Plan Review Details - Permit 15020156
Plan Review Stops For Permit 15020156
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2015-04-01 Cont ID  
Sent By skennedy Date 2015-04-01 Time 16:42 Rev Time 0.00
Received By skennedy Date   Time   Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2015-03-19 Cont ID  
Sent By skennedy Date 2015-03-19 Time 17:25 Rev Time 0.00
Received By skennedy Date 2015-03-19 Time 17:25 Sent To  
Notes
2015-03-19 17:26:16SEE PREVIOUS COMMENT. NOT ADRESSED.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2015-02-13 Cont ID  
Sent By skennedy Date 2015-02-13 Time 09:30 Rev Time 0.00
Received By skennedy Date 2015-02-13 Time 09:30 Sent To  
Notes
2015-02-13 09:39:571ST REVIEW: FBC 2010
  
 PLEASE SPECIFY ON SHEET A-2 SECTION A/A2, WEDGE ANCHOR
 DEPTH INTO BEAM, IE: LENGTH OF ANCHOR AND ANY PROPOSED
 EPOXY NEEDED TO HANDLED THE FORCE IMPOSED.
 FBC 107.3.5.3 5. STRUCTURAL REQUIREMENTS SHALL INCLUDE:
 WALL SECTION FROM FOUNDATION THROUGH ROOF, INCLUDING
 ASSEMBLY AND MATERIALS CONNECTOR
 TABLES
  
  
 IMPORTANT NOTICE EFFECTIVE MARCH 2, 2015, ALL PERMIT
 APPLICATION PLAN REVIEWS WILL BE PERFORMED
 ELECTRONICALLY
 UPON APPLICATION AND FEE PAYMENT DESIGN DOCUMENTS
 SUBMISSION OPTIONS ARE AS FOLLOWS:
 1. UPLOAD VIA THE PROJECTDOX PORTAL WITH DIGITAL
 SIGNATURES OF DESIGN PROFESSIONALS AS APPLICABLE; USE
 THE REQUIRED NAMING CONVENTION FOR EACH DOCUMENT
 2. INCLUDE ON A CD IF DESIGN PROFESSIONAL DIGITAL
 SIGNATURES ARE PROVIDED AS REQUIRED; USE THE REQUIRED
 NAMING CONVENTION FOR EACH DOCUMENT
 3. INCLUDE ON A CD WITH ONE SET OF TRADITIONAL PAPER
 DESIGN DOCUMENTS SIGNED AND SEALED AS REQUIRED; USE THE
 REQUIRED NAMING CONVENTION FOR EACH DOCUMENT
 4. ONE SET OF TRADITIONAL PAPER DESIGN DOCUMENTS
 SUBJECT TO ADMINISTRATIVE FEES TO DIGITIZE THE
 DOCUMENTS
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]
  

Review Stop E ELECTRICAL
Rev No 1 Status N Date 2015-03-19 Cont ID  
Sent By skennedy Date 2015-03-19 Time 17:28 Rev Time 0.00
Received By skennedy Date   Time   Sent To  
Notes
2015-02-19 17:48:27NEW SHEET SUBMITTED. JG.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-03-19 Cont ID  
Sent By skennedy Date 2015-03-19 Time 17:28 Rev Time 0.00
Received By skennedy Date 2015-02-19 Time 12:45 Sent To  
Notes
2015-02-24 12:46:26REVISION SENT TO STEVE KENNEDY FOR REVIEW. JG.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-02-13 Cont ID  
Sent By skennedy Date 2015-02-13 Time 09:34 Rev Time 0.00
Received By skennedy Date 2015-02-05 Time 18:51 Sent To  
Notes
2015-02-05 18:51:37SENT TO S KENNEDY

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2015-03-19 Cont ID  
Sent By skennedy Date 2015-03-19 Time 17:26 Rev Time 0.00
Received By skennedy Date 2015-03-19 Time 17:26 Sent To E
Notes
2015-02-19 17:49:03NEW SHEET SUBMITTED. JG.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2015-02-13 Cont ID  
Sent By skennedy Date 2015-02-13 Time 09:34 Rev Time 0.00
Received By skennedy Date 2015-02-13 Time 09:34 Sent To  
Notes
***NONE***