| 2015-02-24 10:37:09 | PLAN REVIEW COMMENTS |
| | |
| | 1ST REVIEW: FBC 2010 |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY BUILDING |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) FBC 107.2.1 - INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | ALL INFORMATION, DRAWINGS, SPECIFICATIONS AND |
| | ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE OF |
| | THE PERSON RESPONSIBLE FOR THE DESIGN. |
| | |
| | 2) FBC 107.3.5.3 - PROVIDE WIND DESIGN LOADS/DESIGN |
| | PRESSURES PURSUANT TO FBC-R301.2. |
| | |
| | 3) SPECIFY THE SLOPE OF THE PORCH ROOF ON THE PLANS. A |
| | MININIUM OF SLOPE OF 2:12 IS REQUIRED FOR ASPHALT |
| | SHINGLES. FBC R905.2.2 |
| | |
| | 4) SPECIFY THE DESIGN LIVE LOAD FOR THE PORCH DECK. FBC |
| | R 301.5 |
| | |
| | 5) SPECIFY THE HEIGHT OF THE PORCH DECK ABOVE GRADE. |
| | FBC 107.2.1 |
| | |
| | 6) SPECIFY THE HEIGHT OF THE GUARDS AND THE SPACING OF |
| | THE INTERMEDIATE RAILINGS. FBC R312, R312.2 & R312.3 |
| | |
| | 7) SPECIFY THE DEPTH/THICKNESS OF THE 1'-6" X 1'-6" |
| | FOOTINGS FOR THE PORCH POSTS. FBC 107.2.1 |
| | |
| | 8) FBC 107.3.4 - PROVIDE TWO SETS OF PRODUCT APPROVALS |
| | FOR THOSE PRODUCTS WHICH ARE REGULATED BY DCA RULE 9N-3 |
| | THAT HAVE BEEN REVIEWED AND APPROVED IN WRITING BY THE |
| | DESIGNER OF RECORD. SPECIFICALLY, PROVIDE ROOFING AND |
| | STRUCTURAL CONNECTOR SUBMITTALS. |
| | |
| | 9) THE VALUE OF $1200.00 THAT IS SPECIFIED ON THE |
| | APPLICATION IS LOW. FBC 109.3 BUILDING PERMIT |
| | VALUATION. FOR PERMITTING PURPOSES, VALUATION OF |
| | BUILDINGS AND SYSTEMS SHALL BE TOTAL REPLACEMENT VALUE |
| | TO INCLUDE STRUCTURAL, ELECTRIC, PLUMBING, MECHANICAL, |
| | INTERIOR FINISH, RELATIVE SITE WORK, ARCHITECTURAL AND |
| | DESIGN FEES, MARKETING COSTS, OVERHEAD AND PROFIT; |
| | EXCLUDING ONLY LAND VALUE. VALUATION REFERENCES MAY |
| | INCLUDE THE LATEST PUBLISHED DATA OF NATIONAL |
| | CONSTRUCTION COST ANALYSIS SERVICES (MARSHALL-SWIFT, |
| | MEANS, ETC.), AS PUBLISHED BY INTERNATIONAL CODE |
| | CONGRESS. FINAL BUILDING PERMIT VALUATION SHALL BE SET |
| | BY THE BUILDING OFFICIAL. |
| | |