Plan Review Details - Permit 15010873
Plan Review Stops For Permit 15010873
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2015-04-13 Cont ID  
Sent By skennedy Date 2015-04-13 Time 11:07 Rev Time 0.00
Received By skennedy Date 2015-04-13 Time 11:07 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2015-03-05 Cont ID  
Sent By skennedy Date 2015-03-05 Time 07:40 Rev Time 0.00
Received By skennedy Date 2015-03-05 Time 07:40 Sent To  
Notes
2015-03-05 07:40:541ST REVIEW: FBC 2010
  
 1) FBC 107.3.4 - PROVIDE PRODUCT APPROVALS FOR THOSE
 PRODUCTS WHICH ARE REGULATED BY FAC RULE 9N-3 REVIEWED
 AND APPROVED IN WRITING BY THE DESIGNER OF RECORD.
 SPECIFICALLY, PROVIDE ROOFING, WINDOW, AND DOOR
 SUBMITTALS.
  
 2) FCB 107.3.5.3 (13)- PROVIDE AN ENERGY SUBMITTAL.
  
 3) FBC 109.3 BUILDING PERMIT VALUATION. FOR PERMITTING
 PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL BE
 TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL,
 ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH,
 RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES,
 MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY
 LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST
 PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS
 SERVICES (MARSHALL-SWIFT,) THE VALUATION OF $20,000.00
 IS LOW. PLEASE AMMEND THE PRIMARY APPLICATION TO
 INCLUDE THE VALUES INDICATED ON THE SUB PERMIT
 APPLICATIONS.
  
 4) FBC-EXISTING BUILDING CODE CHAPTER 4 - PROJECT DATA
 ON SHEET A-2 SHOULD BE AMMENDED TO INDICATE THAT THE
 SCOPE OF WORK IS ALSO AN ADDITION. THE BLOCK CONTAING
 THE INFORMATION INDICATES IT IS AN "ALTERATION LEVEL
 II." ALTHOUGH ADDITION IS MENTIONED IN THE INFORMATION,
 IT SHOULD BE NOTED THAT THE SCOPE IS ALSO "ADDITION."
  
 5) FBC-RESIDENTIAL BUILDING CODE CHAPTER 3 -
 ENGINEERING CRITERIA ON SHEET A-2 SHOULD BE AMMENDED TO
 INDICATE THAT THEAPPLICABLE CDOE IS: "FBC-RESIDENTIAL
 BUILDING CODE" AND THE WIND DESIGN CRITERIA IS FOUND IN
 CHAPTER 3.
  
  
 IMPORTANT NOTICE EFFECTIVE MARCH 16, 2015, ALL PERMIT
 APPLICATION PLAN REVIEWS WILL BE PERFORMED
 ELECTRONICALLY
 UPON APPLICATION AND FEE PAYMENT DESIGN DOCUMENTS
 SUBMISSION OPTIONS ARE AS FOLLOWS:
 1. UPLOAD VIA THE PROJECTDOX PORTAL WITH DIGITAL
 SIGNATURES OF DESIGN PROFESSIONALS AS APPLICABLE; USE
 THE REQUIRED NAMING CONVENTION FOR EACH DOCUMENT
 2. INCLUDE ON A CD IF DESIGN PROFESSIONAL DIGITAL
 SIGNATURES ARE PROVIDED AS REQUIRED; USE THE REQUIRED
 NAMING CONVENTION FOR EACH DOCUMENT
 3. INCLUDE ON A CD WITH ONE SET OF TRADITIONAL PAPER
 DESIGN DOCUMENTS SIGNED AND SEALED AS REQUIRED; USE THE
 REQUIRED NAMING CONVENTION FOR EACH DOCUMENT
 4. ONE SET OF TRADITIONAL PAPER DESIGN DOCUMENTS
 SUBJECT TO ADMINISTRATIVE FEES TO DIGITIZE THE
 DOCUMENTS
  
  
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2015-04-09 Cont ID  
Sent By dhayes Date 2015-04-09 Time 11:29 Rev Time 0.00
Received By dhayes Date 2015-04-09 Time 11:28 Sent To  
Notes
2015-04-09 11:39:56ROUTED TO S. KENNEDY'S DESK FOR BUILDING AND MECHANICAL
 REVIEWS

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2015-03-02 Cont ID  
Sent By rmcdouga Date 2015-03-02 Time 11:43 Rev Time 0.00
Received By dhayes Date 2015-03-02 Time 10:54 Sent To B
Notes
2015-03-02 11:43:043/2/2015
 PROJECT: 321 VALENCIA RD. ADDITION
 PERMIT#: 15010873
 CODE: 2008 EDITION OF THE NEC, 2010 EDITION OF THE FBC
 ,2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1,
 ADMINISTRATION, 2012 FBC SUPPLEMENTS.
 1ST ELECTRICAL PLAN REVIEW
 ACTION: APPROVED WITH EXCEPTION
  
 PROVIDE REVISED PLANS AND DOCUMENTATION ON SITE TO THE
 INSPECTOR AT THE FIRST INSPECTION TO INCLUDE THE
 FOLLOWING:
  
 1) NEC 230.70
 INDICATE THE LOCATION OF THE ELECTRICAL PANEL TO BE IN
 COMPLIANCE WITH THE NEC. 230.70
  
 2) 240.4, 240.24, 310.15(B)(6), 310.16
 A CODE COMPLIANT RISER DIAGRAM SHALL BE ON SITE FOR THE
 INSPECTOR TO INDICATE COMPLIANCE WITH NEC 240.4,
 240.24, 310.15(B)(6), AND 310.16
  
 3) NEC215.5
 PROVIDE A REVISED LOAD CALCULATION TO INDICATE THE
 ADDITION OF NEW LOADS.
  
 4) NEC 408.4
 PROVIDE A NEW PANEL SCHEDULE TO INDICATE THE ADDITION
 OF NEW LOADS.
  
 5) NEC 250.94
 PROVIDE AN INTERSYSTEM BOND STRIP AT THE ELECTRICAL
 SERVICE ON THE ELECTRICAL GROUNDING ELECTRODE.
  
 6) NEC 210.12
 PROVIDE ARC FAULT CIRCUIT PROTECTION ON ALL NEW
 CIRCUITS FOR THE NEW BEDROOM.
  
 7) NEC 406.11
 RECEPTACLES SHALL BE TAMPER RESISTANT.
  
 8) FBC-RESIDENTIAL 314 AND 315.
 PROVIDE SMOKE DETECTORS AS REQUIRED BYTHE FBC. VERIFY
 ALL SMOKE DETECTORS ARE INSTALLED AND INTERCONNECTED
 THROUGHOUT THE EXISTING RESIDENCE.
  
 DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421,
 561-805-6717 OR [email protected]
  

Review Stop HIST HISTORICAL
Rev No 2 Status P Date 2015-04-08 Cont ID  
Sent By fmittner Date 2015-04-08 Time 11:22 Rev Time 0.00
Received By fmittner Date 2015-04-08 Time 11:22 Sent To B
Notes
***NONE***

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2015-01-28 Cont ID  
Sent By fmittner Date 2015-01-28 Time 09:52 Rev Time 0.00
Received By fmittner Date 2015-01-28 Time 09:52 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2015-04-24 Cont ID  
Sent By skennedy Date 2015-04-24 Time 15:20 Rev Time 0.00
Received By skennedy Date 2015-04-23 Time 12:26 Sent To  
Notes
2015-04-23 12:26:10TO SAK DESK
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-04-13 Cont ID  
Sent By skennedy Date 2015-04-13 Time 11:18 Rev Time 0.00
Received By skennedy Date 2015-03-30 Time   Sent To  
Notes
2015-03-30 12:21:12PER PHONE CONV W/ F MITTNER SHE WILL COME DOWN & GET
 PERMIT PKG FOR HISTORIC APPROVAL

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-03-05 Cont ID  
Sent By skennedy Date 2015-03-05 Time 08:00 Rev Time 0.00
Received By skennedy Date 2015-01-28 Time 16:29 Sent To  
Notes
2015-01-28 16:32:18R16
  

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status P Date 2015-04-16 Cont ID  
Sent By skennedy Date 2015-04-16 Time 12:24 Rev Time 0.00
Received By skennedy Date 2015-04-16 Time 12:24 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2015-03-05 Cont ID  
Sent By skennedy Date 2015-03-05 Time 07:39 Rev Time 0.00
Received By skennedy Date 2015-03-05 Time 07:39 Sent To  
Notes
2015-03-05 07:40:031ST REVIEW: FBC 2010
  
 PLANS REQUIRE REVIEW BY THE PBC IMPACT FEE OFFICE. CALL
 233-5025. UPON APPROVAL, YOU MAY CHECK OUT ONE PLAN AND
 TAKE TO THAT OFFICE FOR REVIEW. PLEASE RETURNED STAMPED
 WITH A COPY OF RECEIPT AS APPLICABLE.
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]
  
  

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2015-04-13 Cont ID  
Sent By skennedy Date 2015-04-13 Time 11:07 Rev Time 0.00
Received By skennedy Date 2015-04-13 Time 11:07 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2015-03-05 Cont ID  
Sent By skennedy Date 2015-03-05 Time 07:37 Rev Time 0.00
Received By skennedy Date 2015-02-25 Time 07:59 Sent To  
Notes
2015-03-05 07:39:021ST REVIEW: FBC 2010
  
 NO MECHANICAL PLANS HAVE BEEN PROVIDED. PROVIDE PLANS
 PER FBC 107.
  
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]
  
  

Review Stop P PLUMBING
Rev No 2 Status P Date 2015-04-13 Cont ID  
Sent By skennedy Date 2015-04-13 Time 10:45 Rev Time 0.00
Received By skennedy Date 2015-04-13 Time 10:45 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2015-01-31 Cont ID  
Sent By tklarge Date 2015-01-31 Time 07:25 Rev Time 0.00
Received By tklarge Date 2015-01-31 Time 07:11 Sent To  
Notes
2015-01-31 07:26:15A CODE COMPLIANT SANITARY RISER SHALL BE ONSITE FOR
 INSPECTOR AT ROUGH PLUMBING INSPECTION.

Review Stop R ROOF PLAN REVIEW
Rev No 3 Status P Date 2015-04-24 Cont ID  
Sent By skennedy Date 2015-04-24 Time 15:20 Rev Time 0.00
Received By skennedy Date 2015-04-24 Time 15:20 Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status F Date 2015-04-13 Cont ID  
Sent By skennedy Date 2015-04-13 Time 11:09 Rev Time 0.00
Received By skennedy Date 2015-04-13 Time 11:09 Sent To  
Notes
2015-04-13 11:18:272ND REVIEW: FBC 2010
  
 FBC 107: THE PRODUCT APPROVALS SUBMITTED FOR THE ROOF
 WERE FOR TILE ONLY WITH NO SECONDARY WATER RESISTANT
 BARRIER. THE ROOF SECTION ONLY INDICATES A SINGLE 30#
 UNDERLAYMENT. PLEASE SPECIFY THE THE ENTIRE ROOFING
 SYSTEM PROPOSED. YOU MAY REVISE THE SECTION BY LETTER
 AND SUBMIT AN ADDITIONAL PRODUCT APPROVAL IF
 APPLICABLE.
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]
  

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status F Date 2015-03-05 Cont ID  
Sent By skennedy Date 2015-03-05 Time 07:43 Rev Time 0.00
Received By skennedy Date 2015-03-05 Time 07:43 Sent To  
Notes
2015-03-05 07:44:451ST REVIEW: FBC 2010
  
 SEE BUILDING PLAN REVIEW COMMENTS AS TO ROOFING PRODUCT
 APPROVAL.
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]
  

Review Stop Z ZONING
Rev No 1 Status P Date 2015-01-28 Cont ID  
Sent By fmittner Date 2015-01-28 Time 09:52 Rev Time 0.00
Received By fmittner Date 2015-01-28 Time 09:52 Sent To B
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy