Plan Review Details - Permit 14120917
Plan Review Stops For Permit 14120917
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2015-02-09 Cont ID  
Sent By skennedy Date 2015-02-09 Time 17:05 Rev Time 0.00
Received By skennedy Date 2015-02-09 Time 17:05 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2015-01-29 Cont ID  
Sent By jgomez Date 2015-01-29 Time 18:19 Rev Time 0.00
Received By jgomez Date 2015-01-29 Time 18:16 Sent To  
Notes
2015-01-29 18:23:18REVISION SECOND BUILDING REVIEW CHECKLIST.
 CODE: 2010 FBC.
  
 *****PLEASE REMOVE THE NAME OF JULIO GOMEZ, PERMIT #
 14-120371 AND PHONE NUMBER FROM SHEETS S-1 AND S-2
 SUBMITTED. THIS INFORMATION IS NOT PART OF THE
 CONSTRUCTION DRAWINGS AND I AM NOT THE DESIGNER.
  
 1- REVISE PROJECT ADDRESS NUMBER IN ALL SHEETS. THE
 CORRECT ADDRESS NUMBER IS 5615 S. FLAGLER DR. NOT 5616
 S. FLAGLER. SEC. 107.2.1 CITY AMENDMENTS TO FBC.
 (REPEAT COMMENT. NOT ADDRESSED).
  
 2- SHEET A-2: REVISE THE DESIGN DATA. THIS BUILDING IS
 LOCATED IN EXPOSURE "D" NOT "C". AND REVISE THE DESIGN
 PRESSURES ACCORDINGLY. SEC. R301.2.1.4.3 OF 2010
 FBC-RESIDENTIAL. (REPEAT COMMENT. NOT ADDRESSED).
  
 3- TERRACE GUARDRAIL: PROVIDE COMPLETE DETAILS AND
 SPECIFICATIONS SHOWING COMPLIANCE WITH THE LIVE LOADS
 OF TABLE R301.5 OF 2010 FBC-RESIDENTIAL. THERE IS NOT
 SPECS FOR POSTS AND CONNECTIONS AND GUARDRAIL SPECS AND
 CONNECTIONS. ALSO, PROVIDE INFORMATION SHOWING
 COMPLIANCE WITH THE REQUIREMENTS OF SEC. R312 OF 2010
 FBC-RESIDENTIAL. (REPEAT COMMENT. NOT ADDRESSED).
  
 4- PROVIDE PRODUCT APPROVAL (2 COPIES) AS REQUIRED BY
 DCA RULE 9N-3 FOR:
 A) THE UNDERLAYMENT SPECIFIED ON A/S-2 SECTION ON SHEET
 S-2. (UNDERLAYMENT PRODUCT APPROVAL WAS REQUESTED ON
 PREVIOUS CHECKLIST. THIS ITEM WAS NOT ADDRESSED).
 NOTE: PRODUCT APPROVAL NEED TO MEET THE DESIGN
 PRESSURES REQUIRED BY R301 OF 2010 FBC-RESIDENTIAL AND
 MUST BE COMPATIBLE FOR THE PROPOSED TERRACE ASSEMBLY.
  
 5- ENGINEER OF RECORD TO REVIEW AND APPROVE IN WRITING
 ABOVE PRODUCT APPROVAL. SEC. 107.3.4.1 CITY AMENDMENTS.
  
 6- SHEET S-1:
 A) PROVIDE COMPLETE PRE-ENGINEERED FLOOR JOIST PACKAGE
 SHOWING CONFORMANCE WITH THE TERRACE LOADS SPECIFIED BY
 THE ENGINEER ( DEAD LOAD 100 LBS PSF AND LIVE LOAD 125
 LBS PSF). SEC. 107.2.1.3 OF CITY AMENDMENTS TO FBC.
  
 B) SIZES OF FOOTINGS SHOWN ON THE FOUNDATION SCHEDULE
 ARE NOT CLEAR. FOR EXAMPLE FOOTING P1 IS 42" D X 42" W
 ?????. AND WHERE ARE P1 AND P2 LOCATED ON THE
 FOUNDATION PLAN?. SEC. 107.2.1 CITY AMENDMENTS.
  
 C) ORIGINAL APPROVED PLANS WERE DESIGNED BASED ON THE
 SPECIFIC TYPE OF SOIL ENCOUNTERED IN THIS AREA. NEW
 ENGINEER OF RECORD TO ACKNOWLEDGE IN WRITING THAT
 PROPOSED FOUNDATION DESIGN IS BASED ON THOSE SPECIFIC
 SOIL CONDITIONS . SEC. 107.2.1.3 CITY
 AMENDMENTS.(REPEAT COMMENT. NOT ADDRESSED).
  
 D) DESIGN SPECIFICATIONS NOTE #2 AND DESIGN CRITERIA AT
 THE BOTTOM LEFT OF THE SAME SHEET DOESN'T MATCH. REVISE
 AS REQUIRED. SEC. 107.2.1 CITY AMENDMENTS.
  
 E) HOW ARE THE LVL BEAMS ANCHORED TO THE COLUMNS? SEC.
 R301.1 OF 2010 FBC-RESIDENTIAL.
  
 F) PROVIDE COMPLETE DETAILS AND SPECIFICATIONS FOR THE
 KNEE WALLS?. SEC. R301.1 OF 2010 FBC-RESIDENTIAL.
  
 G) REVISE SIZE AND NUMBER OF FASTENERS REQUIRED FOR THE
 SIMPSON LUS-210. ALSO, REVISE INFORMATION ON SECTION
 A/S2. SEE SIMPSON PRODUCT APPROVAL FOR CORRECT SIZE AND
 NUMBER. SEC. 107.2.1 CITY AMENDMENTS.
  
 7- SCOPE OF WORK SUBMITTED WITH THIS REVISION INCLUDES
 A LOT MORE WORK THAN THE SPECIFIED ON THE ORIGINAL
 APPROVED PLANS. UPDATE VALUATION TO INCLUDE ALL LABOR,
 MATERIALS, CONTRACTOR'S OVERHEAD AND PROFIT AND ALL
 DESIGN PROFESSIONAL FEES AS REQUIRED BY SEC. 109.3 CITY
 AMENDMENTS. PROVIDE COPY OF SIGNED CONTRACT THAT
 INCLUDES ALL SPECIFIED WORK. (REPEAT COMMENT. NOT
 ADDRESSED).
  
 8- THERE IS A REVISION FEE OF $154.50 FOR THIS
 SUBMITTAL. (2 NEW DRAWINGS AND ONE NEW NOA).
  
 ***NOTE: THERE IS AN EXISTING FIREPLACE BETWEEN THE
 FIRST FLOOR AND THE TERRACE. THERE IS NO INFORMATION
 PROVIDED SHOWING THAT THE PROPOSED CONSTRUCTION WILL
 NOT CREATE A FIRE HAZARD. ADDITONAL INFORMATION MAY BE
 REQUIRED.
  
 ***PLEASE PROVIDE RESPONSE LETTER ADDRESSING EACH
 COMMENT TO EXPEDITE THE REVIEW PROCESS.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 (561)805-6712
 [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2015-01-08 Cont ID  
Sent By JGOMEZ Date 2015-01-08 Time 09:41 Rev Time 0.00
Received By jgomez Date 2015-01-08 Time 07:40 Sent To  
Notes
2015-01-08 10:11:14RESIDENTIAL (R3) REVISION BUILDING REVIEW COMMENTS.
 CODE: 2010 FBC.
  
 1- REVISE PROJECT ADDRESS NUMBER IN ALL SHEETS. THE
 CORRECT ADDRESS NUMBER IS 5615 S. FLAGLER DR. NOT 5616
 S. FLAGLER. SEC. 107.2.1 CITY AMENDMENTS TO FBC.
  
 2- SHEET A-2: REVISE THE DESIGN DATA. THIS BUILDING IS
 LOCATED IN EXPOSURE "D" NOT "C". AND REVISE THE DESIGN
 PRESSURES ACCORDINGLY. SEC. R301.2.1.4.3 OF 2010
 FBC-RESIDENTIAL.
  
 3- TERRACE GUARDRAIL: PROVIDE COMPLETE DETAILS AND
 SPECIFICATIONS SHOWING COMPLIANCE WITH THE LIVE LOADS
 OF TABLE R301.5 OF 2010 FBC-RESIDENTIAL. THERE IS NOT
 SPECS FOR POSTS AND CONNECTIONS AND GUARDRAIL SPECS AND
 CONNECTIONS. ALSO, PROVIDE INFORMATION SHOWING
 COMPLIANCE WITH THE REQUIREMENTS OF SEC. R312 OF 2010
 FBC-RESIDENTIAL.
  
 4- PROVIDE COMPLETE DETAILS AND SPECIFICATIONS FOR THE
 TERRACE FLOORING ASSEMBLY AS REQUIRED BY SEC. R903.1.
  
 5- PROVIDE PRODUCT APPROVAL (2 COPIES) AS REQUIRED BY
 DCA RULE 9N-3 FOR:
 A) TERRACE UNDERLAYMENT SPECIFIED ON ITEM #4 ABOVE.
  
 B) ALL STRUCTURAL CONNECTORS SPECIFIED ON ALL FRAMING
 PLANS AND DETAILS. PROVIDE FLORIDA PRODUCT APPROVAL
 COVER PAGE AND PAGE SHOWING THE SPECIFIED CONNECTOR OR
 LIST FLORIDA PRODUCT APPROVAL NUMBER NEXT TO THE
 SPECIFIED CONNECTOR IN ALL PLANS AND DETAILS.
  
 6- ENGINEER OF RECORD TO REVIEW AND APPROVE IN WRITING
 ALL PRODUCT APPROVALS, INCLUDING THE FRENCH DOOR. SEC.
 107.3.4.1 CITY AMENDMENTS.
  
 7- A) NO FOUNDATION PLAN WAS PROVIDED. PROVIDE COMPLETE
 FOUNDATION PLAN SHOWING COMPLIANCE WITH SEC. R401.2 OF
 2010 FBC-RESIDENTIAL.
  
 B) ORIGINAL APPROVED PLANS WERE DESIGNED BASED ON THE
 SPECIFIC TYPE OF SOIL ENCOUNTERED IN THIS AREA AND
 BECAUSE THIS PROPERTY IS LOCATED IN FLOOD ZONE A5. NEW
 ENGINEER OF RECORD TO ACKNOWLEDGE IN WRITING THAT
 PROPOSED FOUNDATION DESIGN IS BASED ON THOSE SPECIFIC
 SOIL CONDITIONS. SEC. 107.2.1.3 CITY AMENDMENTS.
  
 8- PROVIDE COMPLETE FRAMING PLANS, SPECIFICATIONS AND
 DETAILS/SECTIONS FOR THE NEW TERRACE. NO STRUCTURAL
 INFORMATION WAS PROVIDED. SEC. R501.2 OF 2010
 FBC-RESIDENTIAL.
 ***NOTE: INCLUDE DETAILS AND SPECIFICATIONS FOR THE
 CEILING ASSEMBLY BELOW THE TERRACE.
  
 9- SCOPE OF WORK SUBMITTED WITH THIS REVISION INCLUDES
 A LOT MORE WORK THAN THE SPECIFIED ON THE ORIGINAL
 APPROVED PLANS. UPDATE VALUATION TO INCLUDE ALL LABOR,
 MATERIALS, CONTRACTOR'S OVERHEAD AND PROFIT AND ALL
 DESIGN PROFESSIONAL FEES AS REQUIRED BY SEC. 109.3 CITY
 AMENDMENTS. PROVIDE COPY OF SIGNED CONTRACT THAT
 INCLUDES ALL SPECIFIED WORK.
  
 *** PLEASE PROVIDE RESPONSE LETTER ADDRESSING EACH
 COMMENT TO EXPEDITE THE REVIEW PROCESS.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 (561)805-6712
 [email protected]

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2015-01-27 Cont ID  
Sent By skennedy Date 2015-01-27 Time 14:37 Rev Time 0.00
Received By skennedy Date 2015-01-27 Time 14:36 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2015-01-14 Cont ID  
Sent By skennedy Date 2015-01-14 Time 10:38 Rev Time 0.00
Received By skennedy Date 2015-01-14 Time 10:38 Sent To  
Notes
2015-01-14 10:52:041ST REVIEW: FBC 2010
  
 THE NEWLY ADDED OUTDOOR KITCHEN DOES NOT APPEAR TO
 COMPLY WITH THE FOLLOWING SECTIONS:
 NEC 210.52 (B) (3) - KITCHEN COUNTER TOP RECEPTACLES
 SHALL BE SUPPLIED BY NO FEWER THAN TWO SMALL APPLIANCE
 BRANCH CIRCUITS.
 NEC 210.52 (C) - KITCHEN COUNTER TOP RECEPTACLE SPACING
 (C) COUNTERTOPS. IN KITCHENS, PANTRIES, BREAKFAST
 ROOMS,DINING ROOMS, AND SIMILAR AREAS OF DWELLING
 UNITS, RECEPTACLE
 OUTLETS FOR COUNTERTOP SPACES SHALL BE INSTALLED IN
 ACCORDANCE WITH 210.52(C)(1) THROUGH (C)(5).
 REVISE ACCORDINGLY.
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-01-29 Cont ID  
Sent By jgomez Date 2015-01-29 Time 18:18 Rev Time 0.00
Received By jgomez Date 2015-01-15 Time   Sent To  
Notes
2015-01-21 08:53:10R10
  
2015-01-16 10:53:33SENT TO ZONING BOX. JW

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-01-14 Cont ID  
Sent By skennedy Date 2015-01-14 Time 10:52 Rev Time 0.00
Received By skennedy Date 2014-12-31 Time 18:58 Sent To  
Notes
2014-12-31 18:58:11R01

Review Stop P PLUMBING
Rev No 1 Status P Date 2015-01-04 Cont ID  
Sent By JGOMEZ Date 2015-01-04 Time 08:51 Rev Time 0.00
Received By tklarge Date 2015-01-04 Time 08:27 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 3 Status P Date 2015-01-27 Cont ID  
Sent By sgraham Date 2015-01-27 Time 09:29 Rev Time 0.00
Received By sgraham Date 2015-01-27 Time 09:29 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status F Date 2015-01-16 Cont ID  
Sent By sgraham Date 2015-01-16 Time 12:56 Rev Time 0.00
Received By sgraham Date 2015-01-16 Time 12:56 Sent To  
Notes
2015-01-16 12:57:401// ZONING FAILED 2ND CHECKLISY
  
 1. PROVIDE TWO COPIES OF AN UP TO DATE SURVEY
 HIGHLIGHTING THE WALL AND ADDITION.

Review Stop Z ZONING
Rev No 1 Status F Date 2015-01-13 Cont ID  
Sent By SGRAHAM Date 2015-01-13 Time 14:21 Rev Time 0.00
Received By sgraham Date 2015-01-13 Time 14:21 Sent To  
Notes
2015-01-13 14:22:021/13/15 ZONING FAILED
  
 1. PROVIDE TWO UP TO DATE SURVEYS SHOWING LOCATION OF
 THE WALL AND THE ADDITION.