01/ 2010 (31) SUB-CATEGORY OF
 PRODUCTS OR CONSTRUCTION SYSTEMS THAT WILL REQUIRE
 PRODUCT APPROVALS:
 (31)(A) EXTERIOR DOORS.
 (B) WINDOWS
 (C) PANEL WALLS: STOREFRONTS, CURTAIN WALLS, WALL
 LOUVERS, EFIS SYSTEMS,
 (D) ROOFING PRODUCTS AND ASSEMBLIES
 (G) EXTERIOR COOLER, FREEZERS & PRE-ENGINEERED A/C
 STANDS
  
 6) BUILDING PROVISO: DUMBWAITER MANUFACTURER
 SPECIFICATIONS AND SHOP DRAWINGS ARE REQUIRED PROVIDING
 CODE COMPLIANCE WITH 2010 FBC-B 708.14 ELEVATOR,
 DUMBWAITER AND OTHER HOIST WAYS & TABLE 715.4.
  
 JAMES A. WITMER CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 TEL: 561-805-6715
 FAX: 561-805-6676
 E-MAIL: [email protected]
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2015-12-14 Cont ID  
Sent By jwitmer Date 2015-12-14 Time 09:29 Rev Time 0.00
Received By jwitmer Date 2015-12-12 Time 13:46 Sent To  
Notes
2015-12-14 09:29:16BUILDING PLAN REVIEW
 W. P. B. PERMIT: 15020419
 ADD: 1309 N. FLAGLER DR. / ADDITION
 1300 N. DIXIE HWY.
 74/43/43/15/19/001/0010
 CONT: DE ANGELIS DIAMOND HEALTHCARE GROUP
 TEL: (239)594-1994
 CONTACT: ??????? NOT FILLED IN ON FORM
 E-MAIL: [email protected]
  
 2010 FLORIDA BUILDING CODE W * 2010 WEST PALM BEACH
 AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1,
 ADMINISTRATION, 2010 EDITION 2012 FBC SUPPLEMENTS
 ADOPTED APRIL 25/2013.
  
 2010 EXISTING BUILDING CODE LEVEL II 701.3 COMPLIANCE.
 ALL NEW CONSTRUCTION ELEMENTS, COMPONENTS, SYSTEMS, AND
 SPACES SHALL COMPLY WITH THE REQUIREMENTS OF THE
 FLORIDA BUILDING CODE, BUILDING.
  
 GOOD SAMARITAN MEDICAL CENTER O?KEEFEE TOWER VERTICAL
 ADDITION
  
 3RD REVIEW
 DATE: MON. DEC. 14/ 2015
 ACTION: DENIED
  
 1) COMPLIED.
  
 2) PROVISO: ART IN PUBLIC PLACES. THE CITY OF WEST PALM
 BEACH ART IN PUBLIC PLACES ORDINANCE.
  
 3) 3RD REQUEST: ASBESTOS: IN ACCORDANCE WITH SECTION
 553.79 F. S. THIS IS TO ADVISE YOU OF THE OWNERS OR
 OPERATORS? RESPONSIBILITY TO COMPLY WITH THE STATE &
 FEDERAL ASBESTOS REGULATIONS, INCLUDING SECTION 376.60
 F. S. AND CFR 61- NESHAP REQUIREMENTS. REQUIREMENTS
 INCLUDE- ASBESTOS SURVEYS AND SUBMISSION OF WRITTEN
 NOTIFICATION TO THE DEPARTMENT OF ENVIRONMENTAL
 PROTECTION PRIOR TO: * DEMOLITION OF ALL REGULATED
 STRUCTURES;
 * MOST RENOVATION ACTIVITIES IN REGULATED STRUCTURES
 WHERE ASBESTOS IS DISTURBED OR REMOVED.
 NON-COMPLIANCE MAY RESULT IN SEVERE MONETARY PENALTY.
 FOR FURTHER INFORMATION IN PALM BEACH COUNTY, CONTACT
 THE DIVISION OF ENVIRONMENTAL HEALTH AND ENGINEERING
 HRS/ PALM BEACH COUNTY PUBLIC HEALTH UNIT
 (DIVISION OF ENGINEERING SCIENCE & ENGINEERING AIR
 POLLUTION CONTROL SECTION)
 901 EVERNIA STREET
 WEST PALM BEACH, FL 33401
 (561)355-3070
  
 4) THIS BUILDING QUALIFIES AS A THRESHOLD BUILDING.
 THRESHOLD INSPECTION PLAN FL S. S. 553.71(7) THRESHOLD
 BUILDING" MEANING ANY BUILDING WHICH IS GREATER THAN
 (3) STORIES OR 50 FT. IN HEIGHT, OR WHICH HAS AN
 ASSEMBLY OCCUPANCY CLASSIFICATION AS DENIED IN THE
 FLORIDA BUILDING CODE WHICH EXCEEDS 5,000 SQ. FT. IN
 AREA AND AN OCCUPANT CONTENT OF GREATER THAN 500
 PERSONS.
  
 4A) COMPLIED. 109.3.6.1. STRUCTURAL INSPECTION PLAN.
  
 4) COMPLIED: SPECIAL INSPECTOR FORMS.
  
 4C) COMPLIED. STATEMENT: FLORIDA STATUTE: 553.79(7).
  
 4D) COMPLIED: VOIDED RESUMES WERE SUBMITTED FOR EDDIE
 CARRETERO AND FOR WESLEY FOSTER E. I. NEITHER SHOWS
 LICENSURE AS A LICENSED INSPECTOR WITH A BN LICENSE,
 WHY ARE THEY SUBMITTED. NOT A P.E. OR BN.
  
 4E) 3RD REQUEST. I?VE ASKED KEN CONRAD IF HE HAD A COPY
 OF THE CONTRACTORS EXPERIENCE, APPARENTLY WHEN KEN
 VIEWED THE ATTACHMENT HE HAD NOT PRINTED IT AND THE
 ATTACHMENT WAS DELETED, WE HAVE NO WRITTEN RECORD OF
 THE CONTRACTORS JOB HISTORY FOR THE FILE. 7/08/2015
 E-MAIL FROM K. CONRAD ATTACHED INFORMATION WAS SENT TO
 KEN ON 5/21/15.THE CONTRACTOR WILL PRODUCE A JOB
 SUMMARY OR HISTORY FOR THIS TYPE OF CONSTRUCTION. THIS
 MAY BE SUBMITTED TO KEN CONRAD BY E-MAIL. KEN CONRAD:
 [email protected]
  
 4F)PROVISO: NOTICE ONLY, NO ACTION NEED TO BE TAKEN FOR
 PLAN REVIEW. PAPER PLANS 3 SETS OF DOCUMENTS ARE
 REQUIRED. FOR DIGITAL PLANS, AFTER PERMIT ISSUANCE, THE
 PERMIT LIBRARIAN WILL E-MAIL YOU, THE APPROVED AND
 BATCH STAMPED PLANS SO YOU MAY PRINT YOUR PLANS, TWO
 SETS OF PLANS WILL NEED TO BE PRINTED IN COLOR, (1) FOR
 THE THRESHOLD INSPECTOR, THE OTHER FOR THE MEP
 INSPECTORS.
  
 4G) PROVISO: NOTICE ONLY, NO ACTION NEED TO BE TAKEN
 FOR PLAN REVIEW. PLEASE CALL THE CITY OF WEST PALM
 BEACHES? AUTOMATED TELEPHONE INSPECTIONS LINE (561)
 805-6700) FOR IN-PROGRESS INSPECTIONS FOR AUDITING OF
 JOBSITE INSPECTIONS.
  
 4H)PROVISO: NOTICE ONLY, NO ACTION NEED TO BE TAKEN FOR
 PLAN REVIEW. SECTION 109.3.6 THRESHOLD BUILDINGS,
 OPERATING GUIDELINES FOR THRESHOLD INSPECTORS #26.
 ASSURE THAT THE DESIGNER HAS REQUIRED ON THE PLANS OR
 SPECIFICATIONS ONE MATERIAL, APPROVED FOR FIRE STOPPING
 PENETRATIONS, FOR WALLS AND CEILINGS.
  
 5) COMPLIED. FLOOD ZONE. VERTICAL ADDITION NOT IN FLOOD
 ZONE.
  
 6) COMPLIED.
  
 7) COMPLIED. LETTER SUBMITTED AND ACCEPTED FOR A (4)
 HOUR FIRE WALL SEPARATING VERTICAL ADDITION FROM THE
 REMAINDER OF THE BUILDING.
  
 8) COMPLIED.
  
 9-11) COMPLIED, 107.3.4.2 DEFERRED SUBMITTALS. PRODUCT
 APPROVALS. PLEASE PROVIDE COMPLIANCE WITH: 2010 FBC-B
 1609.1.2 PROTECTION OF OPENINGS, 1609.6.4.41 COMPONENTS
 & CLADDING. FLORIDA DEPARTMENT OF COMMUNITY AFFAIRS
 RULE 9N-3 NOV. 01/ 2010 (31) SUB-CATEGORY OF PRODUCTS
 OR CONSTRUCTION SYSTEMS THAT WILL REQUIRE PRODUCT
 APPROVALS:
 (31)(A) EXTERIOR DOORS.
 (B) WINDOWS
 (C) PANEL WALLS: STOREFRONTS, CURTAIN WALLS, WALL
 LOUVERS, EFIS SYSTEMS,
 (D) ROOFING PRODUCTS AND ASSEMBLIES
 (G) EXTERIOR COOLER, FREEZERS & PRE-ENGINEERED A/C
 STANDS
  
 12-17A-C) COMPLIED.
  
 17D & E) BUILDING PROVISO: DUMBWAITER MANUFACTURER
 SPECIFICATIONS AND SHOP DRAWINGS ARE REQUIRED PROVIDING
 CODE COMPLIANCE WITH 2010 FBC-B 708.14 ELEVATOR,
 DUMBWAITER AND OTHER HOIST WAYS & TABLE 715.4.
  
  
 17F, 17G, 18A) COMPLIED.
  
 18B) BUILDING PROVISO: DUMBWAITER MANUFACTURER
 SPECIFICATIONS AND SHOP DRAWINGS ARE REQUIRED PROVIDING
 CODE COMPLIANCE WITH 2010 FBC-B 708.14 ELEVATOR,
 DUMBWAITER AND OTHER HOISTWAYS & TABLE 715.4.
  
 18C) . COMPLIED.
  
 19) SHEET A5.5A :
  
 19A) NOT APPLICABLE, REMOVED FROM THE SCOPE OF WORK.
 ROOFING UNDER SEPARATE PERMIT.
  
 19B-C) BUILDING PROVISO: DUMBWAITER MANUFACTURER
 SPECIFICATIONS AND SHOP DRAWINGS ARE REQUIRED PROVIDING
 CODE COMPLIANCE WITH 2010 FBC-B 708.14 ELEVATOR,
 DUMBWAITER AND OTHER HOIST WAYS & TABLE 715.4.
  
 19D) COMPLIED
  
 20-23) COMPLIED
  
 24) IMPACT FEES. BEFORE A PERMIT TO CONSTRUCT, MAY BE
 ISSUED, IMPACT FEES MUST BE PAID TO PALM BEACH COUNTY.
 THE ACTUAL PERMIT SET OF PLANS MUST BE STAMPED BY THAT
 OFFICE, AND A COPY OF THE PAID RECEIPT ATTACHED TO THE
 PERMIT APPLICATION. PLEASE CALL (561)233-5025 FOR MORE
 INFORMATION.
  
 25) DIGITAL REVIEW. A TRANSMITTAL LETTER LISTING THE
 ORIGINAL REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF
 THE REVISION MADE, IDENTIFYING THE SHEET OR
 SPECIFICATION PAGE WHERE THE CHANGES CAN BE FOUND WILL
 HELP TO EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR
 ANTICIPATED COOPERATION.
  
 JAMES A. WITMER CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 TEL: 561-805-6715
 FAX: 561-805-6676
 E-MAIL: [email protected]
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2015-07-01 Cont ID  
Sent By jwitmer Date 2015-07-01 Time 06:45 Rev Time 0.00
Received By jwitmer Date   Time   Sent To  
Notes
2015-07-01 06:45:25BUILDING PLAN REVIEW
 W. P. B. PERMIT: 15020419
 ADD: 1309 N. FLAGLER DR. / ADDITION
 1300 N. DIXIE HWY.
 74/43/43/15/19/001/0010
 CONT: TBD
 TEL: (239)594-1994
 CONTACT: ??????? NOT FILLED IN ON FORM
 E-MAIL: [email protected]
  
 2010 FLORIDA BUILDING CODE W
 * 2010 WEST PALM BEACH AMENDMENTS TO THE FLORIDA
 BUILDING CODE, CHAPTER 1, ADMINISTRATION, 2010 EDITION
 2012 FBC SUPPLEMENTS ADOPTED APRIL 25/2013.
  
 2010 EXISTING BUILDING CODE LEVEL II 701.3
 COMPLIANCE. ALL NEW CONSTRUCTION ELEMENTS, COMPONENTS,
 SYSTEMS, AND SPACES SHALL COMPLY WITH THE REQUIREMENTS
 OF THE FLORIDA BUILDING CODE, BUILDING.
  
 GOOD SAMARITAN MEDICAL CENTER O?KEEFEE TOWER VERTICAL
 ADDITION
 2ND REVIEW
 DATE: TUES. JUNE 30/ 2015
 ACTION: DENIED
  
 1) COMPLIED.
  
 2) PROVISO: ART IN PUBLIC PLACES. THE CITY OF WEST PALM
 BEACH ART IN PUBLIC PLACES ORDINANCE REQUIREMENT THAT
 APPLIES TO ANY REMODEL OR NEW CONSTRUCTION PROJECT FOR
 WHICH THE PERMIT APPLICATION WAS SUBMITTED AFTER
 7/1/14, AND THE TOTAL PROJECT CONSTRUCTION COSTS ARE
 EQUAL TO OR GREATER THAN $500,000. PER CITY OF WEST
 PALM BEACH ORDINANCE NO. 4504-14, AND CITY OF WEST PALM
 BEACH CODE OF ORDINANCES, ARTICLE V, ART IN PUBLIC
 PLACES, SECTION 78-123(A) AND SECTION 78-126(A), THE
 ART ASSESSMENT IS 1% OF THE TOTAL PROJECT CONSTRUCTION
 COST.
  
 PER CITY OF WEST PALM BEACH CODE OF ORDINANCES, ARTICLE
 V, ART IN PUBLIC PLACES, SECTION 78-122, RENOVATION AND
 NEW CONSTRUCTION PROJECTS ARE ASSESSED CUMULATIVELY, SO
 THE ART ASSESSMENT WILL BE APPLICABLE TO ALL FUTURE
 PROJECTS
  
 3) 2ND REQUEST: ASBESTOS: IN ACCORDANCE WITH SECTION
 553.79 F. S. THIS IS TO ADVISE YOU OF THE OWNERS OR
 OPERATORS? RESPONSIBILITY TO COMPLY WITH THE STATE &
 FEDERAL ASBESTOS REGULATIONS, INCLUDING SECTION 376.60
 F. S. AND CFR 61- NESHAP REQUIREMENTS. REQUIREMENTS
 INCLUDE- ASBESTOS SURVEYS AND SUBMISSION OF WRITTEN
 NOTIFICATION TO THE DEPARTMENT OF ENVIRONMENTAL
 PROTECTION PRIOR TO: * DEMOLITION OF ALL REGULATED
 STRUCTURES;
 * MOST RENOVATION ACTIVITIES IN REGULATED STRUCTURES
 WHERE ASBESTOS IS DISTURBED OR REMOVED.
 NON-COMPLIANCE MAY RESULT IN SEVERE MONETARY PENALTY.
  
 FOR FURTHER INFORMATION IN PALM BEACH COUNTY, CONTACT
 THE DIVISION OF ENVIRONMENTAL HEALTH AND ENGINEERING
 HRS/ PALM BEACH COUNTY PUBLIC HEALTH UNIT
 (DIVISION OF ENGINEERING SCIENCE & ENGINEERING AIR
 POLLUTION CONTROL SECTION)
  
 901 EVERNIA STREET
 WEST PALM BEACH, FL 33401
 (561)355-3070
  
 4) THIS BUILDING QUALIFIES AS A THRESHOLD BUILDING.
 THRESHOLD INSPECTION PLAN FL S. S. 553.71(7) THRESHOLD
 BUILDING" MEANING ANY BUILDING WHICH IS GREATER THAN
 (3) STORIES OR 50 FT. IN HEIGHT, OR WHICH HAS AN
 ASSEMBLY OCCUPANCY CLASSIFICATION AS DENIED IN THE
 FLORIDA BUILDING CODE WHICH EXCEEDS 5,000 SQ. FT. IN
 AREA AND AN OCCUPANT CONTENT OF GREATER THAN 500
 PERSONS.
  
 4A)COMPLIED> 109.3.6.1 THE ENFORCING AGENCY SHALL
 REQUIRE A (WRITTEN/ TYPED) SPECIAL INSPECTOR TO PERFORM
 STRUCTURAL INSPECTIONS ON A THRESHOLD BUILDING PURSUANT
 TO A STRUCTURAL INSPECTION PLAN PREPARED BY THE
 ENGINEER OF RECORD. THE STRUCTURAL INSPECTION PLAN MUST
 BE SUBMITTED TO THE ENFORCING AGENCY PRIOR TO THE
 ISSUANCE OF A BUILDING PERMIT FOR THE CONSTRUCTION OF A
 THRESHOLD BUILDING. THE PURPOSE OF THE STRUCTURAL
 INSPECTION PLAN IS TO PROVIDE SPECIFIC INSPECTION
 PROCEDURES AND SCHEDULES SO THAT THE BUILDING CAN BE
 ADEQUATELY INSPECTED FOR COMPLIANCE WITH THE PERMITTED
 DOCUMENTS.
  
 4B) SEMI-COMPLIED. PAGE 4 LEFT BLANK, TO BE FILED OUT
 BY THE CERTIFIED INSPECTION CO. & OWNER.
 PAGE 5 LEFT BLANK TO BE FILED OUT BY ALL (3) ENTITIES,
 CONTRACTOR, ARCHITECT AND ENGINEER OF RECORD AND
 NOTARIZED.
 THRESHOLD INSPECTOR: WPB AMENDMENT 109.3.6.2 W.P.B.
 CONSTRUCTION SERVICES DEPARTMENT REQUESTS FOR THRESHOLD
 BUILDINGS A SPECIAL INSPECTOR AS REQUIRED BY FL S S
 553.79(5) FLORIDA STATUTES TO THE MINIMUM INSPECTIONS
 REQUIRED BY THIS CODE. FORMS MUST BE FILED OUT AND
 RETURNED TO THE BUILDING DEPARTMENT CAN ISSUE A PERMIT.
 CONTACT KEN CONRAD MANAGER OF THE SPECIAL INSPECTOR
 PROGRAM AT (561)805-6666 FOR FURTHER INFORMATION BEFORE
 THE PERMIT MAY BE ISSUED.
 FORMS WERE E-MAILED TO: [email protected]
 4/28/2015 08:32 AM
  
 4C) 2ND REQUEST. THE THRESHOLD BLDG., REQUIRED
 STATEMENT:
  
 FLORIDA STATUTE: 553.79(7)(D) ALL PLANS FOR THE
 BUILDING WHICH ARE REQUIRED TO BE SIGNED AND SEALED BY
 THE ARCHITECT OR ENGINEER OF RECORD CONTAIN A STATEMENT
 THAT, TO THE BEST OF THE ARCHITECT?S OR ENGINEER?S
 KNOWLEDGE, THE PLANS AND SPECIFICATIONS COMPLY WITH THE
 APPLICABLE MINIMUM BUILDING CODES AND THE APPLICABLE
 FIRESAFETY STANDARDS AS DETERMINED BY THE LOCAL
 AUTHORITY IN ACCORDANCE WITH THIS CHAPTER AND CHAPTER
 633.
  
 W.P.B. AMENDMENT 110.3.7.4.4 ALL PLANS FOR THE BUILDING
 WHICH ARE REQUIRED TO BE SIGNED AND SEALED BY THE
 ARCHITECT OR ENGINEER OF RECORD CONTAIN A STATEMENT
 THAT, TO THE BEST OF THE ARCHITECT'S OR ENGINEER'S
 KNOWLEDGE, THE PLANS AND SPECIFICATIONS COMPLY WITH THE
 APPLICABLE FIRE-SAFETY STANDARDS AS DETERMINED BY THE
 LOCAL AUTHORITY IN ACCORDANCE WITH THIS SECTION AND 633
 FLORIDA STATUTE.
  
 4D)SEMI COMPLIED. RESUMES WERE SUBMITTED FOR EDDIE
 CARRETERO AND FOR WESLEY FOSTER E. I. NEITHER SHOWS
 LICENSURE AS A LICENSED INSPECTOR WITH A BN LICENSE,
 WHY ARE THEY SUBMITTED.
  
 FOR THE SPECIAL INSPECTOR PLEASE PROVIDE A RESUME' OF
 INSPECTION EXPERIENCE ON PREVIOUS PROJECT. THE RESUME'
 MUST BE ACCOMPANIED BY ALL CERTIFICATES AS SPECIFIED
 HEREIN. THE BUILDING OFFICIAL OR HIS DESIGNEE WILL
 REVIEW THE RESUME'. AFTER THE RESUME' IS REVIEWED, AN
 INTERVIEW WILL BE SCHEDULED. UNDER NO CIRCUMSTANCES
 WILL AN INSPECTOR BE INTERVIEWED FOR WORK WITHOUT FIRST
 MEETING THE ABOVE CRITERIA.
 CONTACT KEN CONRAD
 TEL: 561-805-6666
 E-MAIL: [email protected]
  
 4E) COMPLIED. 7/08/2015 E-MAIL FROM K. CONRAD ATTACHED
 INFORMATION WAS SENT TO KEN ON 5/21/15.
 THE CONTRACTOR WILL PRODUCE A JOB SUMMARY OR HISTORY
 FOR THIS TYPE OF CONSTRUCTION. THIS MAY BE SUBMITTED TO
 KEN CONRAD BY E-MAIL. KEN CONRAD: [email protected]
  
 4F) NOTICE ONLY, NO ACTION NEED TO BE TAKEN FOR PLAN
 REVIEW. PAPER PLANS 3 SETS OF DOCUMENTS ARE REQUIRED.
 FOR DIGITAL PLANS, AFTER PERMIT ISSUANCE, THE PERMIT
 LIBRARIAN WILL E-MAIL YOU, THE APPROVED AND BATCH
 STAMPED PLANS SO YOU MAY PRINT YOUR PLANS, TWO SETS OF
 PLANS WILL NEED TO BE PRINTED IN COLOR, (1) FOR THE
 THRESHOLD INSPECTOR, THE OTHER FOR THE MEP INSPECTORS.
  
 4G) NOTICE ONLY, NO ACTION NEED TO BE TAKEN FOR PLAN
 REVIEW. PLEASE CALL THE CITY OF WEST PALM BEACHES?
 AUTOMATED TELEPHONE INSPECTIONS LINE (561) 805-6700)
 FOR IN-PROGRESS INSPECTIONS FOR AUDITING OF JOBSITE
 INSPECTIONS.
  
 4H) NOTICE ONLY, NO ACTION NEED TO BE TAKEN FOR PLAN
 REVIEW. SECTION 109.3.6 THRESHOLD BUILDINGS, OPERATING
 GUIDELINES FOR THRESHOLD INSPECTORS #26. ASSURE THAT
 THE DESIGNER HAS REQUIRED ON THE PLANS OR
 SPECIFICATIONS ONE MATERIAL, APPROVED FOR FIRE STOPPING
 PENETRATIONS, FOR WALLS AND CEILINGS.
  
 5)2ND REQUEST. THE SUBMITTED SURVEY DOES NOT INDICATE
 THE DEMARCATION LINES REPRESENTING THE A, B, & C FLOOD
 ZONES LOCATED ON THIS PROPERTY. WITH THIS INFORMATION
 WE WILL BE ABLE TO DETERMINE IF THE BUILDING ITSELF IS
 IN THE FLOOD ZONE A OR OUT OF IT. THIS NEEDS TO BE
 DETERMINED FOR DOCUMENTATION IF SUBSTANTIAL IMPROVEMENT
 IS GOING TO BE A FACTOR IN THE UPCOMING REVIEW. THIS
 PROPERTY IS LOCATED IN AN A5 FLOOD ZONE. FBC BUILDING
 1612 AND CITY OF WPB CODE OF ORDINANCES SECTION 94-546.
 STRUCTURE IS LOCATED IN AN "A" FLOOD ZONE. A FLOOD
 ELEVATION CERTIFICATE WILL BE REQUIRED. PLEASE REVIEW
 CITY ORDINANCE FOR THE CITY REQUIREMENTS REQUIRE AN
 ADDITIONAL 6 INCHES OF ELEVATION.
  
 5A) DURING THE PERMITTING OF THIS STRUCTURE THERE WILL
 BE REQUIRED (3) DIFFERENT FLOOD ZONE CERTIFICATES
 REQUIRED:
 (1) A FLOOD ZONE CERTIFICATE IS REQUIRED AS PART OF THE
 PLAN REVIEW DOCUMENTS WITH THE PROPOSED FINISH FLOOR
 HEIGHT.
 (2) ONCE THE FIRST FLOOR SLAB IS POURED THE 2ND
 ELEVATION CERTIFICATE IS REQUIRED
 (3) BEFORE THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY
 OR A CERTIFICATE OF COMPLETION THE 3RD FLOOD ZONE
 CERTIFICATE IS REQUIRED WITH THE HEIGHT OF ALL EXTERIOR
 ATTENDANTS
 A/C PADS OR OTHER SLABS FOR GENERATORS
 FEMA FORM OMB NO. 1660-0008 EXPIRES:
 JULY 31/2015
 FEMA'S NEW ELEVATION CERTIFICATE (EC) WAS APPROVED FOR
 USE, EFFECTIVE AUGUST 1/ 2013, THROUGH JULY 31/ 2015.
 FORM. ADDITIONAL INFORMATION ON THE DIFFERENCES, THE
 NEW FORM, AND INSTRUCTIONS ARE AVAILABLE AT:
 HTTP://WWW.FEMA.GOV/BUSINESS/NFIP/ELVINST.SHTM.
  
 5B) THIS SUBMITTAL A SURVEYS WAS SUBMITTED, PLEASE NO
 DOCUMENTATION WAS SUBMITTED IF THE BUILDING LOWEST
 LEVEL IS BELOW THE 7 FT. -6 IN. NGVD THE REQUIREMENTS
 FOR FLOOD PROOFING CITY MUNI CODE SECTION 94-546(B)(2)
 NONRESIDENTIAL CONSTRUCTION AND SECTION 94-611
 DEFINITIONS FOR SUBSTANTIAL IMPROVEMENTS.
 5C) 2010 FBC-B 419.4.2.2.2 FOR ALL EXISTING FACILITIES,
 THE LOWEST FLOOR ELEVATIONS OF ALL ADDITIONS, AND ALL
 PATIENT SUPPORT AREAS INCLUDING FOOD SERVICE, AND ALL
 PATIENT SUPPORT UTILITIES, INCLUDING MECHANICAL, AND
 ELECTRICAL (EXCEPT FUEL STORAGE AS NOTED IN SECTION
 419.4.2.9.3 OF THIS CODE) FOR THE ADDITIONS SHALL BE AT
 OR ABOVE THE ELEVATION OF THE EXISTING BUILDING, IF THE
 EXISTING BUILDING WAS DESIGNED AND CONSTRUCTED TO
 COMPLY WITH EITHER THE SITE STANDARDS OF SECTION 419.4
 OF THIS CODE OR LOCAL FLOOD RESISTANT REQUIREMENTS IN
 EFFECT AT THE TIME OF CONSTRUCTION, WHICHEVER REQUIRES
 THE HIGHER ELEVATION, UNLESS OTHERWISE PERMITTED BY
 SECTION 1612 OF THIS CODE. IF THE EXISTING BUILDING WAS
 CONSTRUCTED PRIOR TO THE ADOPTION OF EITHER THE SITE
 STANDARDS OF 419.4 OF THIS CODE OR LOCAL FLOOD
 RESISTANT REQUIREMENTS, THEN THE ADDITION AND ALL
 PATIENT SUPPORT AREAS AND UTILITIES FOR THE ADDITION AS
 DESCRIBED IN THIS SECTION SHALL EITHER BE DESIGNED AND
 CONSTRUCTED TO MEET THE REQUIREMENTS OF SECTION
 419.4.2.2.1 OF THIS CODE OR BE DESIGNED AND CONSTRUCTED
 TO MEET THE DRY FLOOD PROOFING REQUIREMENTS OF SECTION
 1612 OF THIS CODE.
  
 6) SEMI-COMPLIED.
 6.4 2010 FBC-EXISTING BLDG. CODE CHAPTER 10
  
 7) COMPLIED> PLEASE PROVIDE A SURVEY OF THE EXISTING
 SITE. ZONING COMMENT OF THE FOOTPRINT OF THE EXISTING
 BUILDINGS CAN NOT BE INCREASED. PLEASE PROVIDE THE
 SURVEY SO A COMPARISON OF THE PROPOSED VERTICAL
 ADDITION AND EXISTING BUILDING CAN BE COMPARED,
 VERTICAL ADDITIONS VERSES HORIZONTAL ADDITIONS.
  
 2010 EXISTING BLDG. CODE 1001.2 CREATION OR EXTENSION
 OF NONCONFORMITY.
 AN ADDITION SHALL NOT CREATE OR EXTEND ANY
 NONCONFORMITY IN THE EXISTING BUILDING TO WHICH THE
 ADDITION IS BEING MADE WITH REGARD TO ACCESSIBILITY,
 STRUCTURAL STRENGTH, FIRE SAFETY, MEANS OF EGRESS, OR
 THE CAPACITY OF MECHANICAL, PLUMBING, OR ELECTRICAL
 SYSTEMS.
 EXST. BLDG. CODE 1002.1 HEIGHT LIMITATIONS.
 1002.2 AREA LIMITATIONS.
 1002.3 FIRE PROTECTION SYSTEMS.
  
 EXST. BLDG. CODE 1001.3 OTHER WORK. ANY REPAIR OR
 ALTERATION WORK WITHIN AN EXISTING BUILDING TO WHICH AN
 ADDITION IS BEING MADE SHALL COMPLY WITH THE APPLICABLE
 REQUIREMENTS OF THE APPROPRIATE CHAPTER OF THIS CODE
 FOR THE LEVEL OF REHABILITATION UNDERTAKEN.
  
 8) 2010 FL. EXISTING BUILDING CODE PLEASE SHOW
 COMPLIANCE WITH:
  
 8A) 2ND REQUEST. PLEASE PROVIDE THE ORIGINAL DOCUMENTS
 SHOWING THIS STRUCTURE WAS ORIGINALLY DESIGNED FOR THE
 ADDITIONAL STORIES. WE ARE LOOKING AT A ACCUMULATIVE
 LOADING OF THE FOUNDATIONS AND COLUMNS. WE UNDERSTAND
 THAT THIS IS TO BE IN THE FUTURE A 10 STORY HIGH-RISE.
 IF THESE DOCUMENTS CANNOT BE PRODUCED THEN A STRUCTURAL
 ANALYSIS MUST BE COMPLETED TO THE 2010 FBC-B. EXST.
 BLDG. CODE 1003.2 ADDITIONAL GRAVITY LOADS. EXISTING
 STRUCTURAL ELEMENTS SUPPORTING ANY ADDITIONAL GRAVITY
 LOADS AS A RESULT OF ADDITIONS SHALL COMPLY WITH THE
 FLORIDA BUILDING CODE, BUILDING.
 EXCEPTIONS: 1. STRUCTURAL ELEMENTS WHOSE STRESS IS NOT
 INCREASED BY MORE THAN 5 PERCENT.
  
 8B)2ND REQUEST, THE RESPONSE INDICATES THAT A LATERAL
 ANALYSIS WAS PREFORMED, PLEASE PROVIDE THE ANALYSIS FOR
 REVIEW AND CODE COMPLIANCE. EXST. BLDG. CODE 1003.3
 LATERAL-FORCE-RESISTING SYSTEM. THE
 LATERAL-FORCE-RESISTING SYSTEM OF EXISTING BUILDINGS TO
 WHICH ADDITIONS ARE MADE SHALL COMPLY WITH SECTIONS
 1003.3.1, 1003.3.2 AND 1003.3.3.
 EXCEPTIONS: 1003 (2.) IN OTHER EXISTING BUILDINGS WHERE
 THE LATERAL-FORCE STORY SHEAR IN ANY STORY IS NOT
 INCREASED BY MORE THAN 10 PERCENT CUMULATIVE.
  
 8C) 2ND REVIEW. PLEASE SEE SHEET S5.1 CODES AND
 STANDARDS WIND LOADS WERE DESIGNED TO 180 MPH VULT AND
 C EXPOSURE.
  
 8C)(1) COMPLIED> WIND DESIGN TO 170 MPH VULT. PLEASE
 REVIEW THE 2010 FBC-B TABLE 1604.5 RISK CATEGORY OF
 BUILDINGS AND OTHER STRUCTURES. RISK CATEGORY IV
 STRUCTURES INCLUDE GROUP I-2 OCCUPANCIES AND OTHER
 STRUCTURES DESIGNED AS ESSENTIAL FACILITIES HAVING
 SURGERY OR EMERGENCY TREATMENT FACILITIES. PLEASE
 REVIEW THE 2010 FBC-B TABLE 1609B FOR RISK CATEGORY III
 AND IV BUILDINGS AND STRUCTURES. THE FIGURE SHOWS THIS
 LOCATION AS A 180 MPH, VULT WIND ZONE.
  
 2010 FBC-B 419.3 N ADDITION TO THE CODES AND STANDARDS
 REFERENCED IN SECTION 419.2 OF THIS CODE, THE FOLLOWING
 MINIMUM STANDARDS OF CONSTRUCTION AND SPECIFIED MINIMUM
 ESSENTIAL FACILITIES, SHALL APPLY TO ALL NEW HOSPITALS
 AND ALL ADDITIONS, ALTERATIONS OR RENOVATIONS TO AN
 EXISTING LICENSED HOSPITAL, AS DESCRIBED IN SECTION
 419.1 OF THIS CODE AND LISTED IN SECTION 419.3 OF THIS
 CODE.
  
 8C)(2) 2ND REQUEST. SHEET S5.1 WIND DESIGN OF C
 EXPOSURE. WHEN YOU SHOOT A VECTOR TO THE N.E. TO PALM
 BEACH A DISTANCE OF OVER 5,040 FT. OF WATER IS
 ENCOUNTERED. ON THIS SAME VECTOR FROM THE FRONT OF THE
 BUILDING TO THE N.E. YOU ENCOUNTER 509 FT. OF
 SHORELINE, THEN THE 5,040 FT. OF WATER OF THE BUILDING.
 THIS MEETS THE REQUIREMENTS FOR EXPOSURE D. THE
 RESPONSE COMMENTS TAKEN FROM ASCE 7-10 PAGE 518 ARE TO
 BE TAKEN FOR THE MWFRS NOT COMPONENTS AND CLADDING.
  
 THE LAST PARAGRAPH OF THE STATED SECTION STATES, WIND
 LOADS FOR CLADDING AND LOW-RISE BUILDING ELEMENTS ARE
 DETERMINED USING THE UPWIND EXPOSURE FOR THE SINGLE
 SURFACE ROUGHNESS IN ONE OF THE EIGHT SECTORS OF FIG.
 C26.7.5 THAT GIVES THE HIGHEST CLADDING PRESSURE.
  
 EVEN IF YOU ARE IN A TRANSITION ZONE BETWEEN 2 SURFACE
 ROUGHNESS CLASSIFICATION, YOU USE THE HIGHER PRESSURES
 FOR THAT ZONE.
  
 2010 FBC-B 1609.4.3. EXPOSURE D. EXPOSURE D SHALL APPLY
 WHERE THE GROUND SURFACE ROUGHNESS, AS DEFINED BY
 SURFACE ROUGHNESS D, PREVAILS IN THE UPWIND DIRECTION
 FOR A DISTANCE OF AT LEAST 5,000 FEET (1524 M) OR 20
 TIMES THE HEIGHT OF THE BUILDING, WHICHEVER IS GREATER.
 EXPOSURE D SHALL EXTEND INLAND FROM THE SHORELINE FOR A
 DISTANCE OF 600 FEET (183 M) OR 20 TIMES THE HEIGHT OF
 THE BUILDING, WHICHEVER IS GREATER FROM AN EXPOSURE D
 CONDITION AS DEFINED IN THE PREVIOUS SENTENCE.
  
 FBC-B HOSPITALS. 419.4.2.3 STRUCTURAL STANDARDS.
 WIND LOAD DESIGN OF THE BUILDING STRUCTURE AND EXTERIOR
 ENVELOPE INCLUDING EXTERIOR WALL SYSTEMS SHALL BE
 DESIGNED IN ACCORDANCE WITH THE CODE.
  
 9)2ND REQUEST. THE RESPONSE IS NOT CLEAR, DOES EITHER
 THE DESIGNER OF RECORD OR THE ARCHITECT WISH TO HAVE
 THE PRODUCT APPROVALS BE DEFERRED SUBMITTALS OR IS THE
 LIST ON THE FRONT PAGE WHAT IS GOING TO BE SUBMITTED
 FOR REVIEW. IF YOU WISH THE PRODUCT APPROVALS TO BE
 PART OF THE REVIEW, PLEASE SUBMIT THE COMPLETE PRODUCT
 APPROVALS IN THE VIEW FOLDER SECTION OF PROJECT DOX.
 PLEASE IDENTIFY ON ALL PRODUCT APPROVALS FOR, TYPE OF
 UNIT, SOME APPROVALS HAVE MORE THAN ONE MODEL IN THE
 APPROVAL, GLAZING, SIZES OF OPENINGS, TYPE OF GLAZING,
 IF MULLIONS ARE REQUIRED, IF THEY REQUIRE
 REINFORCEMENT, FASTENERS AND ASSOCIATED PRESSURES FOR
 THE OPENINGS.
 FOR THE ROOFING PRODUCT APPROVALS PLEASE CIRCLE THE
 SUB-SYSTEM OF THE APPROVAL, REVIEW THE ASSOCIATED
 PRESSURES AND IF ENHANCED FASTENING IS REQUIRED AND IF
 THE LIMITATIONS WILL ALLOW IT.
  
 PLEASE PROVIDE COMPLIANCE WITH: 2010 FBC-B 1609.1.2
 PROTECTION OF OPENINGS, 1609.6.4.41 COMPONENTS &
 CLADDING.
 FLORIDA DEPARTMENT OF COMMUNITY AFFAIRS RULE 9N-3 NOV.
 01/ 2010 (31) SUB-CATEGORY OF PRODUCTS OR CONSTRUCTION
 SYSTEMS THAT WILL REQUIRE PRODUCT APPROVALS:
 (31)(A) EXTERIOR DOORS.
 (B) WINDOWS
 (C) PANEL WALLS: STOREFRONTS, CURTAIN WALLS, WALL
 LOUVERS, EFIS SYSTEMS,
 (D) ROOFING PRODUCTS AND ASSEMBLIES
 (E) SHUTTERS
 (F) SKYLIGHTS
 (G) EXTERIOR COOLER, FREEZERS & PRE-ENGINEERED A/C
 STANDS
  
 9A) 2010 FBC-B 419.4.2.4 ROOFING STANDARDS.
 419.4.2.4.1
 ROOFING MEMBRANE MATERIAL SHALL RESIST THE UPLIFT
 FORCES SPECIFIED IN THE CODE. ROOF COVERINGS SHALL BE
 INSTALLED ACCORDING TO THE SPECIFICATIONS PROVIDED BY
 THE MANUFACTURER.
 419.4.2.4.2 LOOSE-LAID BALLASTED ROOFS SHALL NOT BE
 PERMITTED.
  
 419.4.2.4.3 ALL NEW ROOF APPENDAGES SUCH AS DUCTS,
 TANKS, VENTILATORS, RECEIVERS, DX CONDENSING UNITS AND
 DECORATIVE MANSARD ROOFS AND THEIR ATTACHMENT SYSTEMS
 SHALL BE STRUCTURALLY ENGINEERED TO MEET THE WIND LOAD
 REQUIREMENTS OF THE APPLICABLE BUILDING CODE. ALL OF
 THESE ATTACHMENT SYSTEMS SHALL BE CONNECTED DIRECTLY TO
 THE UNDERLYING ROOF STRUCTURE OR ROOF SUPPORT
 STRUCTURE.
  
 9B)2ND REQUEST. PLEASE REVIEW THIS SECTION, LARGE
 MISSILE IMPACT WINDOWS ARE REQUIRED.
 2010 FBC-B 419.4.2.5 EXTERIOR UNIT STANDARDS.
 419.4.2.5.1
 ALL EXTERIOR WINDOW UNITS, SKYLIGHTS, EXTERIOR LOUVERS
 AND EXTERIOR DOOR UNITS INCLUDING VISION PANELS AND
 THEIR ANCHORING SYSTEMS SHALL BE IMPACT RESISTANT OR
 PROTECTED WITH AN IMPACT RESISTANT COVERING MEETING THE
 REQUIREMENTS OF THE TESTING APPLICATION STANDARDS (TAS)
 201, 202, AND 203 OF THIS CODE IN ACCORDANCE WITH THE
 REQUIREMENTS OF SECTIONS 1626.2 THROUGH 1626.4 OF THIS
 CODE. THE IMPACT RESISTANT COVERINGS MAY BE EITHER
 PERMANENTLY ATTACHED OR MAY BE REMOVABLE IF STORED ON
 SITE OF THE FACILITY.
  
 10) 2010 FBC 107.3.4.1 PRODUCT APPROVALS. THOSE
 PRODUCTS WHICH ARE REGULATED BY THE DCA RULE 9N-03
 SHALL BE REVIEWED AND APPROVED IN WRITING BY THE
 DESIGNER OF RECORD PRIOR TO SUBMITTAL FOR
 JURISDICTIONAL APPROVAL.
 FL 61G1-23.015 (2) THE ARCHITECT IS RESPONSIBLE FOR
 SUPERVISING AND REVIEWING ALL PROJECT DATA, REPORTS,
 SHOP DRAWINGS ETC..
  
 11) ONCE THE WIND DESIGN & PRESSURES ARE CODE COMPLIANT
 IF EITHER THE DESIGNER OF RECORD OR CONTRACTOR WOULD
 PREFER TO SUBMIT THE PRODUCT APPROVALS AFTER THE
 ISSUANCE OF THE PERMIT THROUGH:
 107.3.4.2 DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS
 SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE
 PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE
 TIME OF THE APPLICATION AND THAT ARE TO BE SUBMITTED TO
 THE BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD.
 DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR
 APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED
 DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST
 THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS
 FOR REVIEW BY THE BUILDING OFFICIAL. DOCUMENTS FOR
 DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE
 REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE
 WHO SHALL REVIEW THEM AND FORWARD THEM TO THE BUILDING
 OFFICIAL WITH A NOTATION INDICATING THAT THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE
 IN GENERAL CONFORMANCE TO THE DESIGN OF THE BUILDING.
 THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED
 UNTIL THE DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN
 APPROVED BY THE BUILDING OFFICIAL.
  
 12) COMPLIED.
  
 13A-D) COMPLIED.
  
 13E)2ND REQUEST. IF THE HOSPITAL PERSONNEL ARE GOING TO
 PERFORM THE FIRE WATCH, PLEASE INDICATE THAT DURING THE
 FIRE WATCH THERE WILL BE NO OTHER DUTIES ASSIGNED TO
 THESE PERSONNEL AND ALSO PROVIDE WHAT LEVEL OF TRAINING
 THEY HAVE HAD TO PERFORM THE DUTIES OF A FIRE WATCH.
 HAVE THEY PERFORMED THESE DUTIES BEFORE, WHERE AND FOR
 HOW LONG? 107.2.1.3 ADDITIONAL INFORMATION IS REQUIRED.
 PLEASE NOTE THE FIRE DEPARTMENT HAS THE RIGHT TO REVOKE
 THIS PRIVILEGE AND ASSIGN PERSONNEL FOR THE FIRE WATCH,
 IF THE PERSONNEL ON FIRE WATCH ARE DERELICT IN THEIR
 DUTIES.
  
 COMMENT 1ST REVIEW. PLEASE PROVIDE WHICH OPTION THE
 SITE HAS CHOSEN AS AN OPTION, SHOW COMPLIANCE WITH;
 FBC-B 419.4.2.10.1 IF THE FACILITY REQUIRES FIRE
 SPRINKLERS AS PART OF ITS FIRE PROTECTION, EITHER OF
 THE FOLLOWING SHALL BE MET: AND WHO WILL PERFORM THE
 FIRE WATCH IF THIS METHOD IS CHOSEN.
  
 14)2ND REQUEST. SEMI-COMPLIED. THE DESIGNER OF RECORD
 HAS PUT NUMERICALLY NUMBERED IDENTIFICATION TAGS FOR
 THE TEMPORARY STAIRS & BACK HOIST BUT THERE ARE NO KEY
 NOTES THAT ASSOCIATE WITH THESE NUMBERS. WHEN YOU WALK
 OUT OF EITHER THE VERTICAL EXIT STAIR # 15 OR THE EXIT
 DOORWAY 41 THERE APPEARS TO BE NO PROTECTION OVER THIS
 AREA FROM FALLING OBJECTS.
  
 COMMENT FROM 1ST REVIEW. SHEET 017-A1.1 VS. A1.2,
 SHEET018- A1.2 THE 2ND LEVEL SHOWS A TEMPORARY STAIR
 TOWER AND TEMPORARY BUCK-HOIST LOCATION NOT SHOWN ON
 THE 1ST FLOOR PLANS. PLEASE PROVIDE HOW WILL THE
 OCCUPANTS BE PROTECTED DURING CONSTRUCTION AND IN
 COMPLIANCE WITH FBC-B 3306.7 COVERED WALKWAYS. THE
 TEMPORARY STAIRS DOES NOT ADDRESS THIS ISSUE OF THE
 EXITING OF THE 1ST FLOOR.
  
 15) COMPLIED.
  
 16) 2ND REQUEST. THE RESPONSE LETTER INDICATES THERE
 ARE KEY NOTES THAT ARE ASSOCIATED WITH THE NUMERICALLY
 NUMBERED IDENTIFICATION TAGS, THESE NOTES ARE MISSING
 FROM THESE SHEETS 017-A1.1 & 018-A.1.2.
  
 COMMENT FROM 1ST REVIEW. SHEET A1.2 ALSO INDICATES THAT
 THIS EXIT WILL BE TEMPORARILY CLOSED AND THE EXIT SIGN
 REMOVED. PLEASE PROVIDE A CODE COMPLIANT EXIT PLAN
 DURING THE TIME THE EXIT WILL NOT BE AVAILABLE. IN
 ESSENCE IT CREATES A DEAD END FOR BOTH THE NORTH AND
 SOUTH CORRIDORS. FBC-B 1018.4.
  
 17) LIFE SAFETY SHEET A1.3 & SHEET A5.3A SHOW 1 HOUR
 FIRE RATED WALLS:
  
 17A-C) COMPLIED.
  
 17D & E) BUILDING PROVISO: DUMBWAITER MANUFACTURER
 SPECIFICATIONS AND SHOP DRAWINGS ARE REQUIRED PROVIDING
 CODE COMPLIANCE WITH 2010 FBC-B 708.14 ELEVATOR,
 DUMBWAITER AND OTHER HOISTWAYS & TABLE 715.4.
  
 17F)COMPLIED.
  
 17G) THE RESPONSE INDICATES THE WALL THAT SEPARATES THE
 ATRIUM FROM THE FUTURE HIGH RISE PORTION OF THE
 BUILDING, IS A 4 HOUR FIRE WALL SEPARATING THE
 STRUCTURE INTO 2 SEPARATE BUILDING. DOES THIS ALSO MEAN
 THAT ALL OF THE DOORS IN THIS 4 HOUR RATED WALL ARE 3
 HOUR FIRE RATED ASSEMBLIES, DOORS AND FRAMES? AND MEET
 ALL OF THE REQUIREMENTS NO GLAZING IN THESE DOOR UNITS
 AND NO SIDELIGHTS?
  
 1ST REVIEW COMMENT. NOTE DOES THE OVERLOOK 330 & 569
 HAVE 1 HOUR PROTECTION IS THIS CONSIDERED PART OF AN
 ATRIUM? THERE IS NO 2ND FLOOR PLANS IN THE 500 SERIES
 DRAWINGS IS THIS A ATRIUM A 3 STORY ATRIUM REQUIRING
 SMOKE CONTROL A NOTE ON THE PLANS INDICATES A PRIVATE
 BRIDGE BELOW? FBC-B 404.5. SHEET A5.5A THE 5TH LEVEL,
 SECTION 404.6 EXCEPTION # 3 ONLY ALLOWS FOR THE
 ADJACENT SPACES OF ANY THREE FLOORS OF THE ATRIUM SHALL
 NOT BE REQUIRED TO BE SEPARATED FROM THE ATRIUM WHERE
 SUCH SPACES ARE ACCOUNTED FOR IN THE DESIGN OF THE
 SMOKE CONTROL SYSTEM. NOTE THIS IS THE 5TH LEVEL OF THE
 BUILDING.
  
 18-18A) COMPLIED
  
 18B) BUILDING PROVISO: DUMBWAITER MANUFACTURER
 SPECIFICATIONS AND SHOP DRAWINGS ARE REQUIRED PROVIDING
 CODE COMPLIANCE WITH 2010 FBC-B 708.14 ELEVATOR,
 DUMBWAITER AND OTHER HOISTWAYS & TABLE 715.4.
 18C) . COMPLIED.
 19) SHEET A5.5A :
  
 19A) NOT APPLICABLE, REMOVED FROM THE SCOPE OF WORK.
  
 19B-C) BUILDING PROVISO: DUMBWAITER MANUFACTURER
 SPECIFICATIONS AND SHOP DRAWINGS ARE REQUIRED PROVIDING
 CODE COMPLIANCE WITH 2010 FBC-B 708.14 ELEVATOR,
 DUMBWAITER AND OTHER HOISTWAYS & TABLE 715.4.
  
 19D) COMPLIED
  
 20-23) COMPLIED
  
 24) IMPACT FEES BEFORE A PERMIT TO CONSTRUCT, MAY BE
 ISSUED, IMPACT FEES MUST BE PAID TO PALM BEACH COUNTY.
 THE ACTUAL PERMIT SET OF PLANS MUST BE STAMPED BY THAT
 OFFICE, AND A COPY OF THE PAID RECEIPT ATTACHED TO THE
 PERMIT APPLICATION. PLEASE CALL (561)233-5025 FOR MORE
 INFORMATION.
  
 25) A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION
 MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGES CAN BE FOUND WILL HELP TO EXPEDITE YOUR
 PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION.
  
 JAMES A. WITMER CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 TEL: 561-805-6715
 FAX: 561-805-6676
 E-MAIL: [email protected]
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2015-05-08 Cont ID  
Sent By jwitmer Date 2015-05-08 Time 08:07 Rev Time  
Received By jwitmer Date 2015-04-28 Time 05:47 Sent To  
Notes
2015-04-29 08:28:56BUILDING PLAN REVIEW
 W. P. B. PERMIT: 15020419
 ADD: 1309 N. FLAGLER DR. / ADDITION
 1300 N. DIXIE HWY.
 74/43/43/15/19/001/0010
 CONT: TBD
 TEL: (239)594-1994
 CONTACT: ??????? NOT FILLED IN ON FORM
 E-MAIL: [email protected]
  
 2010 FLORIDA BUILDING CODE W
 * 2010 WEST PALM BEACH AMENDMENTS TO THE FLORIDA
 BUILDING CODE, CHAPTER 1, ADMINISTRATION, 2010 EDITION
 2012 FBC SUPPLEMENTS ADOPTED APRIL 25/2013.
  
 2010 EXISTING BUILDING CODE LEVEL II 701.3
 COMPLIANCE. ALL NEW CONSTRUCTION ELEMENTS, COMPONENTS,
 SYSTEMS, AND SPACES SHALL COMPLY WITH THE REQUIREMENTS
 OF THE FLORIDA BUILDING CODE, BUILDING.
  
 GOOD SAMARITAN MEDICAL CENTER O?KEEFEE TOWER VERTICAL
 ADDITION
 1ST REVIEW
 DATE: TUES. APRIL 28
 ACTION: DENIED
  
 1) THE DRAWING INDEX SHEET X1.1 IS NOT IN ORDER AS
 DESCRIBED ON SHEET X1.1. A INDEX IN GENERAL CAN BE
 LISTED (2) WAYS, BY ALPHABETICAL LIST AS IN A
 DICTIONARY OR BY A LIST OF ITEMS (AS TOPICS OR NAMES)
 TREATED IN A PRINTED WORK THAT GIVES FOR EACH ITEM THE
 PAGE NUMBER WHERE IT MAY BE FOUND .
 IT APPEARS THAT NEITHER HAS BEEN FOLLOWED COMPLETELY.
 IN THE ARCHITECTURAL SHEETS THE PAGES ARE NOT
 SEQUENTIALLY IN ORDER, THE DRAWING INDEX LIST IS
 MISSING A S-5.3.1 SHEET, LOCATED AFTER THE
 ARCHITECTURAL SHEETS. IT IS VERY, VERY TIME CONSUMING
 WHEN THE PLANS ARE NOT IN ORDER OF THE INDEX, TRYING TO
 LOCATE A PARTICULAR SHEET, WE HAVE NO WAY OF FINDING A
 CERTAIN SHEET IN A TIMELY MANNER.
  
 2010 WEST PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING
 CODE, CHAPTER 1, ADMINISTRATION,
 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
 ELECTRONIC MEDIA DOCUMENTS SHALL BE
 SUBMITTED WHEN APPROVED BY THE BUILDING OFFICIAL.
 CONSTRUCTION DOCUMENTS SHALL BE OF SUFFICIENT CLARITY
 TO INDICATE THE LOCATION, NATURE AND EXTENT OF THE WORK
 PROPOSED.
  
 107.2.1.4 QUALITY OF BUILDING PLANS. BUILDING PLANS
 SHALL BE DRAWN TO A MINIMUM 1/8 INCH SCALE UPON
 SUBSTANTIAL PAPER, CLOTH OR OTHER ACCEPTABLE MEDIUM.
 THE BUILDING OFFICIAL MAY ESTABLISH THROUGH
 DEPARTMENTAL POLICY, OTHER STANDARDS FOR PLANS AND
 SPECIFICATIONS, IN ORDER TO PROVIDE CONFORMITY TO ITS
 RECORD RETENTION PROGRAM. THIS POLICY MAY INCLUDE SUCH
 THINGS AS MINIMUM SIZE, SHAPE, CONTRAST, CLARITY, OR
 OTHER ITEMS RELATED TO RECORDS MANAGEMENT. ELECTRONIC
 MEDIA MUST BE COMPATIBLE WITH THE ARCHIVE REQUIREMENTS
 OF FLORIDA STATUTES.
  
 BEFORE THE NEXT ELECTRONIC SUBMITTAL PLEASE CONTACT THE
 ELECTRONIC DIGITAL LIBERIAN CAROLINE PUELL FOR FURTHER
 INSTRUCTIONS. CITY STAFF WILL HAVE TO PUT THE PAGES IN
 ORDER TO MATCH THE DRAWING INDEX SHEET. THE OTHER ISSUE
 IS THE NAMING CONVENTION THE CITY HAS RECOMMENDED WAS
 NOT USED EITHER AND THE CITY STAFF WILL ALSO NEED TO
 CLEAN UP THIS MATTER BEFORE THE NEXT UPLOAD CAN BE
 COMPLETED AND GIVEN OUT TO THE PLAN REVIEWERS. PLEASE
 CONTACT CAROLINE PUELL LIBERIAN FOR HOW THE RENAMING OF
 THE FILES WILL HAPPEN AND TO WHAT SHEETS THE RENAMING
 CONVENTION STARTS.
  
 2) ART IN PUBLIC PLACES. THE CITY OF WEST PALM BEACH
 ART IN PUBLIC PLACES ORDINANCE REQUIREMENT THAT APPLIES
 TO ANY REMODEL OR NEW CONSTRUCTION PROJECT FOR WHICH
 THE PERMIT APPLICATION WAS SUBMITTED AFTER 7/1/14, AND
 THE TOTAL PROJECT CONSTRUCTION COSTS ARE EQUAL TO OR
 GREATER THAN $500,000. PER CITY OF WEST PALM BEACH
 ORDINANCE NO. 4504-14, AND CITY OF WEST PALM BEACH CODE
 OF ORDINANCES, ARTICLE V, ART IN PUBLIC PLACES, SECTION
 78-123(A) AND SECTION 78-126(A), THE ART ASSESSMENT IS
 1% OF THE TOTAL PROJECT CONSTRUCTION COST.
  
 PER CITY OF WEST PALM BEACH CODE OF ORDINANCES, ARTICLE
 V, ART IN PUBLIC PLACES, SECTION 78-122, RENOVATION AND
 NEW CONSTRUCTION PROJECTS ARE ASSESSED CUMULATIVELY, SO
 THE ART ASSESSMENT WILL BE APPLICABLE TO ALL FUTURE
 PROJECTS
  
 3) ASBESTOS: IN ACCORDANCE WITH SECTION 553.79 F. S.
 THIS IS TO ADVISE YOU OF THE OWNERS OR OPERATORS?
 RESPONSIBILITY TO COMPLY WITH THE STATE & FEDERAL
 ASBESTOS REGULATIONS, INCLUDING SECTION 376.60 F. S.
 AND CFR 61- NESHAP REQUIREMENTS. REQUIREMENTS INCLUDE-
 ASBESTOS SURVEYS AND SUBMISSION OF WRITTEN NOTIFICATION
 TO THE DEPARTMENT OF ENVIRONMENTAL PROTECTION PRIOR TO:
 * DEMOLITION OF ALL REGULATED STRUCTURES;
 * MOST RENOVATION ACTIVITIES IN REGULATED STRUCTURES
 WHERE ASBESTOS IS DISTURBED OR REMOVED.
 NON-COMPLIANCE MAY RESULT IN SEVERE MONETARY PENALTY.
  
 FOR FURTHER INFORMATION IN PALM BEACH COUNTY, CONTACT
 THE DIVISION OF ENVIRONMENTAL HEALTH AND ENGINEERING
 HRS/ PALM BEACH COUNTY PUBLIC HEALTH UNIT
 (DIVISION OF ENGINEERING SCIENCE & ENGINEERING AIR
 POLLUTION CONTROL SECTION)
  
 901 EVERNIA STREET
 WEST PALM BEACH, FL 33401
 (561)355-3070
  
 4) THIS BUILDING QUALIFIES AS A THRESHOLD BUILDING.
 THRESHOLD INSPECTION PLAN FL S. S. 553.71(7) ?THRESHOLD
 BUILDING" MEANING ANY BUILDING WHICH IS GREATER THAN
 (3) STORIES OR 50 FT. IN HEIGHT, OR WHICH HAS AN
 ASSEMBLY OCCUPANCY CLASSIFICATION AS DENIED IN THE
 FLORIDA BUILDING CODE WHICH EXCEEDS 5,000 SQ. FT. IN
 AREA AND AN OCCUPANT CONTENT OF GREATER THAN 500
 PERSONS.
  
 4A)COMPLIED> 109.3.6.1 THE ENFORCING AGENCY SHALL
 REQUIRE A (WRITTEN/ TYPED) SPECIAL INSPECTOR TO PERFORM
 STRUCTURAL INSPECTIONS ON A THRESHOLD BUILDING PURSUANT
 TO A STRUCTURAL INSPECTION PLAN PREPARED BY THE
 ENGINEER OF RECORD. THE STRUCTURAL INSPECTION PLAN MUST
 BE SUBMITTED TO THE ENFORCING AGENCY PRIOR TO THE
 ISSUANCE OF A BUILDING PERMIT FOR THE CONSTRUCTION OF A
 THRESHOLD BUILDING. THE PURPOSE OF THE STRUCTURAL
 INSPECTION PLAN IS TO PROVIDE SPECIFIC INSPECTION
 PROCEDURES AND SCHEDULES SO THAT THE BUILDING CAN BE
 ADEQUATELY INSPECTED FOR COMPLIANCE WITH THE PERMITTED
 DOCUMENTS.
  
 4B) THRESHOLD INSPECTOR: WPB AMENDMENT 109.3.6.2 W.P.B.
 CONSTRUCTION SERVICES DEPARTMENT REQUEST FOR THRESHOLD
 BUILDINGS A SPECIAL INSPECTOR AS REQUIRED BY FL S S
 553.79(5) FLORIDA STATUTES TO THE MINIMUM INSPECTIONS
 REQUIRED BY THIS CODE. FORMS MUST BE FILED OUT AND
 RETURNED TO THE BBUILDING DEPARTMENT CAN ISSUE A
 PERMIT. CONTACT KEN CONRAD MANAGER OF THE SPECIAL
 INSPECTOR PROGRAM AT (561)805-6666 FOR FURTHER
 INFORMATION BEFORE THE PERMIT MAY BE ISSUED.
 FORMS WERE E-MAILED TO: [email protected]
 4/28/2015 08:32 AM
  
 4C) THRESHOLD BLDG., REQUIRED STATEMENT: W.P.B.
 AMENDMENT 110.3.7.4.4 ALL PLANS FOR THE BUILDING WHICH
 ARE REQUIRED TO BE SIGNED AND SEALED BY THE ARCHITECT
 OR ENGINEER OF RECORD CONTAIN A STATEMENT THAT, TO THE
 BEST OF THE ARCHITECT'S OR ENGINEER'S KNOWLEDGE, THE
 PLANS AND SPECIFICATIONS COMPLY WITH THE APPLICABLE
 FIRE-SAFETY STANDARDS AS DETERMINED BY THE LOCAL
 AUTHORITY IN ACCORDANCE WITH THIS SECTION AND 633
 FLORIDA STATUTE.
  
 4D) FOR THE SPECIAL INSPECTOR PLEASE PROVIDE A RESUME'
 OF INSPECTION EXPERIENCE ON PREVIOUS PROJECT. THE
 RESUME' MUST BE ACCOMPANIED BY ALL CERTIFICATES AS
 SPECIFIED HEREIN. THE BUILDING OFFICIAL OR HIS DESIGNEE
 WILL REVIEW THE RESUME'. AFTER THE RESUME' IS REVIEWED,
 AN INTERVIEW WILL BE SCHEDULED. UNDER NO CIRCUMSTANCES
 WILL AN INSPECTOR BE INTERVIEWED FOR WORK WITHOUT FIRST
 MEETING THE ABOVE CRITERIA.
 CONTACT KEN CONRAD
 TEL: 561-805-6666
 E-MAIL: [email protected]
  
 4E) THE CONTRACTOR WILL PRODUCE A JOB SUMMARY OR
 HISTORY FOR THIS TYPE OF CONSTRUCTION. THIS MAY BE
 SUBMITTED TO KEN CONRAD BY E-MAIL. KEN CONRAD:
 [email protected]
  
 4F) NOTICE ONLY, NO ACTION NEED TO BE TAKEN FOR PLAN
 REVIEW. PAPER PLANS 3 SETS OF DOCUMENTS ARE REQUIRED.
 FOR DIGITAL PLANS, AFTER PERMIT ISSUANCE, THE PERMIT
 LIBRARIAN WILL E-MAIL YOU, THE APPROVED AND BATCH
 STAMPED PLANS SO YOU MAY PRINT YOUR PLANS, TWO SETS OF
 PLANS WILL NEED TO BE PRINTED IN COLOR, (1) FOR THE
 THRESHOLD INSPECTOR, THE OTHER FOR THE MEP INSPECTORS.
  
 4G) NOTICE ONLY, NO ACTION NEED TO BE TAKEN FOR PLAN
 REVIEW. PLEASE CALL THE CITY OF WEST PALM BEACH?S
 AUTOMATED TELEPHONE INSPECTIONS LINE (561) 805-6700)
 FOR IN-PROGRESS INSPECTIONS FOR AUDITING OF JOBSITE
 INSPECTIONS.
  
 4H) NOTICE ONLY, NO ACTION NEED TO BE TAKEN FOR PLAN
 REVIEW. SECTION 109.3.6 THRESHOLD BUILDINGS, OPERATING
 GUIDELINES FOR THRESHOLD INSPECTORS #26. ASSURE THAT
 THE DESIGNER HAS REQUIRED ON THE PLANS OR
 SPECIFICATIONS ONE MATERIAL, APPROVED FOR FIRE STOPPING
 PENETRATIONS, FOR WALLS AND CEILINGS.
  
 5) THIS PROPERTY IS LOCATED IN AN A5 FLOOD ZONE. FBC
 BUILDING 1612 AND CITY OF WPB CODE OF ORDINANCES
 SECTION 94-546. STRUCTURE IS LOCATED IN AN "A" FLOOD
 ZONE. A FLOOD ELEVATION CERTIFICATE WILL BE REQUIRED.
 PLEASE REVIEW CITY ORDINANCE FOR THE CITY REQUIREMENTS
 REQUIRE AN ADDITIONAL 6 INCHES OF ELEVATION.
  
 5A) DURING THE PERMITTING OF THIS STRUCTURE THERE WILL
 BE REQUIRED (3) DIFFERENT FLOOD ZONE CERTIFICATES
 REQUIRED:
 (1) A FLOOD ZONE CERTIFICATE IS REQUIRED AS PART OF THE
 PLAN REVIEW DOCUMENTS WITH THE PROPOSED FINISH FLOOR
 HEIGHT.
 (2) ONCE THE FIRST FLOOR SLAB IS POURED THE 2ND
 ELEVATION CERTIFICATE IS REQUIRED
 (3) BEFORE THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY
 OR A CERTIFICATE OF COMPLETION THE 3RD FLOOD ZONE
 CERTIFICATE IS REQUIRED WITH THE HEIGHT OF ALL EXTERIOR
 ATTENDANTS
 A/C PADS OR OTHER SLABS FOR GENERATORS
 FEMA FORM OMB NO. 1660-0008 EXPIRES:
 JULY 31/2015
 FEMA'S NEW ELEVATION CERTIFICATE (EC) WAS APPROVED FOR
 USE, EFFECTIVE AUGUST 1/ 2013, THROUGH JULY 31/ 2015.
 FORM. ADDITIONAL INFORMATION ON THE DIFFERENCES, THE
 NEW FORM, AND INSTRUCTIONS ARE AVAILABLE AT:
 HTTP://WWW.FEMA.GOV/BUSINESS/NFIP/ELVINST.SHTM.
  
 5B) THIS SUBMITTAL NO SURVEYS WERE SUBMITTED, PLEASE
 NOTE IF THE BUILDING LOWEST LEVEL IS BELOW THE 7?-6?
 NGVD THE REQUIREMENTS FOR FLOOD PROOFING CITY MUNI CODE
 SECTION 94-546(B)(2) NONRESIDENTIAL CONSTRUCTION AND
 SECTION 94-611 DEFINITIONS FOR SUBSTANTIAL
 IMPROVEMENTS.
 5C) 2010 FBC-B 419.4.2.2.2 FOR ALL EXISTING FACILITIES,
 THE LOWEST FLOOR ELEVATIONS OF ALL ADDITIONS, AND ALL
 PATIENT SUPPORT AREAS INCLUDING FOOD SERVICE, AND ALL
 PATIENT SUPPORT UTILITIES, INCLUDING MECHANICAL, AND
 ELECTRICAL (EXCEPT FUEL STORAGE AS NOTED IN SECTION
 419.4.2.9.3 OF THIS CODE) FOR THE ADDITIONS SHALL BE AT
 OR ABOVE THE ELEVATION OF THE EXISTING BUILDING, IF THE
 EXISTING BUILDING WAS DESIGNED AND CONSTRUCTED TO
 COMPLY WITH EITHER THE SITE STANDARDS OF SECTION 419.4
 OF THIS CODE OR LOCAL FLOOD RESISTANT REQUIREMENTS IN
 EFFECT AT THE TIME OF CONSTRUCTION, WHICHEVER REQUIRES
 THE HIGHER ELEVATION, UNLESS OTHERWISE PERMITTED BY
 SECTION 1612 OF THIS CODE. IF THE EXISTING BUILDING WAS
 CONSTRUCTED PRIOR TO THE ADOPTION OF EITHER THE SITE
 STANDARDS OF 419.4 OF THIS CODE OR LOCAL FLOOD
 RESISTANT REQUIREMENTS, THEN THE ADDITION AND ALL
 PATIENT SUPPORT AREAS AND UTILITIES FOR THE ADDITION AS
 DESCRIBED IN THIS SECTION SHALL EITHER BE DESIGNED AND
 CONSTRUCTED TO MEET THE REQUIREMENTS OF SECTION
 419.4.2.2.1 OF THIS CODE OR BE DESIGNED AND CONSTRUCTED
 TO MEET THE DRY FLOOD PROOFING REQUIREMENTS OF SECTION
 1612 OF THIS CODE.
  
 6) PLEASE PROVIDE WHERE THIS INFORMATION CAN BE FOUND?
 NOT FOUND ON A.2.1 CODE CRITERIA NOR LIFE SAFETY
 SHEETS. 2010 WEST PALM BEACH AMENDMENTS TO THE FLORIDA
 BUILDING CODE, CHAPTER 1, ADMINISTRATION 107.3.5.1.1
 COMMERCIAL BUILDINGS:
 6.1OCCUPANCY GROUP AND SPECIAL OCCUPANCY REQUIREMENTS
 SHALL BE DETERMINED.
 6.2 MINIMUM TYPE OF CONSTRUCTION SHALL BE DETERMINED
 (SEE TABLE 503).
 6.3 FIRE SPRINKLERS ? REQUIRED?
 6.4 2010 FBC-EXISTING BLDG. CODE CHAPTER 10
  
 7) PLEASE PROVIDE A SURVEY OF THE EXISTING SITE. ZONING
 COMMENT OF THE FOOTPRINT OF THE EXISTING BUILDINGS CAN
 NOT BE INCREASED. PLEASE PROVIDE THE SURVEY SO A
 COMPARISON OF THE PROPOSED VERTICAL ADDITION AND
 EXISTING BUILDING CAN BE COMPARED, VERTICAL ADDITIONS
 VERSES HORIZONTAL ADDITIONS.
  
 2010 EXISTING BLDG. CODE 1001.2 CREATION OR EXTENSION
 OF NONCONFORMITY.
 AN ADDITION SHALL NOT CREATE OR EXTEND ANY
 NONCONFORMITY IN THE EXISTING BUILDING TO WHICH THE
 ADDITION IS BEING MADE WITH REGARD TO ACCESSIBILITY,
 STRUCTURAL STRENGTH, FIRE SAFETY, MEANS OF EGRESS, OR
 THE CAPACITY OF MECHANICAL, PLUMBING, OR ELECTRICAL
 SYSTEMS.
 EXST. BLDG. CODE 1002.1 HEIGHT LIMITATIONS.
 1002.2 AREA LIMITATIONS.
 1002.3 FIRE PROTECTION SYSTEMS.
  
 EXST. BLDG. CODE 1001.3 OTHER WORK. ANY REPAIR OR
 ALTERATION WORK WITHIN AN EXISTING BUILDING TO WHICH AN
 ADDITION IS BEING MADE SHALL COMPLY WITH THE APPLICABLE
 REQUIREMENTS OF THE APPROPRIATE CHAPTER OF THIS CODE
 FOR THE LEVEL OF REHABILITATION UNDERTAKEN.
  
 8) 2010 FL. EXISTING BUILDING CODE PLEASE SHOW
 COMPLIANCE WITH:
 8A) EXST. BLDG. CODE 1003.2 ADDITIONAL GRAVITY LOADS.
 EXISTING STRUCTURAL ELEMENTS SUPPORTING ANY ADDITIONAL
 GRAVITY LOADS AS A RESULT OF ADDITIONS SHALL COMPLY
 WITH THE FLORIDA BUILDING CODE, BUILDING.
 EXCEPTIONS: 1. STRUCTURAL ELEMENTS WHOSE STRESS IS NOT
 INCREASED BY MORE THAN 5 PERCENT.
  
 8B) EXST. BLDG. CODE 1003.3 LATERAL-FORCE-RESISTING
 SYSTEM. THE LATERAL-FORCE-RESISTING SYSTEM OF EXISTING
 BUILDINGS TO WHICH ADDITIONS ARE MADE SHALL COMPLY WITH
 SECTIONS 1003.3.1, 1003.3.2 AND 1003.3.3.
 EXCEPTIONS: 1003 (2.) IN OTHER EXISTING BUILDINGS WHERE
 THE LATERAL-FORCE STORY SHEAR IN ANY STORY IS NOT
 INCREASED BY MORE THAN 10 PERCENT CUMULATIVE.
  
 8C) PLEASE SEE SHEET S5.1 CODES AND STANDARDS WIND
 LOADS WERE DESIGNED TO 170 MPH VULT AND C EXPOSURE.
  
 8C)(1) WIND DESIGN TO 170 MPH VULT. PLEASE REVIEW THE
 2010 FBC-B TABLE 1604.5 RISK CATEGORY OF BUILDINGS AND
 OTHER STRUCTURES. RISK CATEGORY IV STRUCTURES INCLUDE
 GROUP I-2 OCCUPANCIES AND OTHER STRUCTURES DESIGNED AS
 ESSENTIAL FACILITIES HAVING SURGERY OR EMERGENCY
 TREATMENT FACILITIES. PLEASE REVIEW THE 2010 FBC-B
 TABLE 1609B FOR RISK CATEGORY III AND IV BUILDINGS AND
 STRUCTURES. THE FIGURE SHOWS THIS LOCATION AS A 180
 MPH, VULT WIND ZONE.
  
 2010 FBC-B 419.3 N ADDITION TO THE CODES AND STANDARDS
 REFERENCED IN SECTION 419.2 OF THIS CODE, THE FOLLOWING
 MINIMUM STANDARDS OF CONSTRUCTION AND SPECIFIED MINIMUM
 ESSENTIAL FACILITIES, SHALL APPLY TO ALL NEW HOSPITALS
 AND ALL ADDITIONS, ALTERATIONS OR RENOVATIONS TO AN
 EXISTING LICENSED HOSPITAL, AS DESCRIBED IN SECTION
 419.1 OF THIS CODE AND LISTED IN SECTION 419.3 OF THIS
 CODE.
  
 8C)(2) SHEET S5.1 WIND DESIGN OF C EXPOSURE. WHEN YOU
 SHOOT A VECTOR TO THE N.E. TO PALM BEACH COUNTRY CLUB A
 DISTANCE OF OVER 7,000 FT. OF WATER IS ENCOUNTERED,
 WHEN A VECTOR TO THE S. E. TO # 1 VIA SUNNY , PALM BCH.
 A DISTANCE OF 5,562 FT. IS ENCOUNTERED. DEPENDING ON
 WHERE THE DISTANCE FROM SHORELINE WITH NO OBSTRUCTIONS
 YOU GET 508FT, 588 FT. OR 414 FT. TO THE FRONT OF THE
 BUILDING.
  
 2010 FBC-B 1609.4.3. EXPOSURE D. EXPOSURE D SHALL APPLY
 WHERE THE GROUND SURFACE ROUGHNESS, AS DEFINED BY
 SURFACE ROUGHNESS D, PREVAILS IN THE UPWIND DIRECTION
 FOR A DISTANCE OF AT LEAST 5,000 FEET (1524 M) OR 20
 TIMES THE HEIGHT OF THE BUILDING, WHICHEVER IS GREATER.
 EXPOSURE D SHALL EXTEND INLAND FROM THE SHORELINE FOR A
 DISTANCE OF 600 FEET (183 M) OR 20 TIMES THE HEIGHT OF
 THE BUILDING, WHICHEVER IS GREATER FROM AN EXPOSURE D
 CONDITION AS DEFINED IN THE PREVIOUS SENTENCE.
  
 FBC-B HOSPITALS. 419.4.2.3 STRUCTURAL STANDARDS.
 WIND LOAD DESIGN OF THE BUILDING STRUCTURE AND EXTERIOR
 ENVELOPE INCLUDING EXTERIOR WALL SYSTEMS SHALL BE
 DESIGNED IN ACCORDANCE WITH THE CODE.
  
 9) PLEASE PROVIDE COMPLIANCE WITH: 2010 FBC-B 1609.1.2
 PROTECTION OF OPENINGS, 1609.6.4.41 COMPONENTS &
 CLADDING.
 FLORIDA DEPARTMENT OF COMMUNITY AFFAIRS RULE 9N-3 NOV.
 01/ 2010 (31) SUB-CATEGORY OF PRODUCTS OR CONSTRUCTION
 SYSTEMS THAT WILL REQUIRE PRODUCT APPROVALS:
 (31)(A) EXTERIOR DOORS.
 (B) WINDOWS
 (C) PANEL WALLS: STOREFRONTS, CURTAIN WALLS, WALL
 LOUVERS, EFIS SYSTEMS,
 (D) ROOFING PRODUCTS AND ASSEMBLIES
 (E) SHUTTERS
 (F) SKYLIGHTS
 (G) EXTERIOR COOLER, FREEZERS & PRE-ENGINEERED A/C
 STANDS
  
 9A) 2010 FBC-B 419.4.2.4 ROOFING STANDARDS.
 419.4.2.4.1
 ROOFING MEMBRANE MATERIAL SHALL RESIST THE UPLIFT
 FORCES SPECIFIED IN THE CODE. ROOF COVERINGS SHALL BE
 INSTALLED ACCORDING TO THE SPECIFICATIONS PROVIDED BY
 THE MANUFACTURER.
 419.4.2.4.2 LOOSE-LAID BALLASTED ROOFS SHALL NOT BE
 PERMITTED.
  
 419.4.2.4.3 ALL NEW ROOF APPENDAGES SUCH AS DUCTS,
 TANKS, VENTILATORS, RECEIVERS, DX CONDENSING UNITS AND
 DECORATIVE MANSARD ROOFS AND THEIR ATTACHMENT SYSTEMS
 SHALL BE STRUCTURALLY ENGINEERED TO MEET THE WIND LOAD
 REQUIREMENTS OF THE APPLICABLE BUILDING CODE. ALL OF
 THESE ATTACHMENT SYSTEMS SHALL BE CONNECTED DIRECTLY TO
 THE UNDERLYING ROOF STRUCTURE OR ROOF SUPPORT
 STRUCTURE.
  
 9B) 2010 FBC-B 419.4.2.5 EXTERIOR UNIT STANDARDS.
 419.4.2.5.1
 ALL EXTERIOR WINDOW UNITS, SKYLIGHTS, EXTERIOR LOUVERS
 AND EXTERIOR DOOR UNITS INCLUDING VISION PANELS AND
 THEIR ANCHORING SYSTEMS SHALL BE IMPACT RESISTANT OR
 PROTECTED WITH AN IMPACT RESISTANT COVERING MEETING THE
 REQUIREMENTS OF THE TESTING APPLICATION STANDARDS (TAS)
 201, 202, AND 203 OF THIS CODE IN ACCORDANCE WITH THE
 REQUIREMENTS OF SECTIONS 1626.2 THROUGH 1626.4 OF THIS
 CODE. THE IMPACT RESISTANT COVERINGS MAY BE EITHER
 PERMANENTLY ATTACHED OR MAY BE REMOVABLE IF STORED ON
 SITE OF THE FACILITY.
  
 10) 2010 FBC 107.3.4.1 PRODUCT APPROVALS. THOSE
 PRODUCTS WHICH ARE REGULATED BY THE DCA RULE 9N-03
 SHALL BE REVIEWED AND APPROVED IN WRITING BY THE
 DESIGNER OF RECORD PRIOR TO SUBMITTAL FOR
 JURISDICTIONAL APPROVAL.
 FL 61G1-23.015 (2) THE ARCHITECT IS RESPONSIBLE FOR
 SUPERVISING AND REVIEWING ALL PROJECT DATA, REPORTS,
 SHOP DRAWINGS ETC..
  
 11) ONCE THE WIND DESIGN & PRESSURES ARE CODE COMPLIANT
 IF EITHER THE DESIGNER OF RECORD OR CONTRACTOR WOULD
 PREFER TO SUBMIT THE PRODUCT APPROVALS AFTER THE
 ISSUANCE OF THE PERMIT THROUGH:
 107.3.4.2 DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS
 SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE
 PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE
 TIME OF THE APPLICATION AND THAT ARE TO BE SUBMITTED TO
 THE BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD.
 DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR
 APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED
 DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST
 THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS
 FOR REVIEW BY THE BUILDING OFFICIAL. DOCUMENTS FOR
 DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE
 REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE
 WHO SHALL REVIEW THEM AND FORWARD THEM TO THE BUILDING
 OFFICIAL WITH A NOTATION INDICATING THAT THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE
 IN GENERAL CONFORMANCE TO THE DESIGN OF THE BUILDING.
 THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED
 UNTIL THE DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN
 APPROVED BY THE BUILDING OFFICIAL.
  
 12) SHEET A1.1 THE MAIN LOBBY-192 SHOWS AN EXIT
 DIRECTIONAL SIGN FOR EXITING THROUGH THE ELEVATOR LOBBY
 193. THE SOUTH END OF THE ELEVATOR LOBBY DOES NOT SHOW
 AN ENCLOSURE AS DOES THE ELEVATOR LOBBY JUST TO THE
 EAST ELEVATOR LOBBY 195 SHEET A5.3 THIS AREA SEEMS TO
 BE ATRIUM OVERLOOK AREA. THE 2010 FBC-B 708.14.1
 EXCEPTION 4 DOES NOT APPLY TO GROUP I-2 OCCUPANCIES.
 ALSO SEE FLORIDA BUILDING CODE INFORMAL INTERPRETATION:
 DATE: WED SEP 7 2005
 REPORT #: 3887
 CODE: BUILDING
 SECTION: 707.14.1
 QUESTION:
 CAN THE PATH OF EXIT TRAVEL GO FROM AN EXIT ACCESS
 CORRIDOR THROUGH AN ELEVATOR LOBBY TO THE EXIT STAIRS?
 ANSWER:
 NO, THE SECTION SPECIFICALLY REQUIRES A LOBBY OF FIRE
 RATED CONSTRUCTION TO SEPARATE THE ELEVATOR FROM THE
 CORRIDOR BY FIRE RATED PARTITIONS AND PROTECTED
 OPENING(S).
 COMMENTARY:
 NONE.
 NOTICE:
 THE BUILDING OFFICIALS ASSOCIATION OF FLORIDA, IN
 COOPERATION WITH THE FLORIDA BUILDING COMMISSION, THE
 FLORIDA DEPARTMENT OF COMMUNITY AFFAIRS, ICC, AND
 INDUSTRY AND PROFESSIONAL EXPERTS OFFER THIS
 INTERPRETATION OF THE FLORIDA BUILDING CODE IN THE
 INTEREST OF CONSISTENCY IN THEIR APPLICATION STATEWIDE.
 THIS INTERPRETATION IS INFORMAL, NON-BINDING AND
 SUBJECT TO ACCEPTANCE AND APPROVAL BY THE LOCAL
 BUILDING OFFICIAL.
  
 13) SHEET A1.1 NOTE THIS IS THE LIFE SAFETY PLAN, THERE
 IS NO DIMENSIONAL PLAN IN THE 1ST OR 2ND FLOORS. ON
 SHEET A1.1 THE SOILED LAUNDRY ROOM NOT DIMENSIONED MAY
 HAVE A ACCESSIBILITY ISSUE WITH DOORS IN SERIES, 2010
 FLORIDA ACCESSIBILITY CODE 404.2.6.
  
 13A) THE PLANS INDICATE THAT THE ADDITION IS BEING
 BUILT AS UNDER THE HIGH-RISE PROVISIONS OF THE CODE FOR
 THE ADDITIONAL STORIES TO BE ADDED ON IN THE FUTURE.
 DOES THE BUILDING CURRENTLY CONTAIN A FIRE COMMAND
 CENTER (FBC-B 403.4.5) IN COMPLIANCE WITH FBC-B SECTION
 911? ] 911.1.1 LOCATION AND ACCESS. THE LOCATION AND
 ACCESSIBILITY OF THE FIRE COMMAND CENTER SHALL BE
 APPROVED BY THE FIRE CHIEF.
  
 13B) IS THIS ADDITION ONLY TO MEET THE HIGH-RISE
 REQUIREMENTS (FBC-B SECTION 403) OR WILL THE WHOLE
 FACILITY MEET THE HIGH RISE REQUIREMENTS SINCE THE
 PLANS DO NOT SHOW A 4 HOUR FIRE WALL SECTION 706?
  
 13C) DOES THIS FACILITY OR ADDITION HAVE A HYPERBARIC
 FACILITIES (FBC-B 407.9) HYPERBARIC FACILITIES IN GROUP
 I-2 OCCUPANCIES SHALL MEET THE REQUIREMENTS CONTAINED
 IN CHAPTER 20 OF NFPA 99.
  
 13D) PLEASE SHOW COMPLIANCE WITH FBC-B 419.4.2.11
 EXTERNAL EMERGENCY COMMUNICATIONS STANDARDS.
 (REFERENCE CHAPTER 59A-3.081 FLORIDA ADMINISTRATIVE
 CODE FOR REQUIREMENTS.)
  
 13E) PLEASE PROVIDE WHICH OPTION THE SITE HAS CHOSEN AS
 AN OPTION, SHOW COMPLIANCE WITH;
 FBC-B 419.4.2.10.1 IF THE FACILITY REQUIRES FIRE
 SPRINKLERS AS PART OF ITS FIRE PROTECTION, EITHER OF
 THE FOLLOWING SHALL BE MET: AND WHO WILL PERFORM THE
 FIRE WATCH IF THIS METHOD IS CHOSEN.
  
 14) SHEET A1.1 VS. A1.2, SHEET A1.2 THE 2ND LEVEL SHOWS
 A TEMPORARY STAIR TOWER AND TEMPORARY BUCK-HOIST
 LOCATION NOT SHOWN ON THE 1ST FLOOR PLANS. PLEASE
 PROVIDE HOW WILL THE OCCUPANTS BE PROTECTED DURING
 CONSTRUCTION AND IN COMPLIANCE WITH FBC-B 3306.7
 COVERED WALKWAYS. THE TEMPORARY STAIRS DOES NOT ADDRESS
 THIS ISSUE OF THE EXITING OF THE 1ST FLOOR
  
 15) SHEET A1.1 VS. A1.2, SHEET A1.2 THE 2ND FLOOR LEVEL
 ALSO SHOWS THE 2ND FLOOR TO BE A ATRIUM, THE PLANS ARE
 NOT CLEAR AS TO ON THE 2ND LEVEL IF THIS IS A HANDRAIL
 OR A 1 HOUR GLASS WALL WITH FIRE SPRINKLERS, THIS IS AN
 EXIT ACCESS CORRIDOR THAT WOULD NEED TO BE PROTECTED.
 FBC-B 404.6.
  
 16) SHEET A1.2 ALSO INDICATES THAT THIS EXIT WILL BE
 TEMPORARILY CLOSED AND THE EXIT SIGN REMOVED. PLEASE
 PROVIDE A CODE COMPLIANT EXIT PLAN DURING THE TIME THE
 EXIT WILL NOT BE AVAILABLE. IN ESSENCE IT CREATES A
 DEAD END FOR BOTH THE NORTH AND SOUTH CORRIDORS. FBC-B
 1018.4.
  
 17) LIFE SAFETY SHEET A1.3 & SHEET A5.3A SHOW 1 HOUR
 FIRE RATED WALLS:
  
 17A) STAFF CORRIDOR 317 SHOWS (2) A TYPE DOORS WITH
 CARD ENTRY. DOOR FROM CORRIDOR TO PREP & PACKING AREA
 ON THE DOOR SCHEDULE IS MISSING 45 MIN. RATING PER
 FBC-B TABLE 715.4.
  
 17B) DOOR FROM STAFF CORRIDOR TO CART WASH AREA
 (LABELED A) IS NOT ON THE DOOR SCHEDULE. 107.2.1.3
 ADDITIONAL INFORMATION/ FBC-B TABLE 715.4.
  
  
 17C) SHEET A5.3A THE DOORS TO ROOMS 323, 324,& 340 ARE
 NOT LABELED NOR SHOW UP ON THE DOOR SCHEDULE? 107.2.1.3
 ADDITIONAL INFORMATION IS REQUIRED. FBC-B TABLE 715.4.
  
 17D) THE DUMBWAITER LOCATED WITHIN CORRIDOR 304A SHOWS
 A (2 HOUR SHAFT) BUT THE DOOR SCHEDULE DOES NOT
 INDICATE A DOOR WITH 1 ? HOUR OPENING PROTECTIVE. 2010
 FBC-B TABLE 715.4.
  
 17E) WITHIN ROOM 305 HOLD/ STORAGE ROOM SHOWS A
 DUMBWAITER WITH A 2 HOUR FIRE RATING, THE DOOR SCHEDULE
 DOES NOT PROVIDE OPENING PROTECTIVE IN ACCORDANCE WITH
 2010 FBC-B TABLE 715.4.
  
 17F) ROOM 306 BREAKDOWN ROOM THERE ARE NO DIMENSIONS ON
 THIS PLAN, MAY OR MAY NOT COMPLY WITH 2010 FLORIDA
 ACCESSIBILITY CODE 404.2.6.
  
 17G) NOTE DOES THE OVERLOOK 330 & 569 HAVE 1 HOUR
 PROTECTION IS THIS CONSIDERED PART OF AN ATRIUM? THERE
 IS NO 2ND FLOOR PLANS IN THE 500 SERIES DRAWINGS IS
 THIS A ATRIUM A 3 STORY ATRIUM REQUIRING SMOKE CONTROL
 A NOTE ON THE PLANS INDICATES A PRIVATE BRIDGE BELOW?
 FBC-B 404.5. SHEET A5.5A THE 5TH LEVEL, SECTION 404.6
 EXCEPTION # 3 ONLY ALLOWS FOR THE ADJACENT SPACES OF
 ANY THREE FLOORS OF THE ATRIUM SHALL NOT BE REQUIRED TO
 BE SEPARATED FROM THE ATRIUM WHERE SUCH SPACES ARE
 ACCOUNTED FOR IN THE DESIGN OF THE SMOKE CONTROL
 SYSTEM. NOTE THIS IS THE 5TH LEVEL OF THE BUILDING.
  
 18) SHEET A5.4A: THIS SHEET SHOWS A 2 FT. DIFFERENCE IN
 ELEVATION AT THE NEW 2 HR. SHAFT. THE DETAIL INDICATED
 ON SECTION 3 OF A11.3 DOES NOT SHOW WHERE THE 2 FT.
 ELEVATION CHANGES WITHIN THE DETAIL CONFIGURATION. IT
 SHOWS THE BLOCK SHAFT THAT WAS REMOVED. AS BUILT IT
 APPEARS THAT THERE WILL BE A 2 ? INCH PIECE OF SHAFT
 LINER PANEL, THIS WOULD BE DIFFICULT FOR THE INSTALLER
 TO CUT MAINTAIN THE INTEGRITY OF THE LINER PANEL. IS
 THERE A MINIMUM WIDTH THE MANUFACTURER RECOMMENDS FOR
 ONE INCH SHAFT WALL?
  
 18A) THE DRINKING FOUNTAINS IN FRONT OF RESTROOMS 417 &
 418 (COMMON STATEMENT FOR THE 4TH & 5TH FLOOR WHERE
 DRINKING FOUNTAINS ARE IN THIS CONFIGURATION) ARE NOT
 PROTECTED BY WING WALLS, SHEET A16.1 THE LOW DRINKING
 FOUNTAIN MEETS THE REQUIREMENTS OF THE FL. ACCESS. CODE
 307.2 PROTRUDING OBJECTS BUT THE HIGH DRINKING FOUNTAIN
 WILL END UP WITH THE BOTTOM OF THE UNIT ABOVE 27
 INCHES, EITHER A WING WALL OR SKIRT WOULD BE REQUIRED
 FOR CODE COMPLIANCE WITH 307.2 OR BY ANY METHOD THAT
 MEETS CODE COMPLIANCE. 2010 FBC-B FIRE-RESISTANT JOINT
 SYSTEMS SECTION 714,1 EXCEP. 2 . FLOORS WHERE THE JOINT
 IS PROTECTED BY A SHAFT ENCLOSURE IN ACCORDANCE WITH
 SECTION 708.
  
 18B) THE (2) NEW DUMBWAITERS ON THIS FLOOR SHOW A 2
 HOUR FIRE RATED WALL, DOES THE DUMBWAITER STOP ON THIS
 FLOOR, THERE APPEARS TO BE NO DOORWAY? 107.2.1.3
 ADDITIONAL INFORMATION & FBC-B 715.4 OPENING
 PROTECTIVE.
  
 18C) NOTE IN BOTH AREAS OF MECHANICAL ROOM 403 & 404
 THERE ARE CHASES IN THE FLOOR UNPROTECTED THE PLANS
 INDICATE THEY ARE TO BE FOR HVAC, PLEASE IDENTIFY THE
 TYPE OF FIRE RATED ASSEMBLIES TO PROTECT THE FLOOR OR
 HORIZONTAL FIRE BARRIER. FBC-B 713.4 HORIZONTAL
 ASSEMBLIES.
  
 19) SHEET A5.5A :
  
 19A) ALUMINUM SUN SHADE DEVICES WILL NEED TO SHOW
 ENGINEERING (DESIGN AND ANCHORING) FOR THE APPROPRIATE
 WIND SPEED WITH EXPOSURE D WITH HEIGHT MULTIPLIERS.
 ASCE 7-10.
  
 19B) DUMBWAITERS BOTH THE SOILED DUMBWAITER FOUND IN
 ROOM 526 AND THE O. R. DUMBWAITER DO NOT SHOW THE 90
 MINUTE OPENING PROTECTIVE AS REQUIRED BY FBC-B TABLE
 715.4 OPENING PROTECTIVE.
  
 19C) PLEASE PROVIDE THE MANUFACTURERS SPECIFICATION
 SHEETS FOR THE DUMBWAITERS IN ACCORDANCE WITH 3001.5.1
 FLORIDA ELEVATOR SAFETY CODE AND 3001.2 REFERENCED
 STANDARDS.
  
 19D) PLEASE SHOW COMPLIANCE WITH FBC-B 3004.3 AREA OF
 VENTS.
  
 20) SHEET A5.6A DIMENSION PLAN. APPEARS NOT TO BE
 COMPLETE, SOME OF THE WALLS ARE DIMENSIONED, MANY ARE
 NOT, THERE IS NO WALL IDENTIFICATION AS TO TYPE OF WALL
 RATINGS AND THE SAME WITH THE DOORS. SHEET A1.6 THE
 LIFE SAFETY SHEET SHOWS FUTURE ROOMS ON THE WEST END
 ONLY. 107.2.1.3 ADDITIONAL INFORMATION IS REQUIRED.
  
 21) ON SHEETS A11.3 & A11.4 THE DETAIL BUBBLES ARE NOT
 FILED IN, DETAIL AND SHEET. 107.2.1.3 ADDITIONAL
 INFORMATION IS REQUIRED.
  
 22) SHEET A16.1 DETAIL FOR ACCESSIBLE DRINKING
 FOUNTAINS DEPENDING ON THE ACTUAL LOCATION THE UPPER
 DRINKING FOUNTAIN MAY OR MAY NOT NEED A SKIRT/ GUARD TO
 COMPLY WITH THE 2010 FLORIDA ACCESSIBILITY CODE SECTION
 307.2 PROTRUDING OBJECTS. IT APPEARS THE BOTTOM OF THE
 UPPER SHROUD UNIT WILL BE ABOVE THE REQUIRED 27 INCHES.
  
 23) SHEETS A13.1 AND A13.5 BOTH SHOW WALL DETAILS AND
 PENETRATIONS FOR RATED WALLS. THE PLANS DO NOT PROVIDE
 FIRE RESISTANCE RATED ASSEMBLIES FOR HORIZONTAL
 ASSEMBLIES AND COMPLIANCE WITH FBC-B 713.4.1.1 THROUGH
 PENETRATIONS.
  
 24) IMPACT FEES BEFORE A PERMIT TO CONSTRUCT, MAY BE
 ISSUED, IMPACT FEES MUST BE PAID TO PALM BEACH COUNTY.
 THE ACTUAL PERMIT SET OF PLANS MUST BE STAMPED BY THAT
 OFFICE, AND A COPY OF THE PAID RECEIPT ATTACHED TO THE
 PERMIT APPLICATION. PLEASE CALL (561)233-5025 FOR MORE
 INFORMATION.
  
 25) A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION
 MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGES CAN BE FOUND WILL HELP TO EXPEDITE YOUR
 PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION.
  
 A THOROUGH REVIEW CANNOT BE MADE AT THIS TIME, AS A
 RESULT OF THE ADDITIONAL INFORMATION REQUESTED
 ADDITIONAL COMMENTS MAY APPEAR THAT WERE NOT PART OF
 THIS REVIEW.
  
 JAMES A. WITMER CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 TEL: 561-805-6715
 FAX: 561-805-6676
 E-MAIL: [email protected]
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2016-02-11 Cont ID  
Sent By rlecky Date 2016-02-11 Time 14:54 Rev Time 0.00
Received By rlecky Date 2016-02-11 Time 13:29 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2015-12-28 Cont ID  
Sent By albarran Date 2015-12-28 Time 19:46 Rev Time 0.00
Received By albarran Date 2015-12-09 Time 13:37 Sent To  
Notes
2015-12-28 19:47:12THE PLANS FOR THE ABOVE MENTIONED PERMIT APPLICATION
 HAVE BEEN REVIEWED FOR COMPLIANCE WITH THE EDITION OF
 THE NEC, (NATIONAL ELECTRICAL CODE) AND THE FBC,
 (FLORIDA BUILDING CODE) AS WELL AS THE CITY OF WEST
 PALM BEACH AMENDMENTS IN EFFECT AT THE TIME OF
 SUBMITTAL. BELOW IS A LIST OF THE DEFICIENCIES NOTED.
 1. PG. AS3.1: PLEASE MAKE THE SITE PLAN LEGEND
 DIFFERENT TO MAKE IDENTIFICATION OF EXISTING VS. NEW
 WORK SIMPLER.
 2. PG. E0.0: 2010 FBC-E SECTION 502.3.8, RECESSED
 LUMINARIES INSTALLED IN THE BUILDING THERMAL ENVELOPE
 SHALL BE IC RATED & SEAL TO LIMIT AIR LEAKAGE BETWEEN
 CONDITIONED & UNCONDITIONED SPACES.
 3. PG. EL4.1B, EL4.3A, EL4.4A, EL4.5A, EP4.1B, EP4.3A,
 EP4.4A, EP4.5A, EL5.1B, EL5.3A, EL5.4A, EL5.5A, EL5.6A,
 EP4.1B, EP4.3A, EP4.4A, EP4.5A, EP5.1B, EP5.3A, EP5.4A,
 EP5.5A, EP5.6A, EP5.7A: PLEASE MAKE THE DEMOLITION
 LEGEND DIFFERENT TO MAKE IDENTIFICATION OF EXISTING TO
 REMAIN VS. EXISTING TO BE REMOVED. THIS PAGE CAN?T BE
 PROPERLY REVIEWED AS THE BOUNDARY BETWEEN EXISTING TO
 REMAIN VS. EXISTING TO BE REMOVED IS NOT CLEARLY
 DEFINED.
 4. PG. EL5.1B, EL5.3A, EL5.4A, EL5.5A, EL5.6A: IN
 ADDITION TO HAVING THE SAME ISSUES AS COMMENT THREE (3)
 ABOVE, I WAS UNABLE TO LOCATE WITHIN THE SET OF
 DRAWINGS A LIGHTING DIAGRAM INDICATING COMPLIANCE WITH
 THE MANDATORY SWITCHING AND CONTROL REQUIREMENTS OF THE
 ENERGY CONSERVATION CODE. A MORE DETAILED EXAMINATION
 WILL BE CONDUCTED ON THE ENLARGED AREA SHEETS.
 5. PG. EL5.1B, EL5.3A, EL5.4A, EL5.5A, EL5.6A: REFER TO
 LIFE SAFETY SHEET FOR EXIT LIGHT PLACEMENT.
 6. PG. EP5.1B, EP5.1B: ADDRESSES FIRST LEVEL OF AN AREA
 B THAT IS NOT PREVIOUSLY IDENTIFIED ON THE SITE PLAN OR
 KEYPLAN.
 7. PG. EP5.3A: IDENTIFY THE SD ENCLOSED INSIDE A
 DIAMOND.
 8. PG. EP5.7A: NEC 406.9(B) RECEPTACLES IN WET
 LOCATIONS. 15 AND 20 AMPERE, 125 AND 250 VOLT
 RECEPTACLES INSTALLED IN A WET LOCATION SHALL HAVE AN
 ENCLOSURE THAT IS WEATHERPROOF WHETHER OR NOT THE
 ATTACHMENT PLUG CAP IS INSERTED. ALL 15- AND 20-AMPERE,
 125- AND 250-VOLT NONLOCKING RECEPTACLES SHALL BE
 LISTED WEATHER-RESISTANT TYPE ?WR?.
 9. ALL EY SHEETS ADDRESS FIRE ALARM SYSTEMS, WHICH
 SHALL BE ON A SEPARATE SUBMITTAL AND THEREFORE HAVE NOT
 BEEN REVIEWED.
 10. PG. E6.1, E6.2, E6.3, E6.4: NEC 110.26(D)
 ILLUMINATION. ILLUMINATION SHALL BE PROVIDED FOR ALL
 WORKING SPACES ABOUT SERVICE EQUIPMENT, SWITCHBOARDS,
 AND PANELBOARDS. THIS ILLUMINATION SHALL BE ON THE
 EMERGENCY CIRCUIT. NOTE: FIRE AND BLDG. MAY HAVE AN
 ISSUE WITH THE SWING OF THE DOORS OF THE ELECTRICAL
 EQUIPMENT ROOMS.
  
 WHEN RESUBMITTING, FOR A QUICKER RETURN ON YOUR
 RE-SUBMITTAL, YOU ARE REQUIRED TO PROVIDE A RESPONSE
 LETTER (NARRATIVE) ADDRESSING EACH ITEM ALONG WITH THE
 STANDARD CITY RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE
 INSERT CORRECTED PAGES INTO THE SUBMITTAL AND LEAVE THE
 PREVIOUSLY REVIEWED SHEETS FOR COMPARISON.
 CLOUDING THE CHANGES WILL BE GREATLY APPRECIATED.
  
 IF YOU HAVE FURTHER QUESTIONS, PLEASE DON?T HESITATE TO
 CONTACT ME DIRECTLY.
  
 THANK YOU,
 MIKE ALBARRAN
 ELECTRICAL PLANS EXAMINER
 PH: 561-805-6746
 EMAIL: [email protected]
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2015-04-23 Cont ID  
Sent By albarran Date 2015-04-23 Time 11:12 Rev Time 0.00
Received By rlecky Date 2015-04-16 Time 11:53 Sent To  
Notes
2015-04-23 11:15:54THE FOLLOWING ITEMS ARE INCLUDED IN THE PROJECT
 SPECIFICATIONS AND AHCA APPROVALS.
 GROUND FAULT PROTECTION, LABELLING FOR FLASH
 PROTECTION, ISOLATION PANELS.
  
 RL
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status N Date 2015-04-15 Cont ID  
Sent By cranford Date 2015-04-15 Time 14:06 Rev Time 0.00
Received By cranford Date 2015-04-15 Time 13:56 Sent To  
Notes
2015-04-15 14:06:53VERTICAL CONSTRUCTION ONLY WITHIN EXISTING BUILDING
 FOOT PRINT.

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2015-12-09 Cont ID  
Sent By wjolin Date 2015-12-09 Time 12:40 Rev Time 0.00
Received By wjolin Date 2015-12-09 Time 12:40 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2015-05-13 Cont ID  
Sent By wjolin Date 2015-05-13 Time 13:16 Rev Time 0.00
Received By wjolin Date 2015-04-22 Time 11:11 Sent To  
Notes
2015-04-29 13:41:341309 NORTH FLAGLER DRIVE
 PERMIT #15020419
 REVIEW COMMENTS - FIRE DEPARTMENT
  
  
 WILL ANY CONSTRUCTION TRAILERS/MODULAR BUILDINGS BE
 USED ON-SITE FOR CONSTRUCTION? PER NFPA 241- STANDARD
 FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND
 DEMOLITION OPERATIONS, SECTION 4.2: TEMPORARY OFFICES,
 TRAILERS, AND OTHER FACILITIES OF COMBUSTIBLE
 CONSTRUCTION OR HOUSING COMBUSTIBLE CONTENTS SHALL BE
 SEPARATED FROM ADJACENT BUILDINGS, TRAILERS OR
 STRUCTURES IN ACCORDANCE WITH TABLE 4.2.1. PER TABLE
 4.2.1:
 1) 20 FEET EXPOSED LENGTH SHALL BE SEPARATED FROM
 ADJACENT STRUCTURES BY AT LEAST 30 FEET
 2) 30 FEET EXPOSED LENGTH SHALL BE SEPARATED FROM
 ADJACENT STRUCTURES BY AT LEAST 35 FEET
 3) 40 FEET EXPOSED LENGTH SHALL BE SEPARATED FROM
 ADJACENT STRUCTURES BY AT LEAST 40 FEET
 4) 50 FEET EXPOSED LENGTH SHALL BE SEPARATED FROM
 ADJACENT STRUCTURES BY AT LEAST 45 FEET
 5) 60 FEET EXPOSED LENGTH SHALL BE SEPARATED FROM
 ADJACENT STRUCTURES BY AT LEAST 50 FEET
 6) GREATER THAN 60 FEET EXPOSED LENGTH SHALL BE
 SEPARATED FROM ADJACENT STRUCTURES BY AT LEAST 60 FEET
 **A 75 PERCENT REDUCTION IN SEPARATION DISTANCES SHALL
 BE PERMITTED TO BE APPLIED, PROVIDED AUTOMATIC
 SPRINKLER PROTECTION IS USED IN THE EXPOSING STRUCTURE.
 PER NFPA 241 SECTION 4.2.2: DETACHMENT BETWEEN
 TEMPORARY STRUCTURES, ADEQUATE TEMPORARY FIXED FIRE
 PROTECTION SYSTEMS, AND PORTABLE EQUIPMENT SHALL BE
 PROVIDED AS REQUIRED BY THE AUTHORITY HAVING
 JURISDICTION.
  
 PROVIDE DRAWING NOTE INDICATING ALL CONSTRUCTION AND
 DEMOLITION WORK SHALL CONFORM TO THE REQUIREMENTS OF
 NFPA 241. TRASH AND CONSTRUCTION DEBRIS SHALL BE
 REMOVED FROM THE SITE DAILY. SMOKING SHALL BE
 PROHIBITED EXCEPT IN DESIGNATED EXTERIOR AREAS. ALL
 OTHER DEMOLITION OR CONSTRUCTION AREAS SHALL HAVE "NO
 SMOKING" SIGNS POSTED. WHERE SMOKING IS PERMITTED, SAFE
 RECEPTACLES FOR SMOKING MATERIALS SHALL BE PROVIDED.
  
 PROVIDE DRAWING NOTE INDICATING, ?FIRE PROTECTION
 SYSTEMS SHALL REMAIN ACTIVE DURING DEMOLITION AND
 RENOVATION ACTIVITIES. IN THE EVENT A FIRE PROTECTION
 SYSTEM IS OUT OF SERVICE FOR MORE THAN 4-HOURS IN A
 24-HOUR PERIOD, THE BUILDING SHALL BE PLACED UNDER A
 FIRE WATCH. ALL FIRE WATCH REQUESTS MUST BE SUBMITTED
 BY EMAIL ([email protected]) OR IN WRITING (FAX:
 561-804-4774) AND APPROVED BY THE OFFICE OF THE FIRE
 MARSHAL LOCATED AT 500 NORTH DIXIE HIGHWAY.?
  
 EACH FIRE BARRIER SHALL BE PERMANENTLY IDENTIFIED WITH
 SIGNS OR STENCILING READING FIRE BARRIER-PROTECT ALL
 OPENINGS. CHARACTERS SHALL BE AT LEAST 4-INCHES IN
 HEIGHT AND HALF-INCH IN WIDTH. IDENTIFICATION SHALL BE
 SPACED NOT MORE THAN 15 FEET ON CENTER.
  
 DISCLAIMER: REVIEW AND APPROVAL BY THE AHJ SHALL NOT
 RELIEVE THE OWNER, CONTRACTOR, ETC. OF THE
 RESPONSIBILITY OF COMPLIANCE WITH CODE (NFPA 1, SECTION
 1.14.4). FBC SECTION 105.4.1 PERMIT INTENT: A PERMIT
 ISSUED SHALL BE CONSTRUED TO BE A LICENSE TO PROCEED
 WITH THE WORK AND NOT AS AUTHORITY TO VIOLATE, CANCEL,
 ALTER OR SET ASIDE ANY OF THE PROVISIONS OF THE
 TECHNICAL CODES, NOR SHALL ISSUANCE OF A PERMIT PREVENT
 THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING A
 CORRECTION OF ERRORS IN PLANS, CONSTRUCTION OR
 VIOLATIONS OF THIS CODE.
  
 WESLEY JOLIN
 ASSISTANT FIRE MARSHAL
 WEST PALM BEACH FIRE RESCUE
 [email protected]
 (561) 805-6730
  

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2016-03-31 Cont ID  
Sent By ccole Date 2016-03-31 Time 14:38 Rev Time 0.00
Received By ccole Date 2016-03-21 Time 09:13 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2016-02-17 Cont ID  
Sent By ccole Date 2016-02-17 Time 16:56 Rev Time 0.00
Received By ccole Date 2016-02-09 Time 10:57 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2015-12-29 Cont ID  
Sent By cpuell Date 2015-12-29 Time 06:45 Rev Time 0.00
Received By cpuell Date 2015-11-17 Time 11:39 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2015-07-23 Cont ID  
Sent By lmarchan Date 2015-07-22 Time 08:43 Rev Time 0.00
Received By lmarchan Date 2015-06-05 Time 15:31 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-05-13 Cont ID  
Sent By lmarchan Date 2015-05-13 Time 13:59 Rev Time 0.00
Received By lmarchan Date 2015-03-18 Time 15:55 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-02-27 Cont ID  
Sent By cpuell Date 2015-02-27 Time 15:44 Rev Time 0.00
Received By cpuell Date 2015-02-27 Time 15:41 Sent To  
Notes
2015-02-27 15:44:58STILL WAITING ON FEES, UNABLE TO MOVE FORWARD
  

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 4 Status F Date 2016-02-16 Cont ID  
Sent By jwitmer Date 2016-02-16 Time 15:34 Rev Time 0.00
Received By jwitmer Date 2016-02-16 Time 15:34 Sent To  
Notes
2016-02-16 15:34:49IMPACT FEES
 BEFORE A PERMIT TO CONSTRUCT, MAY BE ISSUED, IMPACT
 FEES MUST BE PAID TO PALM BEACH COUNTY. THE ACTUAL
 PERMIT SET OF PLANS MUST BE STAMPED BY THAT OFFICE, AND
 A COPY OF THE PAID RECEIPT ATTACHED TO THE PERMIT
 APPLICATION. PLEASE CALL (561)233-5025 FOR MORE
 INFORMATION.
 JAMES A. WITMER CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 TEL: 561-805-6715
 FAX: 561-805-6676
 E-MAIL: [email protected]
  

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 3 Status F Date 2015-12-12 Cont ID  
Sent By jwitmer Date 2015-12-12 Time 13:45 Rev Time 0.00
Received By jwitmer Date 2015-12-12 Time 13:45 Sent To  
Notes
2015-12-12 13:46:18IMPACT FEES
 BEFORE A PERMIT TO CONSTRUCT, MAY BE ISSUED, IMPACT
 FEES MUST BE PAID TO PALM BEACH COUNTY. THE ACTUAL
 PERMIT SET OF PLANS MUST BE STAMPED BY THAT OFFICE, AND
 A COPY OF THE PAID RECEIPT ATTACHED TO THE PERMIT
 APPLICATION. PLEASE CALL (561)233-5025 FOR MORE
 INFORMATION.
 JAMES A. WITMER CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 TEL: 561-805-6715
 FAX: 561-805-6676
 E-MAIL: [email protected]
  

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status F Date 2015-06-28 Cont ID  
Sent By   Date 2015-06-28 Time   Rev Time 0.00
Received By jwitmer Date 2015-06-28 Time 09:28 Sent To  
Notes
2015-06-28 09:29:06IMPACT FEES
 BEFORE A PERMIT TO CONSTRUCT, MAY BE ISSUED, IMPACT
 FEES MUST BE PAID TO PALM BEACH COUNTY. THE ACTUAL
 PERMIT SET OF PLANS MUST BE STAMPED BY THAT OFFICE, AND
 A COPY OF THE PAID RECEIPT ATTACHED TO THE PERMIT
 APPLICATION. PLEASE CALL (561)233-5025 FOR MORE
 INFORMATION.
 JAMES A. WITMER CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 TEL: 561-805-6715
 FAX: 561-805-6676
 E-MAIL: [email protected]
  

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2015-04-29 Cont ID  
Sent By jwitmer Date 2015-04-29 Time 05:49 Rev Time 0.00
Received By jwitmer Date 2015-04-29 Time 05:49 Sent To  
Notes
2015-04-29 05:50:24 
 IMPACT FEES
 BEFORE A PERMIT TO CONSTRUCT, MAY BE ISSUED, IMPACT
 FEES MUST BE PAID TO PALM BEACH COUNTY. THE ACTUAL
 PERMIT SET OF PLANS MUST BE STAMPED BY THAT OFFICE, AND
 A COPY OF THE PAID RECEIPT ATTACHED TO THE PERMIT
 APPLICATION. PLEASE CALL (561)233-5025 FOR MORE
 INFORMATION.
 JAMES A. WITMER CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 TEL: 561-805-6715
 FAX: 561-805-6676
 E-MAIL: [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 6 Status P Date 2016-03-31 Cont ID  
Sent By ccole Date 2016-03-31 Time 14:38 Rev Time 0.00
Received By ccole Date 2016-03-31 Time 11:24 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 5 Status F Date 2016-02-17 Cont ID  
Sent By ccole Date 2016-02-17 Time 16:55 Rev Time 0.00
Received By ccole Date 2016-02-17 Time 16:55 Sent To  
Notes
2016-02-17 16:55:584TH REVIEW: FBC 2014 MECHANICAL
 PERMIT #15020419
 2/17/16
  
 1) REFER TO PAGE 3 OF THE ENERGY CALCULATION FORM
 506-2010: THE DESIGN PROFESSIONAL OF RECORD SHALL
 PROVIDE HIS/HER SIGNATURE ON THE DOCUMENT. A) PLEASE
 CLARIFY FROM WHAT STANDARD OR COMPLIANCE TABLE THE
 EFFICIENCY CRITERIA FOR THE AHU'S IS DERIVED FROM, AND
 HOW CAN THE DESIGN EFFICIENCY OF THE PROPOSED UNITS
 (1.10) BE LESS THAN THE REQUIRED EFFICIENCY CRITERIA
 (1.12) AND STILL PASS" B) PROVIDE COMPLIANCE DATA FOR
 THE FCU'S AND THE OAU-1.
 2) SHEET M5.3A: REFER TO SECTION 510.8 AND TABLE 510.8
 FBC-10 MECHANICAL AND INDICATE THE TYPE AND GAGE OF
 STEEL OF THE TWO HAZARDOUS EXHAUST DUCTS FOR THE
 NITROUS OXIDE AND NITROGEN STORAGE ROOMS.
 3) M7.01: IN RESPONSE TO COMMENT #4 FROM THE 1ST
 REVIEW, AND COMMENT #5 FROM THE 2ND REVIEW, THE
 ARCHITECT OF RECORD LESLIE D. BRUNELL HAS PROVIDED
 NOTES IN THE NARRATIVE RESPONSE TO CLARIFY THE
 MECHANICAL ROOM VENTILATION, AND REFRIGERATION
 DETECTION SYSTEM FUNCTIONS. PLEASE PLACE THESE NOTES
 AND THE VENTILATION CALCULATIONS ON SHEET M7.0.
 4) MP5.3A: INDICATE WHERE THE REFRIGERANT RELIEF VENT
 PIPING IS DISCHARGING TO.
 5) M0.4 & M5.3A: THE VENTILATION TABLE IS INDICATING
 275 CFM'S OF SUPPLY AIR FOR EACH DIFFUSER AT THE
 NITROUS OXIDE AND NITROGEN STORAGE ROOMS, HOWEVER THE
 PLAN INDICATES 325 CFM'S EACH.
 6) M8.3: PLEASE PROVIDE SPECIFICATIONS FOR THE CHILLED
 WATER AND STEAM PIPING ON THIS PLAN SHEET OR ONE OF THE
 OTHER MECHANICAL DETAIL PAGES.
 7) REFER TO COMMENT #20 FROM THE 3RD REVIEW: IN
 RESPONSE, THE ARCHITECT REFERENCES NOTE #4 ON SHEET
 M0.0. PLEASE REVISE THE NOTE TO INCLUDE ACCESS TO AC
 EQUIPMENT AND PROVIDE DIMENSIONED CONSTRUCTION DETAILS
 FOR THE ACCESS PANELS.
 8) M0.0, NOTE #29: PLEASE EXPAND THE NOTE TO INCLUDE
 DEFERRED SUBMITTALS FOR THE REFRIGERANT LEAK DETECTORS,
 THE DUCT SMOKE DETECTORS, THE ROOM PRESSURIZATION
 MONITORS AND CONTROL SENSORS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 4 Status F Date 2015-12-10 Cont ID  
Sent By ccole Date 2015-12-10 Time 16:53 Rev Time 0.00
Received By ccole Date 2015-12-09 Time 16:51 Sent To  
Notes
2015-12-10 17:06:293RD REVIEW 2014 MECHANICAL
 PERMIT #15020419
 12/10/15
  
 THE PREVIOUS (2ND) REVIEW COMMENTS WERE NOT ADDRESSED
 IN ENTIRETY, AND REVIEW OF THE REVISED PLANS AND
 SUBMITTALS HAS GENERATED SOME ADDITIONAL COMMENTS. THE
 FOLLOWING REVIEW WILL REFERENCE THE PREVIOUS (2ND)
 REVIEW COMMENTS AS THEY WERE RESPONDED TO IN THE
 NARRATIVE SUBMITTED BY THE ARCHITECT.
  
 1) COMMENT #2: THE SUBMTTED AC COOLING CALCULATIONS FOR
 THE 5TH FLOOR INDICATE A LOAD OF 1,383,300 BTU/H,
 HOWEVER THE SCHEDULE ON SHEET M0.2 INDICATES THE FIFTH
 FLOOR AIR HANDLERS AHU-5-1 AND 5-2 WILL ONLY PROVIDE
 967,500 BTU/H. PLEASE CLARIFY HOW THE COOLING DEMAND
 WILL BE MET.
 2) COMMENT #3A: TO BE CLEAR, I WAS NOT REQUESTING THAT
 THE EOR PROVIDE HIS SEAL AND SIGNATURE ON THE
 MANUFACTURER'S CUT SHEETS FOR THE COOLING TOWER.
 TYPICALLY THE EOR WILL REVIEW A PRODUCT SUBMITTAL AND
 AGREE TO IT'S USE BY PLACING A "REVIEW AND APPROVAL"
 SIGNATURE AND DATE ON THE DOCUMENT. SEE ALSO COMMENT #3
 BELOW.
 3) COMMENT #3B & 3C: IN REFERENCE TO THESE COMMENTS THE
 WPB AMENDMENTS TO THE FBC-10 BUILDING CODE HAS
 PROVISIONS FOR DEFERRED SUBMITTALS. DEFERRED SUBMITTAL:
 107.3.4.2. FOR THE PURPOSES OF THIS SECTION, DEFERRED
 SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF THE DESIGN
 THAT ARE NOT SUBMITTED AT THE TIME OF THE
 APPLICATION AND THAT ARE TO BE SUBMITTED TO THE
 BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. DEFERRAL
 OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF
 THE BUILDING OFFICIAL. THE REGISTERED DESIGN
 PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE
 DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS FOR
 REVIEW BY THE BUILDING OFFICIAL.
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL
 ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING
 OFFICIAL.
 4) COMMENT #4A: REFERENCE ITEMS #2 & 3 PRINTED ABOVE.
 5) COMMENTS #4B,C,D,E,&F: THE RESPONSE TO THESE
 COMMENTS INDICATE RE-USE OF THE EXISTING REFRIGERANT
 LEAK DETECTION AND VENTILATION SYSTEM, HOWEVER MINIMAL
 DETAILS ABOUT THE EXISITNG SYSTEM HAVE BEEN PROVIDED AS
 REQUESTED. PLEASE NOTE THAT THE PROPOSED PROJECT IS
 CLASSIFIED AS A ADDITION UNDER THE FBC-10 BUILDING
 CODES, AND THE EXSTING SYSTEM MUST BE REVIEWED TO
 VERIFY COMPLIANCE WITH THAT CODE. PLEASE PROVIDE
 COMPLETE RESPONSES AND REVISE THE PLANS ACCORDINGLY.
 6) COMMENT #4G: I WAS UNABLE TO LOCATE THE PURGE
 DISCHARGE PIPING ON SHEET M6.3. PLEASE PROVIDE A KEYED
 NOTE TO SHOW THE LOCATION.
 7) COMMENT #5: REFER TO SHEET M0.4. THE NITROUS OXIDE
 AND NITROGEN STORAGE ROOMS (32 A & 326B) EACH MUST HAVE
 8 ACH PER TABLE 7-1 ASHRAE 170-2008. PLEASE REVISE
 ACCORDINGLY.
 8) COMMENT #5: PLEASE REFER TO SECTION 2.1-8.2.2.1
 GUIDELINES FOR DESIGN AND CONSTRUCTION OF HEALTH CARE
 FACILITIES. IF THE ISOLATION ROOMS ON THE FITH FLOOR
 ARE TO BE USED FOR AIRBORN INFECTION ISOLATION (AII
 ROOMS), PROVIDE PERMANENTLY INSTALLED VISUAL MECHANISMS
 THAT WILL CONSTANTLY MONITOR THE PRESSURE STATUS OF THE
 OCCUPIED ROOMS.
 9) COMMENT #5: REFER TO SECTION 7.4 ASHRAE 170-2008:
 CLASS B & C OPERATING ROOMS SHALL BE PROVIDED WITH AT
 LEAST TWO SIDEWALL RETURN OR EXHAUST GRILLS SPACED AT
 OPPOSITE CORNERS OR AS FAR APART AS POSSIBLE, WITH THE
 BOTTOM OF THESE GRILLS INSTALLED APPROXIMATELY 8 IN.
 ABOVE THE FLOOR.
 10) COMMENT #6: REFER TO ITEMS #2 & 3 ABOVE FOR
 DEFERRED SUBMITTAL REQUIREMENTS, AND ALSO NOTE WE DO
 NOT REVIEW SPEC BOOK: DEFERRED SUBMITTAL. 2010 FBC
 107.3.4.1 PRODUCT APPROVALS. THOSE PRODUCTS WHICH ARE
 REGULATED BY THE DCA RULE 9N-03 SHALL BE REVIEWED AND
 APPROVED IN WRITING BY THE DESIGNER OF RECORD PRIOR TO
 SUBMITTAL FOR JURISDICTIONAL APPROVAL.
 11) COMMENT #7: REFER TO ITEMS #2 & #3 ABOVE FOR DUCT
 WORK IN THE OR ROOMS.
 12) COMMENT #8: PLEASE PROVIDE INSTALLATION DETAILS FOR
 THE FAN COIL UNITS, AND THE SAV, RAV, AND AT BOXES.
 PLEASE SEE SHEET M0.3 AND PROVIDE THE MAKE AND MODELS
 OF THE AT BOXES.
 13) COMMENT #9: AS PREVIOUSLY NOTED WE DO NOT REVIEW
 PROJECT SPEC BOOKS.
 14) COMMENT #10: PROVIDE THE PREVIOUSLY REQUESTED
 CONDENSATE DISPOSAL DETAILS INCLUDING THE PIPING RUNS
 AND DISCHARGE LOCATIONS. PLEASE NOTE THAT DETAIL 2 ON
 SHEET M8.1 SHOWS CONDENSATE DRAINING INTO A FLOOR
 DRAIN. PLEASE NOTE THAT SEC.90-126 WPB CODE OF
 ORDINANCES PROHIBITS CONDENSATE TO DRAIN INTO THE
 CITY'S SANITARY SYSTEM.
 15) COMMENT #11: CLARIFY IF THE NOA FOR THE ROOF FAN
 WILL BE SUBMITTED NOW OR AS A DEFERRED SUBMITTAL.
 16) COMMENT #12: SUBMIT SPECS FOR THE DUCT WRAP AND
 EXHAUST FANS REVIEWED BY THE THE EOR. THE SPECS MUST
 INDICATE THE COMPONENTS ARE APPROVED FOR USE IN
 HAZARDOUS EXHAUST SYSTEMS. REFER TO THE FOLLWING CODE
 SECTIONS AND SHOW COMPLIANCE: SECTION 502.8.1.1 ITEMS
 1-7, AND SECTIONS 510.6, 510.7 & 510.8 . IN ADDITION
 LEASE PROVIDE EXHAUST FAN SCHEDULES ON THE PLANS .
 17) COMMENT #18: PLEASE DARKEN OR EMBOLDEN THE OR ROOM
 NUMBERS ON SHEET M5.5A- THEY ARE NOT LEGIBLE, AND
 REVIEW THE AIR VALVE SCHEDULE ON SHEET M0.3: IT APPEARS
 THAT THE OR ROOMS UNDER "AREA SERVED" ARE LABELED
 DIFFERENTLY FOR THE RAV BOXES.
 18) COMMENT #20: REFER TO PREVIOUS NOTES ON DEFERRED
 SUBMITTALS.
 19) COMMENT #21: PLEASE PLACE A NOTE ON THE PLANS
 INDICATING TESTING AND BALANCING OF THE SYTEMS WILL BE
 PERFORMED IN ACCORDANCE WITH SECTION 503.9.1 FBC-10
 ENERGY CONSERVATION.
 18) SHEET M0.2: PLEASE INCLUDE AHU-4A IN THE EQUIPMENT
 SCHEDULE.
 19) SHEET M0.3: PLEASE INDICATE THE MAKES AND MODELS OF
 THE AIR TERMINAL BOXES.
 20) REFER TO SECTION 306.1 FBC-10 MECHANICAL AND INDATE
 HOW COMPLIANCE WILL BE MET FOR THE REQUIRED ACCESS AND
 SERVICE SPACE WILL BE PROVIDED FOR ALL OF THE AC
 EQUIPMENT AND APPLIANCES ABOVE THE CEILINGS: THE FAN
 COIL UNITS, SAV'S, RAV'S, AND AT'S. PROVIDE A TYPICAL
 ACESS PANEL DETAIL.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  
  

Review Stop M MECHANICAL (A/C)
Rev No 3 Status F Date 2015-12-10 Cont ID  
Sent By ccole Date 2015-12-10 Time 15:40 Rev Time 0.00
Received By ccole Date 2015-12-09 Time 12:28 Sent To  
Notes
2015-12-10 15:42:513RD REVIEW 2014 MECHANICAL
 PERMIT #15020419
 12/10/15
  
 THE PREVIOUS (2ND) REVIEW COMMENTS WERE NOT ADDRESSED
 IN ENTIRETY, AND REVIEW OF THE REVISED PLANS AND
 SUBMITTALS HAS GENERATED SOME ADDITIONAL COMMENTS. THE
 FOLLOWING REVIEW ITEMS 1- 17 WILL REFERENCE THE
 PREVIOUS (2ND) REVIEW COMMENTS AS THEY WERE RESPONDED
 TO IN THE NARRATIVE SUBMITTED BY THE ARCHITECT.
  
 1) COMMENT #2: THE SUBMTTED AC COOLING CALCULATIONS FOR
 THE 5TH FLOOR INDICATE A LOAD OF 1,383,300 BTU/H,
 HOWEVER THE SCHEDULE ON SHEET M0.2 INDICATES THE FIFTH
 FLOOR AIR HANDLERS AHU-5-1 AND 5-2 WILL ONLY PROVIDE
 967,500 BTU/H. PLEASE CLARIFY HOW THE COOLING DEMAND
 WILL BE MET.
 2) COMMENT #3A: TO BE CLEAR, I WAS NOT REQUESTING THAT
 THE EOR PROVIDE HIS SEAL AND SIGNATURE ON THE
 MANUFACTURER'S CUT SHEETS FOR THE COOLING TOWER.
 TYPICALLY THE EOR WILL REVIEW A PRODUCT SUBMITTAL AND
 AGREE TO IT'S USE BY PLACING A "REVIEW AND APPROVAL"
 SIGNATURE AND DATE ON THE DOCUMENT. SEE ALSO ITEM #3
 DIRECTLY BELOW.
 3) COMMENT #3B & 3C: IN REFERENCE TO THESE COMMENTS THE
 WPB AMENDMENTS TO THE FBC-10 BUILDING CODE HAS
 PROVISIONS FOR DEFERRED SUBMITTALS. DEFERRED SUBMITTAL:
 107.3.4.2. FOR THE PURPOSES OF THIS SECTION, DEFERRED
 SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF THE DESIGN
 THAT ARE NOT SUBMITTED AT THE TIME OF THE
 APPLICATION AND THAT ARE TO BE SUBMITTED TO THE
 BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. DEFERRAL
 OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF
 THE BUILDING OFFICIAL. THE REGISTERED DESIGN
 PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE
 DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS FOR
 REVIEW BY THE BUILDING OFFICIAL.
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL
 ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING
 OFFICIAL.
 4) COMMENT #4A: REFERENCE ITEMS #2 & 3 PRINTED ABOVE.
 5) COMMENTS #4B,C,D,E,&F: THE RESPONSE TO THESE
 COMMENTS INDICATE RE-USE OF THE EXISTING REFRIGERANT
 LEAK DETECTION AND VENTILATION SYSTEM, HOWEVER MINIMAL
 DETAILS ABOUT THE EXISITNG SYSTEM HAVE BEEN PROVIDED AS
 REQUESTED. PLEASE NOTE THAT THE PROPOSED PROJECT IS
 CLASSIFIED AS A ADDITION UNDER THE FBC-10 BUILDING
 CODES, AND THE EXSTING SYSTEM MUST BE REVIEWED TO
 VERIFY COMPLIANCE WITH THAT CODE. PLEASE PROVIDE
 COMPLETE RESPONSES AND REVISE THE PLANS ACCORDINGLY.
 6) COMMENT #4G: I WAS UNABLE TO LOCATE THE PURGE
 DISCHARGE PIPING ON SHEET M6.3. PLEASE PROVIDE A KEYED
 NOTE TO SHOW THE LOCATION.
 7) COMMENT #5: REFER TO SHEET M0.4. THE NITROUS OXIDE
 AND NITROGEN STORAGE ROOMS (32 A & 326B) EACH MUST HAVE
 8 ACH PER TABLE 7-1 ASHRAE 170-2008. PLEASE REVISE
 ACCORDINGLY.
 8) COMMENT #5: PLEASE REFER TO SECTION 2.1-8.2.2.1
 GUIDELINES FOR DESIGN AND CONSTRUCTION OF HEALTH CARE
 FACILITIES. IF THE ISOLATION ROOMS ON THE FITH FLOOR
 ARE TO BE USED FOR AIRBORN INFECTION (AII ROOMS),
 PROVIDE PERMANENTLY INSTALLED VISUAL MECHANISMS THAT
 WILL CONSTANTLY MONITOR THE PRESSURE STATUS OF THE
 OCCUPIED ROOMS.
 9) COMMENT #5: REFER TO SECTION 7.4 ASHRAE 170-2008:
 CLASS B & C OPERATING ROOMS SHALL BE PROVIDED WITH AT
 LEAST TWO SIDEWALL RETURN OR EXHAUST GRILLS SPACED AT
 OPPOSITE CORNERS OR AS FAR APART AS POSSIBLE, WITH THE
 BOTTOM OF THESE GRILLS INSTALLED APPROXIMATELY 8 IN.
 ABOVE THE FLOOR.
 10) COMMENT #6: REFER TO ITEMS #2 & 3 ABOVE FOR
 DEFERRED SUBMITTAL REQUIREMENTS, AND ALSO NOTE WE DO
 NOT REVIEW SPEC BOOK: DEFERRED SUBMITTAL. 2010 FBC
 107.3.4.1 PRODUCT APPROVALS. THOSE PRODUCTS WHICH ARE
 REGULATED BY THE DCA RULE 9N-03 SHALL BE REVIEWED AND
 APPROVED IN WRITING BY THE DESIGNER OF RECORD PRIOR TO
 SUBMITTAL FOR JURISDICTIONAL APPROVAL.
 11) COMMENT #7: REFER TO ITEMS #2 & #3 ABOVE FOR DUCT
 WORK IN THE OR ROOMS.
 12) COMMENT #8: PLEASE PROVIDE INSTALLATION DETAILS FOR
 THE FAN COIL UNITS, AND THE SAV, RAV, AND AT BOXES.
 PLEASE SEE SHEET M0.3 AND PROVIDE THE MAKE AND MODELS
 OF THE AT BOXES.
 13) COMMENT #9: AS PREVIOUSLY NOTED WE DO NOT REVIEW
 PROJECT SPEC BOOKS.
 14) COMMENT #10: PROVIDE THE PREVIOUSLY REQUESTED
 CONDENSATE DISPOSAL DETAILS INCLUDING THE PIPING RUNS
 AND DISCHARGE LOCATIONS. PLEASE NOTE THAT DETAIL 2 ON
 SHEET M8.1 SHOWS CONDENSATE DRAINING INTO A FLOOR
 DRAIN. PLEASE NOTE THAT SEC.90-126 WPB CODE OF
 ORDINANCES PROHIBITS CONDENSATE TO DRAIN INTO THE
 CITY'S SANITARY SYSTEM.
 15) COMMENT #11: CLARIFY IF THE NOA FOR THE ROOF FAN
 WILL BE SUBMITTED NOW, OR AS A DEFERRED SUBMITTAL.
 16) COMMENT #12: SUBMIT SPECS FOR THE DUCT WRAP AND
 EXHAUST FANS REVIEWED BY THE THE EOR. THE SPECS MUST
 INDICATE THE COMPONENTS ARE APPROVED FOR USE IN
 HAZARDOUS EXHAUST SYSTEMS. REFER TO THE FOLLOWING CODE
 SECTIONS AND SHOW COMPLIANCE: SECTION 502.8.1.1 ITEMS
 1-7, AND SECTIONS 510.6, 510.7 & 510.8 . IN ADDITION
 PLEASE PROVIDE EXHAUST FAN SCHEDULES ON THE PLANS .
 17) COMMENT #18: PLEASE DARKEN OR EMBOLDENT THE OR ROOM
 NUMBERS ON SHEET M5.5A- THEY ARE NOT LEGIBLE, AND
 REVIEW THE AIR VALVE SCHEDULE ON SHEET M0.3: IT APPEARS
 THAT THE OR ROOMS UNDER "AREA SERVED" ARE LABELED
 DIFFERENTLY FOR THE RAV BOXES.
 18) SHEET M0.2: PLEASE INCLUDE AHU-4A IN THE EQUIPMENT
 SCHEDULE.
 19) SHEET M0.3: PLEASE INDICATE THE MAKES AND MODELS OF
 THE AIR TERMINAL BOXES.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  
  

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2015-07-22 Cont ID  
Sent By ccole Date 2015-07-22 Time 10:27 Rev Time 0.00
Received By ccole Date 2015-07-21 Time 06:39 Sent To  
Notes
2015-07-22 11:17:142ND REVIEW: FBC 2010 MECHANICAL
 PERMIT #15020419
  
 THE 1ST REVIEW COMMENTS HAVE BEEN ADDRESSED HOWEVER THE
 PLANS HAVE BEEN REVIEWED A SECOND TIME TO CHECK FOR
 REQUESTED CORRECTIONS AND ADDITIONAL CODE COMPLIANCES.
 PLEASE REVISE THE PLANS IN ACCORDANCE WITH THE
 FOLLOWING LIST OF COMMENTS.
  
 1) THE SUBMITTED FLORIDA ENERGY EFFICIENCY COMPLIANCE
 FORM 506-2010 DOES NOT PROVIDE ANY COMPLIANCE DATA FOR
 THE CHILLERS, THE COOLING TOWER, AND AHU-4 & AHU-4-1.
 SEE TABLES 503.2.3 (4) 503.2.3(7) & 503.2.3(8) FBC-10
 ENERGY CONSERVATION. PLEASE REVISE ACCORDINGLY.
 2) COOLING AND HEATING EQUIPMENT SIZING CALCULATIONS
 HAVE NOT BEEN SUBMITTED- REFERENCE SECTION 503.2.1
 FBC-10 ENERGY AND PROVIDE THE CALCULATIONS IN
 ACCORDANCE WITH ASHRAE/ACCA STANDARD 183 OR ACCA MANUAL
 N.
 3) COOLING TOWER: A) SUBMIT MARLEY PRODUCT DATA AND
 DIAGRAM CUT SHEETS WITH THE ENGINEER OF RECORD'S
 APPROVAL STAMP AND SIGNATURE ON THE DOCUMENTS. B)
 PROVIDE ENGINEERED STRUCTURAL DETAILS AND WIND LOAD
 DESIGN CRITERIA FOR ATTACHMENT OF THE COOLING TOWER AND
 TOWER BASE TO THE ROOF STRUCTURE- SECTION301.12 FBC-10
 MECHANICAL. C) PROVIDE STRUCTURAL DETAILS FOR
 INSTALLATION OF THE TOWER LADDER AND GUARDRAILS. D)
 SHOW THE PHYSICAL LOCATIONS OF THE COOLING TOWER
 CHEMICAL FEED PUMPS AND CHEMICAL STORAGE DRUMS AS SHOWN
 IN THE DETAIL ON SHEET M8.1. PROVIDE ALL REQUIRED
 DETAILS FOR SECURE MOUNTING OF THE PUMP EQUIPMENT AND
 THE 55 GALLON DRUMS.
 4) CHILLERS AND ASHRAE 15 COMPLIANCE: A) SUBMIT TRANE
 MANUFACTURER'S SPECIFICATIONS SHEETS WITH THE ENGINEER
 OF RECORD'S APPROVAL STAMP AND SIGNATURE ON THE
 DOCUMENTS. B) INDICATE THE TYPE AND QUANTITY OF
 REFRIGERANT LBS. IN THE EQUIPMENT SCHEDULES FOR THE
 CHILLERS ON SHEET M0.1- SEE TABLE 1103.1 FBC-10
 MECHANICAL. C) REFER TO ASHRAE 15 AND SECTION 1105 FOR
 MECHANICAL RM 303: SHOW THE LOCATION OF THE REFRIGERANT
 LEAK DETECTOR, PROVIDE AN EQUIPMENT SCHEDULE FOR THE
 DEVICE, AND SUBMIT MANUFACTURER'S SPECIFICATIONS
 REVIEWED AND APPROVED BY THE ENGINEER OF RECORD. D)
 PROVIDE VENTILATION CALCULATIONS FOR NORMAL VENTILATION
 OF THE MECHANICAL ROOM, AND CALCULATIONS FOR EMERGENCY
 CONDITIONS, AND INDICATE COMPLIANCE. E) PROVIDE DETAILS
 FOR MAKE-UP AND EXHAUST VENTILATION AIR INCLUDING
 LOCATIONS OF AIR INLET AND EXHAUST OUTLETS, FANS
 SCHEDULES, LOUVER, CLEARANCE DISTANCES SIZES ETC. F)
 PROVIDE A SEQUENCE OF OPERATION FOR THE LEAK DETECTION
 /VENTILATION SYSTEM THAT INCLUDES A DESCRIPTIVE
 NARRATIVE OF THE PROCESS AND A DIAGRAM. G) PROVIDE
 DETAILS FOR PURGE DISCHARGE PIPING INCLUDING THE PIPING
 RUN AND DISCHARGE LOCATION- REFER TO SECTION 1105.7. H)
 SEE SHEET M7.06: CLARIFY WHY THERE IS NO DATA
 PERFORMANCE DATA LISTED IN THE DIAGRAM FOR CH-2. PLEASE
 NOTE THAT SHEET M7.06 IS IDENTIFIED INCORRECTLY IN THE
 INDEX AS "EXHAUST FAN CONTROL DIAGRAMS".
 5) SHEET M0.4 & M0.5: INDICATE ON THE PLANS WHICH
 CURRENT CODE OR DESIGN STANDARD WAS USED TO CALCULATE
 THE REQUIRED VENTILATION AND AIR BALANCES FOR ROOMS AND
 SPACES INCLUDING PRESSURIZATION CALCULATIONS FOR THE
 OR?S AND ISOLATIONS ROOMS ETC.
 6) PROVIDE EQUIPMENT SCHEDULES FOR THE AIR INTAKE AND
 EXHAUST LOUVER LISTING MAKES AND MODELS, DIMENSIONS,
 AND FREE AIR SPACE FOR EACH. PROVIDE SIZING
 CALCULATIONS FOR THE O/A INTAKES, AND SUBMIT SPECS FOR
 ALL REQUIRED AIR FILTERS REVIEWED AND APPROVED BY THE
 ENGINEER OF RECORD.
 7) PROVIDE MANUFACTURER'S SPECIFICATIONS FOR THE FLEX
 DUCTS TO BE INSTALLED REVIEWED AND APPROVED BY THE
 ENGINEER OF RECORD- REFER TO SECTION 419.3.6.4 FBC-10
 BUILDING. INDICATE THE FLEX DUCT SIZES ON THE PLANS AND
 SHOW INSTALLATION DETAILS INCLUDING A DETAIL FOR
 CONNECTION TO THE OR ROOM DIFFUSERS.
 8) PROVIDE STRUCTURAL DETAILS FOR HANGING AND SUPPORT
 OF THE AIR HANDLERS AND FAN COIL UNITS.
 9) PROVIDE CHILLED WATER AND STEAM PIPE SPECIFICATIONS
 AND DETAILS FOR INSTALLATION AND SUPPORT.
 10) PROVIDE DETAILS FOR CONDENSATE DISPOSAL FROM THE
 AIR HANDLERS. INDICATE THE TYPES AND SIZES OF PIPING,
 THE PIPING RUNS, AND DISCHARGE LOCATIONS- SEE SECTION
 307 FBC-10 MECHANICAL. SHOW DETAILS FOR SECONDARY OR
 AUXILIARY DISPOSAL PER SECTION 307.2.3.
 11) PROVIDE WIND LOAD ENGINEERING FOR MOUNTING THE ROOF
 TOP EXHAUST FANS- SECTION 301.12. PLEASE NOTE THAT
 INLINE BOOSTER FANS FOR THE DRYERS ARE PROHIBITED BY
 THE WPB FIRE DEPT.
 12) SHEET M5.3.A, NITROUS OXIDE AND NITROGEN STORAGE
 ROOMS 326 A & B: REVISE THE PLANS WITH NOTES AND
 DETAILS TO SHOW COMPLIANCE WITH THE FOLLOWING SECTIONS
 OF NFPA 99. SECTION 9.3.6.5.3.1- CONTINUOUS
 VENTILATION, 9.3.6.5.2- RATE OF VENTILATION
 CALCULATION, 9.3.6.5.3.3- LOCATION OF EXHAUST VENT IN
 THE ROOM, AND 9.3.6.5.3.2- TYPE OF MAKE-UP AIR AND
 EXHAUST DUCTWORK, AND EXHAUST DUCT TERMINATION
 CLEARANCES. A) PLEASE NOTE THAT DAMPERS ARE REQUIRED
 FOR THE EXHAUST DUCTS PENETRATING THE FIRE RATED WALLS
 OF THE STORAGE ROOMS UNLESS THE EXHAUST SYSTEM IS
 DEFINED AS HAZARDOUS- REFER TO SECTION 510.6.1
 MECHANICAL. REVISE THE PLANS TO SHOW COMPLIANCE
 13) M5.3.A: VENTILATION IS REQUIRED FOR GENERATOR RM
 340. PLEASE PROVIDE CALCULATIONS AND DETAILS ON THE
 PLAN.
 14) M5.3.A: MISSING FIRE DAMPERS AT DUCTS PENETRATING
 THE EXHAUST SHAFT AT 321-B CORRIDOR.
 15) M5.3.A: NUMEROUS BRANCH DUCT SIZES ARE NOT SHOWN:
 PLEASE REVIEW AND REVISE.
 16) M5.4.A: MISSING FIRE DAMPER AT RETURN AIR DUCT
 PENETRATING THE FIRE RATED CORRIDOR WALL AT THE NE
 CORNER OF MECH. RM 404.
 17) M5.5.A: A) LABEL THE DAMPERS PENETRATING THE SHAFTS
 AT CORRIDOR 573. B) MANY DAMPERS MISSING FOR DUCTS
 PENETRATING RATED CORRIDOR 541 & 542 WALLS, AND THE
 SATELLITE PHARMACY WALLS.
 18) M5.5.A: THE OR ROOM NUMBERS DO NOT MATCH THE OR
 NUMBERS IN THE SCHEDULE ON SHEET M0.3.
 19) M5.5.A: THE SAV AND RAV NUMBERS ON THE PLAN DO NOT
 MATCH THE NUMBERS IN THE SCHEDULE- M0.3.
 20) REQUIRED SUBMITTALS, NOA'S AND FL. PRODUCT
 APPROVALS TO BE REVIEWED AND APPROVED BY THE ENGINEER
 OF RECORD: EXHAUST AND INTAKE LOUVERS, ROOF MOUNTED
 EXHAUST FANS, FLEX DUCTS, FIRE AND FIRE/SMOKE DAMPERS,
 DUCT SMOKE DETECTORS, REFRIGERANT LEAK DETECTORS, HEPA
 EQUIPMENT AND FILTERS.
 21) PLEASE REVIEW SECTION 503.2.9 FBC-10 ENERGY
 CONSERVATION FOR SYSTEM COMPLETION AND TESTING AND
 BALANCING- AND PROVIDE NOTES ON THE PLAN TO INDICATE
 HOW COMPLIANCE WILL BE MET.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2015-05-06 Cont ID  
Sent By hmoser Date 2015-05-06 Time 13:06 Rev Time 0.00
Received By hmoser Date 2015-04-28 Time 10:30 Sent To  
Notes
2015-05-06 13:06:49PLAN DENIED
 1) PROVIDE ENERGY CALCULATIONS WITH THE PLAN.PER
 SECTION 503.2.1 CALCULATION OF HEATING AND COOLING
 2010 FLORIDA ENERGY CODE.
 2) MISSING FIRE DAMPERS IN CORRIDOR 327 AND ELEVATOR
 LOBBY. MISSING MULTIPLE FIRE DAMPERS THROUGH OUT THE
 PLAN
 607.5.2 FIRE BARRIERS 2010 FBC (M)
 3) REFER TO SECTION 607.5.5 SHAFT ENCLOSURES 2010 FBC
 (M)
 4) THERE ARE TWO 10" PIPES OR DUCT FROM THE CHASE TO
 THE
 EMERG GENERATOR ROOM PLEASE EXPLAIN
 5) SHOW ALL RATED WALLS ON MECHANICAL PLANS. PER
 SECTION
 107 2010 FBC
 6) NOTE #1 PAGE M5.3A RELOCATING EXISTING DRYER DUCT
 CITY OF WEST PALM BEACH FIRE DEPARTMENT WILL NOT PERMIT
 BOOSTER FANS.
 7) REFER TO SECTION 304.11 GUARDS
 8) REFER TO SECTION 301.12 WIND RESISTANCE FOR
 EQUIPMENT
 ON THE ROOF. 2010 FBC (M)
  
 PLAN REVIEW BY HAROLD MOSER
 [email protected]
 OFFICE 561-805-6732
 FAX 561-805-6676
  

Review Stop P PLUMBING
Rev No 3 Status P Date 2015-11-19 Cont ID  
Sent By gjohnson Date 2015-11-19 Time 15:57 Rev Time 0.00
Received By gjohnson Date 2015-11-19 Time 15:57 Sent To  
Notes
2015-11-19 16:04:38.

Review Stop P PLUMBING
Rev No 2 Status F Date 2015-07-12 Cont ID  
Sent By tklarge Date 2015-07-12 Time 10:06 Rev Time 0.00
Received By tklarge Date 2015-07-12 Time 06:47 Sent To  
Notes
2015-07-12 09:12:281) SHT. A11.7 - DETAILS 20 & 21 SHOW EMERGENCY OVERFLOW
 SCUPPERS WITH THE BOTTOM OF THE SCUPPERS LEVEL WITH THE
 ROOF. SECTION 1503.4.2.1 REQUIRES THAT OVERFLOW
 SCUPPERS BE LOCATED IN WALLS OR PARAPETS NOT LESS THAN
 2 INCHES NOR MORE THAN 4 INCHES ABOVE THE FINISHED ROOF
 COVERING.
 2) SHT.A11.3 - DETAIL # 4 SHOWS WHAT APPEARS TO BE A
 SUMP IN THE NEW ELEVATOR SHAFTS.IF THE ELEVATORS ARE
 HYDRAULIC, THEN AN OIL SEPARATOR IS REQUIRED PER THE
 2010 FPC SEC.1003.4. SUBMIT DETAILS FOR THE SEPARATOR
 AND SHOW THE LOCATION ON THE PLANS. THE SEPARATOR SHALL
 COMPLY WIT 2010 FPC SECTIONS 1003.4.2 - 1003.4.2.2.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2015-04-28 Cont ID  
Sent By tklarge Date 2015-04-28 Time 13:41 Rev Time 0.00
Received By tklarge Date 2015-04-18 Time 08:53 Sent To  
Notes
2015-04-28 13:20:501) PROVIDE A SCUPPER DETAIL FOR THE EMERGENCY RAIN
 WATER SYSTEM. SCUPPERS SHALL BE LOCATED PER SEC.
 1503.4.2.1 OF 2010 FBC AND SHALL HAVE AN OPENING
 DIMENSION NOT LESS THAN 4 INCHES. 2010 FPC SEC.1107.3.
 2) SUBMIT DOCUMENTATION THAT 1/2 THE AREA OF ANY
 VERTICAL WALL THAT DIVERTS RAINWATER TO THE ROOF HAS
 BEEN ADDED TO THE PROJECTED ROOF AREA FOR THE SIZING OF
 THE ROOF DRAINS AND SCUPPERS. 2010 FPC SEC.1106.4.
 3) SHT. A16.1 - GENERAL NOTES #3 - STATES EVERY 3' X 3'
 SHOWER SHALL RECEIVE GRAB BAR 10 G. THERE IS NO SIZE
 LISTED FOR THIS GRAB BAR. CLARIFY.
 4) SHT. A16.1 - THE LOCATION OF THE TOILET PAPAER
 DISPENSERS IN THE ACCESSIBLE TOILET ROOMS SHALL COMPLY
 WITH 2010 FAC SEC.604.7.
 5) SHT. 16.1 - ACCESSIBLE SINK IN COUNTER - TOE
 CLEARANCE SHALL BE PROVIDED COMPLYING WITH 2010 FAC
 SEC.306.2.
 6) SHT. A16.1 - THE 30" X 60" ACCESSIBLE LISTS GRAB BAR
 10F. THIS GRAB BAR IS NOT LISTED IN GRAB BAR LIST # 10
 ALTHOUGH IT IS SHOWN IN THE ACCESSORY MOUNTING HEIGHTS.
 CLARIFY.
 7) SHT. A16.1 - 30" X 60" ACCESSIBLE SHOWER ELEVATION
 SHOWS THE CONTROLS 48 INCHES TO THE BOTTOM. THE
 CONTROLS SHALL BE MEASURED 48 INCHES MAX TO THE TOP OF
 THE CONTROLS. 2010 FAC SEC.608.5.2.
 8) SHT. A16.3. - APPEARS TO SHOW THE DOOR SWINGING INTO
 THE CLEAR FLOOR SPACE FOR THE LAVATORY.DOORS SHALL NOT
 SWING INTO THE CLEAR FLOOR SPACE FOR ANY FIXTURE. SEE
 EXCEPTION #2 IN FAC SEC.603.2.3.
 9) SHT. A17.1 & A 17.2 - STAFF LOUNGE # 318 ( DETAIL
 7S) & 518 (DETAIL 21W) - THE MAXIMUM HEIGHT OF THE SINK
 COUNTERS SHALL BE 34 INCHES PER 2010 FAC SEC.606.3.
 10) SHT.A17.4 - WAITING AREA 609A (DETAIL 46S ) THE
 SINK COUNTER SHALL BE A MINIMUM OF 34 INCHES HIGH. FAC
 SEC. 606.3.
 11) SHT. A17.5 - STAFF LOUNGE #636 - DETAIL 52S - SINK
 SHALL COMPLY WITH 2010 FAC SEC.606.3.
 12) SHT. A16.2 - THE BAR SINKS IN THE PATIENT ROOMS
 SHALL COMPLY W/ 2010 FAC SEC.212.3.
 13) SHT. A6.5A - OBJECTS WITH LEADING EDGES MORE THAN
 27 INCHES AND NOT MORE THAN 80 INCHES ABOVE THE FINISH
 FLOOR SHALL NOT PROJECT MORE THAN 4 INCHES HORIZONTALLY
 INTO THE CIRCULATION PATH. SEE THE DRINKING FOUNTAINS
 ON 5TH FLR.IN PASSAGEWAY #567 (CHECK LEADING EDGE OF
 THE HIGH LEVEL UNIT).
 14) SHT.A5.4A - SUBMIT DOCUMENTATION/CALCULATIONS FOR
 THE RAINWATER COLLECTION SYSTEM FOR THE NEW LOWER ROOF
 THAT COLLECTS THE RUNOFF FROM THE UPPER ROOF. INCLUDE
 1/2 THE AREA OF ANY VERTICAL WALL TO THE PROJECTED ROOF
 AREA. 2010 FPC SEC.1106.4.
 15) SHT. A5.4A - THE SINK AT THE COFFEE STATION IN
 PASSAGEWAY 415 SHALL BE COMPLY W/ FAC SEC. 606.3.
 16) SHT. A5.5A - TOILET ROOM 528 - THE DOOR APPEARS TO
 BE SWINGING INTO THE CLEAR FLOOR SPACE FOR THE
 LAVATORIES.DOORS SHALL NOT SWING INTO THE CLEAR FLOOR
 SPACE FOR ANY FIXTURE. SEE EXCEPTION #2 IN FAC
 SEC.603.2.3.
 17) SHT. A5.3A - THE DOORS APPEAR TO SWING INTO THE
 CLEAR FLOOR SPACE FOR TOILET ROOMS 319A & 319.B.DOORS
 SHALL NOT SWING INTO THE CLEAR FLOOR SPACE FOR ANY
 FIXTURE. SEE EXCEPTION #2 IN FAC SEC.603.2.3.
 18) SHT.A6.6A - TOILET ROOMS 621A & 610B - THE DOORS
 APPREAR TO SWING INTO THE CLEAR FLOOR SPACE FOR THE
 LAVATORIES. COMPLY WITH FAC SEC.603.2.3. SEE EXCEPTION
 #2.
 19) SHT.A6.6A - SINK IN STAFF LOUNGE # 636 SHALL COMPLY
 W/ FAC SEC.606.3.
 20) IN ALL GANG RESTROOMS, WHERE LAVATORIES ARE
 PROVIDED AT LEAST ONE SHALL COMPLY W/ FAC SEC. 606 AND
 SHALL NOT BE LOCATED IN A TOILET COMPARTMENT PER THE
 2010 FAC SEC.213.3.4.
 21) SHT.A9.1 - IT APPEARS THE OVERFLOW SCUPPERS FOR THE
 6TH FLOOR ROOF DISCHARGE ONTO THE 3RD FLOOR ROOF. THE
 3RD FLOOR ROOF DRAINAGE SYSTEM SHALL BE SIZED TO HANDLE
 THE ADDITIONAL DRAINAGE. THIS ALSO APPEARS TO OCCUR ON
 THE UPPER ROOFS DISCHARGING TO THE LOWER ROOFS.
 CLARIFY.
 22) SHT. MG4.4A - CARIFY EXACTLY WHAT IS BEING REMOVED
 FROM THIS AREA.
 22) SHT.P4.3A - THE 6" RWL IS ALSO NOTED AS A 2" VENT.
 CLARIFY.
 24) SHT.P4.3A - SHOWS A RAINWATER LINE PENETRATING THE
 THE STAIR ENCLOSURE. THIS IS NOT PERMITTED PER THE 2010
 FBC SEC.1022.3, 1022.4. THIS IS ALSO SHOWN ON SHT.
 P5.6A.
 25) SHT. P5.7A DOES SHOW ANY PROVISION FOR EEMERGENCY
 DRAINAGE FOR THE STAIR EXTENSION TO THE ROOF. CLARIFY.
 26) SHT. P6.2 - THE SQUARE FOOTAGE DRAINED GOES FROM
 2701 SQ. FT. TO 2107 SQ. FT. THIS IS AN OBVIOUS TYPO
 ERROR. PLEASE CORRECT.
 27) INDICATE THE SLOPE OF THE RAINWATER PIPING. COMPLY
 W/2010 FPC TABLE 1106.3 FOR THE HORIZONTAL STORM
 DRAINAGE PIPING.
 28) PLEASE IDENTIFY THE AREAS ON THE STORM WATER RISER.
 IT IS EXTREMELY DIFFICULT TO CORRELATE THE PIPING WITH
 THE APPLICABLE AREAS.
 29) SIZE ALL SECTIONS OF THE VENTING SYSTEM ON THE
 SANITARY ISOMETRIC. COMPLY WITH 2010 FPC TABLE
 916.1.WPB AMEND. TO 2010 107.3.5.1.3.
 30) SHT. P6.4 - IDENTIFY THE FIXTURES ON THE WATER
 RISER. WPB AMEND. TO 2010 FBC SEC. 107.3.5.1.3.
 31) ALL HOSE BIBBS SHALL BE VALVED PER FPC SEC.606.2.
 32) THE PLANS SHOW NEW HYDRAULIC ELEVATORS BEING
 INSTALLED. AN OIL SEOARATOR IS REQUIRED N THE PIT IN
 ACCORDANCEWITH THE 2010 FPC SEC.1003.4.
  
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  
  
  
  
  
  
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2016-03-31 Cont ID  
Sent By skennedy Date 2016-03-31 Time 14:24 Rev Time 0.00
Received By skennedy Date 2016-03-31 Time 14:24 Sent To  
Notes
2016-03-31 14:35:371ST REVIEW:
  
 SIGNATURES:
  
 THE SUBMITTED PLANS AND SUPPORTING DOCUMENT REQUIRED TO
 BE SIGNED AND SEALED PURSUANT TO FAC 61G1-16 & FAC
 61G15 ARE NOT DIGITALLY SIGNED BUT RATHER SOME ARE
 SCANNED COPIES OF WHAT APPEARS TO BE SIGNED AND SEALED
 ORIGINALS AND SOME ARE NOT SIGNED & SEALED AT ALL.
 PLEASE PROVIDE A PHYSICAL SET OF SIGNED AND SEALED
 PLANS, OR SUBMIT INDENTICAL DUPLICATE DOCUMENTS
 DIGITALLY SIGNED AND SEALED. IF YOU HAVE ACCESS TO THE
 FDOT PEDDS SYSTEM, YOU MAY SUBMIT PEDDS.
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]
  
  

Review Stop Z ZONING
Rev No 4 Status P Date 2016-03-28 Cont ID  
Sent By eschneid Date 2016-03-28 Time 19:21 Rev Time 0.50
Received By eschneid Date 2016-03-28 Time 19:21 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 3 Status P Date 2015-12-14 Cont ID  
Sent By eschneid Date 2015-12-14 Time 13:58 Rev Time 1.00
Received By eschneid Date 2015-12-14 Time 13:14 Sent To  
Notes
2015-12-14 14:03:59PASSED
  
 1) PLEASE REMEMBER THAT THE DEMOLITION OF THE
 AUDITORIUM BUILDING, PARKING AREAS AND THE NEW
 LANDSCAPE APPROVED AS PART OF THE MINOR PLANNED
 DEVELOPMENT AMENDMENT WHICH APPROVED THE EXPANSION WILL
 REQUIRE SEPARATE PERMITS WITH PLANS.
  
 2) THE LANDSCAPE AND PARKING WORK WILL NEED TO BE
 INSTALLED AND PASS INSPECTIONS PRIOR TO THE C.O. FOR
 THE ADDITIONAL STORIES INCLUDED WITH THIS PERMIT.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446.
  
  

Review Stop Z ZONING
Rev No 2 Status F Date 2015-07-21 Cont ID  
Sent By eschneid Date 2015-07-21 Time 15:07 Rev Time 0.75
Received By eschneid Date 2015-07-21 Time 15:07 Sent To  
Notes
2015-07-21 15:09:03FAILED
  
 PLEASE PROVIDE WRITTEN RESPONSE TO COMMENTS.
  
 1) SHEET AS3.1 SHALL BE UPDATED TO REFLECT THE LATEST,
 CORRECT PARKING COUNTS.
  
 2) THE DEMOLITION OF THE AUDITORIUM AND THE REPLACEMENT
 PARKING LOT REQUIRE SEPARATE PERMITS.
  
 3) THE ELEVATIONS SHOWN ON SHEETS S5.4 AND S5.5 ARE NOT
 THE LATEST APPROVED ELEVATIONS, NOR DO THEY MATCH THE
 ELEVATIONS PROVIDED ON SHEETS A10.1 AND A10.2.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446.
  

Review Stop Z ZONING
Rev No 1 Status F Date 2015-04-17 Cont ID  
Sent By eschneid Date 2015-04-17 Time 09:36 Rev Time 0.25
Received By eschneid Date 2015-04-17 Time 09:36 Sent To  
Notes
2015-04-17 09:38:40FAILED
  
 THE MINOR AMENDMENT FOR THIS PROJECT HAS NOT BEEN
 APPROVED BY ZONING. PENDING RESUBMITTAL BY THE
 APPLICANT. ONCE THE AMENDMENT HAS BEEN APPROVED, ZONING
 WILL REVIEW THE PERMIT FOR COMPLIANCE.
  
 THIS WILL NOT COUNT AS ONE OF THE ZONING REVIEW CYCLES.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved