| Plan Review Stops For Permit 15010373 |
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2015-01-15 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2015-01-15 |
Time |
05:15 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2015-01-15 |
Time |
04:59 |
Sent To |
|
|
| Notes |
| 2015-01-15 05:13:03 | 1) THE REPLACEMENT WATER HEATER IS 39,100 BTU'S MORE | | | THAN THE EXISTING GAS WATER HEATER. SUBMIT A COMPLETE | | | GAS RISER DRAWING SHOWING THE BTU LOAD OF EACH | | | CONNECTED APPLIANCE TO THE GAS SYSTEM, THE TOTAL BTU | | | LOAD ON THE SYSTEM, THE TOTAL DEVELOPED LENGTH FROM THE | | | GAS METER TO THE MOST REMOTE OUTLET, AND THE PSI OF THE | | | GAS BEING DELIVERED TO THE APPLIANCES.THIS WILL ALLOW | | | ME TO CHECK THE ENTIRE SYSTEM TO MAKE SURE IT IS | | | PROPERLY SIZED AND WILL NOT CREATE A CODE VIOLATION OR | | | SAFETY HAZARD. WPB AMEND. TO 2010 FBC SEC. 107.2.1. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | | | | | | 2015-01-14 11:49:29 | ROUTED TO PLUMBING LESS THAN $5000 |
|
|
|