|
 |
 |
 |
 |
 |
Plan Review Details - Permit 15020124
| Plan Review Stops For Permit 15020124 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2015-03-21 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2015-03-21 |
Time |
11:19 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2015-03-21 |
Time |
11:19 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2015-03-10 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2015-03-10 |
Time |
15:20 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2015-03-10 |
Time |
15:18 |
Sent To |
|
|
| Notes |
| 2015-03-10 15:20:42 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | 1. A SOLID RATHER THAN VENTED PRODUCT IS NOW PROPOSED. | | | | | | REVISE PLAN TO SHOW ATTIC VENTING REQUIRED BY FBC 2010 | | | RESIDENTIAL 806.1. | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2015-02-24 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2015-02-24 |
Time |
15:38 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2015-02-24 |
Time |
15:38 |
Sent To |
|
|
| Notes |
| 2015-02-24 15:45:33 | ****CORRECTIONS**** | | | ****REVISED 2/26 AND EMAILED APPLICANT**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | 1. THE SOFFIT OPTION SELECTED HAS A DP LIMITATION OF +? | | | / -64.4 PSF. FOR 10SF (AREA TRIBUTARY TO A FASTENER), | | | 20' MRH, EXPOSURE D, DESIGN PRESSURES REQUIRED ARE | | | +48.5/-52.6 FOR ZONE 4, AND +48.5/-65PSF FOR ZONE 5. | | | CONTRACTOR HAS SELECTED A SYSTEM WHICH DOES NOT HAVE A | | | POSITIVE DESIGN PRESSURE LIMITATION (PLEASE CONTACT | | | MANUFACTURER OR INDICATE WHERE IN THE PRODUCT APPROVAL | | | THIS IS ADDRESSED) AND DOES NOT MEET THE NEGATIVE | | | PRESSURE FOR ZONE 5. | | | | | | OBTAINING THE EXACT MRH AND/OR OBTAINING ENGINEERING | | | MAY RESULT IN LOWER PRESSURES. | | | | | | FBC 2010 RESIDENTIAL 301 | | | | | | **PLEASE ADVISE VIA EMAIL WHEN THIS IS RESUBMITTED - | | | REVIEW WILL BE DONE TIMELY** | | | | | | ***2/26 - NEGATIVE DP FOR MRH20', ZONE5, 169MPH IS | | | -64.75PSF (DOES NOT MEET REQUIREMENT OF -64.4; PLEASE | | | VERIFY MRH OR OBTAIN ENGINEERING)*** | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2015-02-04 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2015-02-04 |
Time |
17:54 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2015-02-04 |
Time |
17:54 |
Sent To |
|
|
| Notes |
| 2015-02-04 17:58:48 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | 1. THE SOFFIT OPTION SELECTED HAS A DP LIMITATION OF | | | +80 / -42.2PSF. IT APPEARS THAT THIS IS EXPOSURE D, AND | | | MEAN ROOF HEIGHT NOT PROVIDED (MRH IS THE AVERAGE OF | | | ROOF PEAK AND EAVE). PLEASE PROVIDE SO THAT DESIGN | | | PRESSURES CAN BE DETERMINED. | | | | | | FOR 10SF (AREA TRIBUTARY TO A FASTENER), 20' MRH, | | | EXPOSURE D, DESIGN PRESSURES REQUIRED ARE +48.5/-52.6 | | | FOR ZONE 4, AND +48.5/-65PSF FOR ZONE 5. PLEASE | | | ADDRESS. | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2015-03-21 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2015-03-21 |
Time |
11:19 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2015-03-18 |
Time |
18:55 |
Sent To |
|
|
| Notes |
| 2015-03-20 18:55:39 | SENT TO SAMANTHA HILL FOR REVIEW. JG. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2015-03-10 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2015-03-10 |
Time |
15:20 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2015-03-04 |
Time |
15:23 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2015-02-04 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2015-02-04 |
Time |
17:54 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2015-02-04 |
Time |
17:54 |
Sent To |
|
|
| Notes |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |