Plan Review Details - Permit 14120500
Plan Review Stops For Permit 14120500
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2015-04-02 Cont ID  
Sent By shill Date 2015-04-09 Time 19:41 Rev Time 0.00
Received By shill Date 2015-04-02 Time 19:41 Sent To  
Notes
2015-04-02 19:43:59****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 3RD REVIEW, SAME PLANS SUBMITTED; ONLY NEW INFORMATION
 IS AN ELEVATION CERTIFICATE.
  
 THE PROPOSED RENOVATION IS CONSIDERED A "SUBSTANTIAL
 IMPROVEMENT", SEE CITY OF WEST PALM BEACH MUNICIPAL
 CODE 94-546(B). SEE ALSO FBC 2010 RESIDENTIAL 322.
  
 1. SCOPE NOT CLEAR. PLANS FOR RENOVATION WERE
 SUBMITTED, BUT THIS IS BEING REVIEWED UNDER ANOTHER
 PERMIT. PLEASE REMOVE SHEETS RELATED TO CONSTRUCTION
 AND SUBMIT ONLY DEMO SHEETS.
  
 2. HOW WILL THE STRUCTURE BE KEPT SECURE IF WINDOWS ARE
 REMOVED? WINDOW REMOVAL WILL BE REMOVED FROM SCOPE OF
 WORK UNLESS CONTRACTOR ADDRESSES THIS ISSUE, FBC 107.
  
 3. PRIOR TO ISSUANCE OF A DEMO PERMIT, PLANS ARE TO
 INDICATE HOW THE STRUCTURE WILL BE BROUGHT INTO FULL
 NFIP COMPLIANCE.
  
 THE GARAGE MAY NEED TO BE RAISED OR VENTS INSTALLED.
 THIS APPLIES TO THE BREEZEWAY, DEPENDING ON WHETHER IT
 IS OPEN OR ENCLOSED.
  
 5. REGARDING THE ELEVATION CERTIFICATE - A
 "CONSTRUCTION DRAWINGS" ELEVATION CERTIFICATE IS
 REQUIRED WHICH PROPOSES HOW THE STRUCTURE WILL BE
 BROUGHT INTO COMPLIANCE:
  
 A7, BUILDING DIAGRAM 1 IS TO BE 1A (SLAB ON GRADE) OR
 1B (RAISED SLAB ON GRADE OR SLAB ON STEM WALL WITH
 FILL).
  
 A9, 400 SF GARAGE AREA IS NOT CONSISTENT WITH PLAN (733
 SF).
  
 B1, COMMUNITY NAME TO BE INCLUDED (CITY OF WEST PALM
 BEACH 120229).
  
 B4 SHOULD INCLUDE MAP NUMBER, ONLY PANEL NUMBER IS
 SHOWN (SHOULD BE 120229 0020).
  
 C1, "FINISHED CONSTRUCTION" WAS SUBMITTED. PROVIDE A
 "CONSTRUCTION DRAWINGS" ELEVATION CERTIFICATE SHOWING
 PROPOSED CONSTRUCTION.
  
 C2 IS BLANK, PROVIDE INFORMATION REGARDING BENCHMARK.
  
 C2A(B), AS HOUSE IS TWO STORY, THIS SHOULD NOT BE NA.
  
 C23A(D), AS THERE IS AN ATTACHED GARAGE, THIS SHOULD
 NOT BE NA.
  
 C2A(E), MECHANICAL EQUIPMENT IS TO BE RAISED TO 7.5' OR
 ABOVE.
  
 SECTION D, CHECK THE BOX INDICATING THAT COMMENTS ARE
 PROVIDED.
  
 THE CURRENT ELEVATION CERTIFICATE FORM SHOULD BE USED
 FOR THE NEW ELEVATION CERTIFICATE.
  
 SECOND PAGE OF ELEVATION CERTIFICATE IS MISSING. THERE
 IS A COMMENTS SECTION WHERE SURVEYOR CAN INDICATE
 SOURCE OF LAT/LONG, DESCRIBE MECHANICAL EQUIPMENT, AND
 ALSO CAN NOTE WHICH ITEMS ARE PROPOSED AS OPPOSED TO
 EXISITING.
  
 THREE ELEVATION CERTIFICATES ARE REQUIRED FOR ALL NEW
 CONSTRUCTION OR SUBSTANTIAL IMPROVEMENTS IN THE SPECIAL
 HAZARD FLOOD AREA - CONSTRUCTION DOCUMENTS (AT TIME OF
 PLAN REVIEW), BUILDING UNDER CONSTRUCTION (AT TIME OF
 FORM BOARD INSPECTION OR IN PROGRESS), AND FINISHED
 CONSTRUCTION (AFTER FINAL GRADE IS COMPLETE).
  
 6. ALL FLOOD PROVISIONS OF THE NFIP HAVE BEEN
 INCORPORATED INTO THE FLORIDA BUILDING CODE. PLEASE
 HAVE THE DESIGN PROFESSIONALS (ARCHITECT/ENGINEER) BE
 AWARE THAT THEY ARE REQUIRED TO DESIGN IN COMPLIANCE
 WITH THE FBC. PLEASE HAVE THEM CONTACT ME IF THEY NEED
 ASSISTANCE OR DIRECTION. PLEASE CONTACT ME IF YOU WISH
 TO FURTHER DISCUSS NFIP/FLORIDA BUILDING CODE
 REQUIREMENTS AND COMPLIANCE.
  
 APPLICABLE CODE REFERENCES: FBC 2010 RESIDENTIAL 322,
 FBC 2010 EXISTING BUILDING 601.3. NOTE THAT FBC 2010
 R322.1.4 (2) INCORPORATES FREEBOARD.
  
 7. APPLICATION INCLUDES DECKING AND MODIFICATION TO THE
 ELEVATOR SHAFT. IT IS DIFFICULT TO DETERMINE WHAT IS TO
 BE INCLUDED IN THE SCOPE OF THIS PERMIT SINCE ALL
 RENOVATION DOCUMENTS WERE SUBMITTED. PLANS ARE TO SHOW
 SCOPE OF WORK UNDER THIS PERMIT, FBC 107.
  
 PLEASE HAVE DESIGNERS AND SURVEYOR CALL ME TO DISCUSS
 IF THEY NEED ASSISTANCE IN UNDERSTANDING THE COMMENTS
 AND DETERMINING THE BEST WAY TO SHOW COMPLIANCE ON THE
 PLANS.
  
  
  
  
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2015-03-07 Cont ID  
Sent By shill Date 2015-03-07 Time 18:09 Rev Time 0.00
Received By shill Date 2015-03-07 Time 18:08 Sent To P
Notes
2015-03-07 18:09:23****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. SCOPE NOT CLEAR. PLANS FOR RENOVATION WERE
 SUBMITTED, BUT THIS IS BEING REVIEWED UNDER ANOTHER
 PERMIT. PLEASE REMOVE SHEETS RELATED TO CONSTRUCTION
 AND SUBMIT ONLY DEMO SHEETS. MECHANICAL SHEETS NOT
 REVIEWED AT THIS TIME AS THEY ARE BEING REVIEWED UNDER
 ANOTHER PERMIT.
  
 2. HOW WILL THE STRUCTURE BE KEPT SECURE IF WINDOWS ARE
 REMOVED? WINDOW REMOVAL WILL BE REMOVED FROM SCOPE OF
 WORK UNLESS CONTRACTOR ADDRESSES THIS ISSUE, FBC 107.
  
 3. ELEVATION CERTIFICATE WAS NOT PROVIDED, AND THERE
 ARE CONFLICTING ELEVATIONS ON THE PLAN. THIS PERMIT
 WILL NOT BE ISSUED WITHOUT AN ELEVATION CERTIFICATE.
  
 4. PRIOR TO ISSUANCE OF A DEMO PERMIT, PLANS ARE TO
 INDICATE HOW THE STRUCTURE WILL BE BROUGHT INTO FULL
 COMPLIANCE. FLOOD VENTS MAY BE REQUIRED IN THE CRAWL
 SPACE. THE GARAGE MAY NEED TO BE RAISED OR VENTS
 INSTALLED. THIS APPLIES TO THE WALKWAY, DEPENDING ON
 WHETHER IT IS OPEN OR ENCLOSED. THE FIRST STEP IS A
 SIGNED AND SEALED ELEVATION CERTIFICATE WITH
 PHOTOGRAPHS OF ALL SIDES OF THE STRUCTURE(S). A
 COMPLETE REVIEW CANNOT BE PERFORMED WITHOUT THIS
 INFORMATION.
  
 FOR YOUR CONVENIENCE, NFIP REVIEW:
  
 ****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. AS THE PROPOSED RENOVATION CONSTITUTES A SUBSTANTIAL
 IMPROVEMENT, PROVIDE A COPY OF THE ELEVATION
 CERTIFICATE FOR THIS STRUCTURE. THIS MAY BE SENT VIA
 EMAIL FOR PRELIMINARY REVIEW.
  
 BASED ON THE SITE PLAN, IT APPEARS THAT:
  
 THE HOUSE FINISHED FLOOR IS IN COMPLIANCE (OVER 7.5')
  
 NO INFORMATION PROVIDED REGARDING MECHANICAL EQUIPMENT
 (MUST BE OVER 7.5')
  
 THE GARAGE FLOOR IS AT 6.68'. THIS DOES NOT COMPLY WITH
 THE MINIMUM 7.5'). ARE FLOOD VENTS INSTALLED IN THE
 GARAGE? IS THE GARAGE TO BE RAISED? SHEET A2 SHOWS
 GARAGE ELEVATION AS 10'1" AND AS 7'. PROPOSED
 CONSTRUCTION NOT CLEAR.
  
 IS THE BREEZEWAY ENCLOSED? WILL THIS BE RAISED?
  
 THE ELEVATION CERTIFICATE SHOULD PROVIDE THE
 INFORMATION REQUIRED TO DETERMINE ACTIONS WHICH WILL BE
 REQUIRED FOR ISSUANCE.
  
 PLEASE PROVIDE A CURRENT ELEVATION CERTIFICATE WHICH
 SHOWS EXISTING CONDITIONS.
  
 THREE ADDITIONAL ELEVATION CERTIFICATES WILL BE
 REQUIRED:
  
 CONSTRUCTION DOCUMENTS (PLEASE PROVIDE AT THIS TIME,
 SHOWS ELEVATIONS PROPOSED)
 BUILDING UNDER CONSTRUCTION (WILL BE REQUIRED AT
 INSPECTION)
 FINISHED CONSTRUCTION (WILL BE REQUIRED PRIOR TO
 CERTIFICATE OF COMPLETION, AFTER FINISHED GRADE AND ALL
 MECHANICAL EQUIPMENT HAS BEEN INSTALLED)
  
 2. DOCUMENTS PREPARED BY AN ARCHITECT AND SUBMITTED FOR
 PUBLIC RECORD ARE TO BE SIGNED, SEALED, DATED ORIGINALS
 FS 481.
  
  
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2014-12-15 Cont ID  
Sent By shill Date 2014-12-15 Time 11:19 Rev Time 0.00
Received By shill Date 2014-12-15 Time 11:19 Sent To E
Notes
2014-12-15 11:19:33SEE REVIEW UNDER NFIP STOP
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2015-03-03 Cont ID  
Sent By dhayes Date 2015-03-03 Time 08:30 Rev Time 0.00
Received By dhayes Date 2015-03-03 Time 08:30 Sent To  
Notes
2015-03-03 08:34:28EC MARK GALLAGHER INC. ON BOARD NOW TO ACCEPT
 RESPONSABILITY OF ELECTRICAL DEMOLITION.

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2014-12-16 Cont ID  
Sent By dhayes Date 2014-12-16 Time 08:20 Rev Time 0.00
Received By dhayes Date 2014-12-16 Time 08:20 Sent To  
Notes
2014-12-16 09:23:2212/16/2014
 PROJECT: FARINO RESIDENCE
 PERMIT#: 14120500
 CODE: 2008 EDITION OF THE NEC, 2010 EDITION OF THE FBC
 ,2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1,
 ADMINISTRATION, 2012 FBC SUPPLEMENTS.
 1ST ELECTRICAL PLAN REVIEW
 ACTION: DENIED.
  
 FBC-WPB AMENDMENTS 107.3.5
 NO ELECTRICAL PLANS, DETAILS OR SPECIFICATIONS
 PROVIDED. PROVIDE THE FOLLOWING FOR MINIMUM PLAN REVIEW
 CRITERIA:
  
 1) PROVIDE DETAILS FOR THE DEMOLITION PLAN TO INDICATE
 THE FOLLOWING:
 A. THE LOCATION OF THE ELECTRICAL SERVICE, ASSOCIATED
 DISCONNECTS AND PANELS.
 B. HOW THE ELECTRICAL DEMOLITION IS PROPOSED TO TAKE
 PLACE. SUCH AS WHAT ELEMENTS ARE EXISTING TO REMAIN AND
 WHAT IS TO BE REMOVED.
 C. FOR THOSE ELECTRICAL ELEMENTS PROPOSED TO BE
 REMOVED, INDICATE THE LOCATION THAT THE CIRCUIT OR
 FEEDER IS PROPOSED TO TERMINATE.
  
 2) PROVIDE DETAILS FOR THE NEW CONSTRUCTION TO INDICATE
 THE FOLLOWING:
 A. A DETAILED ELECTRICAL SERVICE RISER TO INCLUDE A
 GROUNDING ELECTRODE SYSTEM, THE UTILITY METERING
 DEVICE(S) SERVICE DISCONNECT(S), PANEL(S), AND ALL
 CONDUIT AND WIRE SIZES FOR SERVICE ENTRANCE AND
 FEEDERS. NEC 215.5
 B. A COMPLETE DETAILED LOAD CALCULATION. NEC 220
 C. EVERY CIRCUIT AND CIRCUIT MODIFICATION SHALL BE
 LEGIBLY IDENTIFIED AS TO ITS CLEAR, EVIDENT, AND
 SPECIFIC PURPOSE OR USE. NEC 408.4
 D. PROVIDE A COMPLETE FLOOR PLAN INDICATING ALL OUTLETS
 AND LIGHTING AS REQUIRED BY THE 2008 EDITION OF THE
 NATIONAL ELECTRICAL CODE AND THE 2010 EDITION OF THE
 FBC 107.3.5, NEC 210.52
 E. ALL CIRCUITS NUMBERS IN THE PANEL DIRECTORIES TO BE
 INDICATED ON THE FLLOOR PLAN. FBC-WPB AMENDMENTS
 107.3.5
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. SEE LINK:
 HTTP://WPB.ORG/DEVELOPMENT/WP-CONTENT/UPLOADS/SITES/33/
 2013/09/APPLICATION_RESUBMITTAL_FORM_04132010.PDF
  
 ADDITIONALLY, IT IS REQUIRED TO INSERT THE CORRECTED
 PAGES INTO THE DENIED SUBMITTAL PACKAGE. VOID THE
 PREVIOUSLY REVIEWED SHEETS AND LEAVE FOR COMPARATIVE
 REVIEW.
  
 DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421,
 561-805-6717 OR [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2015-04-09 Cont ID  
Sent By shill Date 2015-04-09 Time 18:48 Rev Time 0.00
Received By shill Date 2015-03-24 Time 09:07 Sent To  
Notes
2015-03-25 09:08:14RE-SUBMITTAL SENT TO SAMANTHA HILL FOR REVIEW. JG.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-04-10 Cont ID  
Sent By shill Date 2015-04-10 Time 07:10 Rev Time 0.00
Received By shill Date 2015-02-10 Time 13:27 Sent To  
Notes
2015-03-10 10:33:033/10 TO JG DESK FOR PLUMBING REVIEW
  
2015-02-11 13:37:23CALLED CONTRACTOR TO COME IN TO CHANGE OUT DENIED
 SHEETS AND PROVIDE TWO COMPLETE SETS OF CORRECTED
 PLANS.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-12-16 Cont ID  
Sent By dhayes Date 2014-12-16 Time 08:20 Rev Time 0.00
Received By dhayes Date 2014-12-15 Time 11:19 Sent To  
Notes
2014-12-15 11:20:02TO DAVID HAYES DESK
  

Review Stop NFIP NFIP REVIEW ACTIVITY
Rev No 3 Status F Date 2015-04-09 Cont ID  
Sent By shill Date 2015-04-09 Time 18:42 Rev Time 0.00
Received By shill Date 2015-04-09 Time 18:42 Sent To  
Notes
2015-04-09 18:42:41SEE BUILDING COMMENTS
  

Review Stop NFIP NFIP REVIEW ACTIVITY
Rev No 2 Status F Date 2015-03-07 Cont ID  
Sent By shill Date 2015-03-07 Time 18:09 Rev Time 0.00
Received By shill Date 2015-03-07 Time 18:09 Sent To  
Notes
2015-03-07 18:10:27SEE PREVIOUS REVIEW
 NO ELEVATION CERTIFICATE PROVIDED
  
 OLD SHEETS WERE REMOVED FROM PACKAGE. IT IS DIFFICULT
 TO DO A REVIEW WITHOUT THE OLD SHEETS FOR REFERENCE.
  

Review Stop NFIP NFIP REVIEW ACTIVITY
Rev No 1 Status F Date 2014-12-15 Cont ID  
Sent By shill Date 2014-12-15 Time 11:06 Rev Time 0.00
Received By shill Date 2014-12-15 Time 11:06 Sent To  
Notes
2014-12-15 11:19:09****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. AS THE PROPOSED RENOVATION CONSTITUTES A SUBSTANTIAL
 IMPROVEMENT, PROVIDE A COPY OF THE ELEVATION
 CERTIFICATE FOR THIS STRUCTURE. THIS MAY BE SENT VIA
 EMAIL FOR PRELIMINARY REVIEW.
  
 BASED ON THE SITE PLAN, IT APPEARS THAT:
  
 THE HOUSE FINISHED FLOOR IS IN COMPLIANCE (OVER 7.5')
  
 NO INFORMATION PROVIDED REGARDING MECHANICAL EQUIPMENT
 (MUST BE OVER 7.5')
  
 THE GARAGE FLOOR IS AT 6.68'. THIS DOES NOT COMPLY WITH
 THE MINIMUM 7.5'). ARE FLOOD VENTS INSTALLED IN THE
 GARAGE? IS THE GARAGE TO BE RAISED? SHEET A2 SHOWS
 GARAGE ELEVATION AS 10'1" AND AS 7'. PROPOSED
 CONSTRUCTION NOT CLEAR.
  
 IS THE BREEZEWAY ENCLOSED? WILL THIS BE RAISED?
  
 THE ELEVATION CERTIFICATE SHOULD PROVIDE THE
 INFORMATION REQUIRED TO DETERMINE ACTIONS WHICH WILL BE
 REQUIRED FOR ISSUANCE.
  
 PLEASE PROVIDE A CURRENT ELEVATION CERTIFICATE WHICH
 SHOWS EXISTING CONDITIONS.
  
 THREE ADDITIONAL ELEVATION CERTIFICATES WILL BE
 REQUIRED:
  
 CONSTRUCTION DOCUMENTS (PLEASE PROVIDE AT THIS TIME,
 SHOWS ELEVATIONS PROPOSED)
 BUILDING UNDER CONSTRUCTION (WILL BE REQUIRED AT
 INSPECTION)
 FINISHED CONSTRUCTION (WILL BE REQUIRED PRIOR TO
 CERTIFICATE OF COMPLETION, AFTER FINISHED GRADE AND ALL
 MECHANICAL EQUIPMENT HAS BEEN INSTALLED)
  
 2. DOCUMENTS PREPARED BY AN ARCHITECT AND SUBMITTED FOR
 PUBLIC RECORD ARE TO BE SIGNED, SEALED, DATED ORIGINALS
 FS 481.
  
  
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2015-03-10 Cont ID  
Sent By tklarge Date 2015-03-10 Time 10:46 Rev Time 0.00
Received By tklarge Date 2015-03-10 Time 10:46 Sent To  
Notes
2015-03-10 10:47:36!) SEE BUILDING PLAN REVIEW COMMENTS.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  