Plan Review Details - Permit 15010278
Plan Review Stops For Permit 15010278
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2015-04-30 Cont ID  
Sent By ndaniels Date 2015-04-30 Time 15:08 Rev Time 0.00
Received By ndaniels Date   Time   Sent To  
Notes
2015-04-30 15:09:10BY SAK

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2015-03-30 Cont ID  
Sent By skennedy Date 2015-03-30 Time 10:05 Rev Time 0.00
Received By skennedy Date 2015-03-30 Time 10:05 Sent To ENG
Notes
2015-03-30 10:09:202ND REVIEW: FBC 2010
  
 107.3.5.1.1 BUILDING
  
 IT APPEARS THE PROPOSED WORK IS TO ESTABLISH OR
 REESTABLISH A PARKING LOT. PLEASE PROVIDE A STRIPING
 PLAN AND SHOW ACCESSIBLE PARKING AND ROUTE
 REQUIREMENTS.
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2015-01-13 Cont ID  
Sent By skennedy Date 2015-01-13 Time 15:53 Rev Time 0.00
Received By skennedy Date 2015-01-13 Time 15:53 Sent To Z
Notes
2015-01-13 15:55:401ST REVIEW: FBC 2010
  
 PLANS ARE INADEQUATE TO DETERMINE SCOPE OF WORK.
  
 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
 CONSTRUCTION DOCUMENTS SHALL BE DIMENSIONED AND DRAWN
 UPON SUITABLE MATERIAL. ELECTRONIC MEDIA DOCUMENTS
 SHALL BE SUBMITTED WHEN APPROVED BY THE BUILDING
 OFFICIAL. CONSTRUCTION DOCUMENTS SHALL BE OF SUFFICIENT
 CLARITY TO INDICATE THE LOCATION, NATURE AND EXTENT OF
 THE WORK PROPOSED AND SHOW IN DETAIL THAT IT WILL
 CONFORM TO THE PROVISIONS OF THIS CODE AND RELEVANT
 LAWS, ORDINANCES, RULES AND REGULATIONS, AS DETERMINED
 BY THE BUILDING OFFICIAL. SUCH DRAWINGS AND
 SPECIFICATIONS SHALL CONTAIN INFORMATION, IN THE FORM
 OF NOTES OR OTHERWISE, AS TO THE QUALITY OF MATERIALS,
 WHERE QUALITY IS ESSENTIAL TO CONFORMITY WITH THE
 TECHNICAL CODES. SUCH INFORMATION SHALL BE SPECIFIC,
 AND THE TECHNICAL CODES SHALL NOT BE CITED AS A WHOLE
 OR IN PART, NOR SHALL THE TERM "LEGAL" OR ITS
 EQUIVALENT BE USED AS A SUBSTITUTE FOR SPECIFIC
 INFORMATION. ALL INFORMATION, DRAWINGS, SPECIFICATIONS
 AND ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE
 OF THE PERSON RESPONSIBLE FOR THE DESIGN. (SEE ALSO
 SECTION 107.3.5).
  
 FBC 107.2.1.4 QUALITY OF BUILDING PLANS. BUILDING PLANS
 SHALL BE DRAWN TO A MINIMUM 1/8 INCH SCALE UPON
 SUBSTANTIAL PAPER, CLOTH OR OTHER ACCEPTABLE MEDIUM.
 THIS POLICY MAY INCLUDE SUCH THINGS AS MINIMUM SIZE,
 SHAPE, CONTRAST, CLARITY, OR OTHER ITEMS RELATED TO
 RECORDS MANAGEMENT.
  
 MINIMUM PLAN REVIEW CRITERIA:
  
 107.3.5.1.1 BUILDING
 1. SITE REQUIREMENTS:
 PARKING
 ACCESSIBILITY
 FIRE ACCESS
 VEHICLE LOADING
 DRIVING/TURNING RADIUS
  
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]
  

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2015-04-13 Cont ID  
Sent By cranford Date 2015-03-31 Time 08:30 Rev Time 0.00
Received By cranford Date 2015-03-31 Time 08:12 Sent To I
Notes
2015-03-31 08:29:47PUBLIC WORKS DEPT. COMMENTS
  
 PASSED WITH PROVISO: THREE (3) LOADING ZONE ONLY SIGNS
 (MUTCD TYPE R8-3GP) TO BE EVENLY SPACED ALONG BUILDING
 FRONTAGE. BOTTOM OF SIGNS ARE TO BE SEVEN (7) FEET
 ABOVE THE LOADING ZONE SURFACE.
  
  
 KELLY CRANFORD, PE
 CITY LAND DEVELOPMENT ENGINEER
 [email protected]
 561-494-1098 (OFFICE)
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2015-02-02 Cont ID  
Sent By cranford Date 2015-02-02 Time 14:40 Rev Time 0.00
Received By cranford Date 2015-01-26 Time 10:06 Sent To I
Notes
2015-02-02 14:37:00SUBMITTED QUOTE INCLUDES REMOVAL OF EXISTING ASPHALT
 AND DRAINAGE BOXES. IT APPEARS THAT WORK WAS DONE UNDER
 VOIDED PERMIT 05070122.
  
 PLEASE CLARIFY PROPOSED CONSTRUCTION ACTIVITIES.
  
 KELLY CRANFORD, PE
 PUBLIC WORKS
 (561)494-1098
2015-01-26 10:08:14SUBMITTED QUOTE INCLUDES REMOVING DRAINAGE BOXES

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2015-03-31 Cont ID  
Sent By cranford Date 2015-04-13 Time 14:32 Rev Time 0.00
Received By cranford Date 2015-03-02 Time   Sent To  
Notes
2015-03-19 11:54:16TO MISC 2 BOX.
2015-03-02 12:29:29INCOMING SENT TO ZONING BOX.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-02-15 Cont ID  
Sent By skennedy Date 2015-02-15 Time 09:21 Rev Time 0.00
Received By skennedy Date 2015-01-23 Time 09:18 Sent To  
Notes
2015-02-15 09:25:27THE ORIGINAL AND RE-SUBMITTAL ARE SEPARATED AND WERE
 NOT PROCESSED PROPERLY. NONE THE LESS THE APPLICATION
 CANNOT BE APPROVED DUE TO DEFICIENTCIES IN THE PLAN.
2015-01-24 09:28:58SENT TO ZONING BOX. THIS PERMIT HAS NOT COMPLETED ALL
 REVIEWS, ENGINEERING NOT COMPLETED.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-02-02 Cont ID  
Sent By cranford Date 2015-02-02 Time 14:40 Rev Time 0.00
Received By shill Date 2015-01-13 Time 15:53 Sent To  
Notes
2015-01-29 11:23:28TO MISC 2 BOX.
2015-01-20 16:22:06TO S. KENNEDY.

Review Stop Z ZONING
Rev No 3 Status P Date 2015-03-19 Cont ID  
Sent By aaponte Date 2015-03-19 Time 11:51 Rev Time 0.00
Received By aaponte Date 2015-03-19 Time 11:51 Sent To  
Notes
2015-03-19 11:53:35PROVISO: 1. ALL PLANTING AREAS SHALL BE PROTECTED BY A
 CURB OR RAISED EDGE MIN, 6" IN HEIGHT.
 2. PLANTING AGAINST THE BUILDING SHALL CONTINUE ALONG
 THE ENTIRE BUILDING WALL UP TO THE UTILITY ROOM.
 FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA
 APONTE AT 561-8221439.

Review Stop Z ZONING
Rev No 2 Status F Date 2015-01-29 Cont ID  
Sent By aaponte Date 2015-01-29 Time 11:18 Rev Time 0.00
Received By aaponte Date 2015-01-29 Time 11:18 Sent To  
Notes
2015-01-29 11:22:21SUBMITTED INFORMATION IS INSUFFICIENT TO DETERMINE
 COMPLIANCE WITH DAC REQUIREMENTS. PLEASE SUBMIT A
 PAVING PLAN, ALONG WITH A LANDSCAPE PLAN SIGNED AND
 SEALED BY A LANDSCAPE ARCHITECT.
 PLANT MATERIAL SHALL BE SPECIFIED, AND PAVERS SPEC
 SHALL BE INDICATED. IRRIGATION PLANS ARE ALSO
 NECESSARY.
 FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA
 APONTE AT 561-821439.

Review Stop Z ZONING
Rev No 1 Status F Date 2015-01-20 Cont ID  
Sent By aaponte Date 2015-01-20 Time 16:19 Rev Time 0.00
Received By aaponte Date 2015-01-20 Time 16:19 Sent To ENG
Notes
2015-01-20 16:21:021. PLEASE PROVIDE ADDITIONAL INFORMATION TO EXPLAIN
 WHAT IS THE TYPE OF WORK PROPOSED.
 2. IMPROVEMENTS TO THIS AREA ARE CONDITIONED BY A DAC
 APPROVAL OF TDR TRANSFER.
 FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA
 APONTE AT 561-8221439.