| Plan Review Stops For Permit 14120164 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2014-12-17 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2014-12-17 |
Time |
09:54 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2014-12-17 |
Time |
09:54 |
Sent To |
|
|
| Notes |
| 2014-12-17 09:55:16 | PARKING ACCESSIBILITY SHEET C-4. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2014-12-31 |
|
|
Cont ID |
|
| Sent By |
dhayes |
Date |
2014-12-31 |
Time |
13:18 |
Rev Time |
0.00 |
| Received By |
dhayes |
Date |
2014-12-31 |
Time |
13:18 |
Sent To |
|
|
| Notes |
| 2014-12-31 13:40:08 | 12/31/2014 | | | PROJECT: DUNKIN DONUTS | | | PERMIT#: 14120164 | | | CODE: 2008 EDITION OF THE NEC, 2010 EDITION OF THE FBC | | | ,2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1, | | | ADMINISTRATION, 2012 FBC SUPPLEMENTS. | | | 2NDELECTRICAL PLAN REVIEW | | | ACTION: APPROVED WITH EXCEPTION | | | | | | 1) 505.2.4 EXTERIOR LIGHTING CONTROLS. | | | PROVIDE AUTOMATED CONTROLS CAPABLE OF TURNING OFF | | | EXTERIOR LIGHTING WHEN SUFFICIENT DAYLIGHT IS AVAILABLE | | | OR WHEN THE LIGHTING IS NOT REQUIRED DURING NIGHTTIME | | | HOURS. LIGHTING NOT DESIGNATED FOR DUSK-TO-DAWN | | | OPERATION SHALL BE CONTROLLED BY EITHER A COMBINATION | | | OF A PHOTOSENSOR AND A TIME SWITCH, OR AN ASTRONOMICAL | | | TIME SWITCH. A TIMER IS INDICATED ON THE PLAN BUT IT | | | MUST BE VERIFIED TO MEET THE CRITERIA OF THE FBC-ENERGY | | | 505.2 | | | | | | 2) 2010 FBC-BUILDING SECTION 1609 | | | PROVIDE ENGINEERED WIND LOAD CALCULATIONS FOR ALL NEW | | | LIGHT POLES INCLUDING ATTACHED LUMINAIRE INDICATING | | | COMPLIANCE WITH THE FBC 1609. PRIOR TO FINAL | | | INSPECTION. | | | | | | DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, | | | 561-805-6717 OR [email protected] |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2014-12-05 |
|
|
Cont ID |
|
| Sent By |
dhayes |
Date |
2014-12-05 |
Time |
13:50 |
Rev Time |
0.00 |
| Received By |
dhayes |
Date |
2014-12-05 |
Time |
08:06 |
Sent To |
|
|
| Notes |
| 2014-12-05 13:50:40 | 12/5/2014 | | | PROJECT: DUNKIN DONUTS | | | PERMIT#: 14120164 | | | CODE: 2008 EDITION OF THE NEC, 2010 EDITION OF THE FBC | | | ,2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1, | | | ADMINISTRATION, 2012 FBC SUPPLEMENTS. | | | 1ST ELECTRICAL PLAN REVIEW | | | ACTION: DENIED | | | | | | 1) 2010 WPB AMENDMENTS TO FBC 107.2.1 | | | CONSTRUCTION DOCUMENTS SHALL BE OF SUFFICIENT CLARITY | | | TO INDICATE IN DETAIL THE LOCATION, NATURE AND EXTENT | | | OF THE WORK PROPOSED. PROVIDE A LIGHTING CIRCUITRY | | | DIAGRAM INDIACTING THE WIRING METHOD, THE ELECTRICAL | | | PANEL USED PLUS IT'S LOCATION, THE CIRCUIT NUMBER(S) | | | USED AND SHOWN ON THE PLAN, THE SIZE AND TYPE OF | | | CONDUCTORS PROPOSED. | | | | | | 2) 505.2.4 EXTERIOR LIGHTING CONTROLS. | | | PROVIDE AUTOMATED CONTROLS CAPABLE OF TURNING OFF | | | EXTERIOR LIGHTING WHEN SUFFICIENT DAYLIGHT IS AVAILABLE | | | OR WHEN THE LIGHTING IS NOT REQUIRED DURING NIGHTTIME | | | HOURS. LIGHTING NOT DESIGNATED FOR DUSK-TO-DAWN | | | OPERATION SHALL BE CONTROLLED BY EITHER A COMBINATION | | | OF A PHOTOSENSOR AND A TIME SWITCH, OR AN ASTRONOMICAL | | | TIME SWITCH. | | | | | | 3) 2010 FBC-BUILDING SECTION 1609 | | | PROVIDE ENGINEERED WIND LOAD CALCULATIONS FOR ALL NEW | | | LIGHT POLES INCLUDING ATTACHED LUMINAIRE INDICATING | | | COMPLIANCE WITH THE FBC 1609. | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. SEE LINK: | | | HTTP://WPB.ORG/DEVELOPMENT/WP-CONTENT/UPLOADS/SITES/33/ | | | 2013/09/APPLICATION_RESUBMITTAL_FORM_04132010.PDF | | | | | | ADDITIONALLY, IT IS REQUIRED TO INSERT THE CORRECTED | | | PAGES INTO THE DENIED SUBMITTAL PACKAGE. VOID THE | | | PREVIOUSLY REVIEWED SHEETS AND LEAVE FOR COMPARATIVE | | | REVIEW. | | | | | | DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, | | | 561-805-6717 OR [email protected] | | | |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
2 |
Status |
P |
Date |
2015-02-10 |
|
|
Cont ID |
|
| Sent By |
cranford |
Date |
2015-02-10 |
Time |
13:55 |
Rev Time |
0.00 |
| Received By |
cranford |
Date |
2015-02-10 |
Time |
13:55 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
P |
Date |
2014-12-18 |
|
|
Cont ID |
|
| Sent By |
cranford |
Date |
2014-12-18 |
Time |
13:31 |
Rev Time |
0.00 |
| Received By |
cranford |
Date |
2014-12-18 |
Time |
13:26 |
Sent To |
I |
|
| Notes |
| 2014-12-18 13:31:35 | ALSO REVIEWED UNDER ENGINEERING DEVELOPMENT APPROVAL | | | E14120022 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2015-03-04 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
2015-02-13 |
Time |
|
Sent To |
|
|
| Notes |
| 2015-02-18 08:28:50 | INCOMING SENT TO ZONING BOX. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2015-02-10 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
2015-02-10 |
Time |
13:58 |
Rev Time |
0.00 |
| Received By |
cranford |
Date |
2015-01-20 |
Time |
15:57 |
Sent To |
Z |
|
| Notes |
| 2015-01-20 16:03:06 | INCOMING SENT TO ZONING. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2014-12-31 |
|
|
Cont ID |
|
| Sent By |
dhayes |
Date |
2014-12-31 |
Time |
13:20 |
Rev Time |
0.00 |
| Received By |
dhayes |
Date |
2014-12-23 |
Time |
|
Sent To |
Z |
|
| Notes |
| 2014-12-23 16:52:55 | INCOMING SENT TO ZONING. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2014-12-18 |
|
|
Cont ID |
|
| Sent By |
cranford |
Date |
2014-12-18 |
Time |
13:31 |
Rev Time |
0.00 |
| Received By |
cranford |
Date |
2014-12-04 |
Time |
08:19 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
4 |
Status |
P |
Date |
2015-02-26 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
2015-02-26 |
Time |
15:29 |
Rev Time |
0.00 |
| Received By |
llouie |
Date |
2015-02-18 |
Time |
15:29 |
Sent To |
E |
|
| Notes |
| 2015-02-26 15:33:11 | ** ZONING PROVISIO ** | | | | | | 1.) THE NEW LIGHT POLE FIXTURE AT THE NORTHEAST PORTION | | | OF THE PROPERTY SHALL BE SETBACK 5 FT. FROM THE | | | PROPERTY LINE (SEE RED MARKING IN PLANS). | | | | | | (REFERENCE: ZBA CASE NO. 3307) | | | | | | NOTE: STATUS CHANGE FROM "F" TO "P" WILL OCCUR ONCE A | | | LANDSCAPE PERMIT, SHOWING NO CONFLICT WITH LOCATION OF | | | LIGHT POLE FIXTURES, HAS BEEN SUBMITTED.) | | | | | | CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE | | | QUESTIONS. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
F |
Date |
2015-01-23 |
|
|
Cont ID |
|
| Sent By |
cranford |
Date |
2015-02-10 |
Time |
13:58 |
Rev Time |
0.00 |
| Received By |
llouie |
Date |
2015-01-23 |
Time |
15:48 |
Sent To |
|
|
| Notes |
| 2015-01-23 15:52:00 | ** FAILED ** | | | | | | PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE | | | COMMENTS IN WRITING AND/OR ON THE PLANS WHERE | | | APPLICABLE: | | | | | | 1.) REPEAT COMMENT 12/15/14 AND 12/24/14: ANY OPERATION | | | OR ACTIVITY PRODUCING GLARE SHALL BE CONDUCTED SO THAT | | | DIRECT OR INDIRECT LIGHT FROM THE SOURCE SHALL NOT | | | CAUSE ILLUMINATION IN EXCESS OF 0.5 FOOT CANDLES WHEN | | | MEASURED IN A RESIDENTIAL DISTRICT. SUBMITTED PLAN DOES | | | NOT COMPLY WITH THIS ZLDR STANDARD. [ZLDR S.94-310(D)] | | | | | | 2.) REPEAT COMMENT 12/15/14 AND 12/24/14: LANDSCAPING | | | IMPROVEMENTS (AS REQUIRED BY THE CONDITIONED IN THE | | | FINAL ORDER FOR ZBA CASE NO. 3307) SHALL BE SUBMITTED | | | AND REVIEWED AS A SEPARATE PERMIT PRIOR TO THE APPROVAL | | | OF THIS PERMIT. THERE SHALL BE NO CONFLICT WITH THE | | | LOCATION OF THE PROPOSED LIGHT FIXTURES. | | | | | | PLEASE NOTE THAT ANY CHANGES ON THE RESUBMITTED PLANS | | | MAY RESULT IN ADDITIONAL COMMENTS. CONTACT LINDA LOUIE | | | @ (561) 822-1458 IF YOU HAVE QUESTIONS. | | | | | | NOTE: | | | | | | 1/23/15 - LANDSCAPE PLANS SUBMITTED WITH PERMIT | | | #14120164 RE-SUBMITTAL. CALLED AND SPOKE TO MIKE | | | VENTURA, CONTRACTOR FOR THE PROJECT. INFORMED MR. | | | VENTURA THAT A SEPARATE LANDSCAPE PERMIT IS REQUIRED | | | FOR THE LANDSCAPING. LIGHTING ISSUES REMAIN | | | OUTSTANDING. LANDSCAPE PLANS TRAVELING WITH PERMIT | | | #14120164 UNTIL CONTRACTOR CAN PICK-UP PLANS FOR NEW | | | PERMIT SUBMITTAL. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
2014-12-24 |
|
|
Cont ID |
|
| Sent By |
dhayes |
Date |
2014-12-31 |
Time |
13:20 |
Rev Time |
0.00 |
| Received By |
llouie |
Date |
2014-12-24 |
Time |
12:32 |
Sent To |
E |
|
| Notes |
| 2014-12-24 12:33:10 | ** FAILED ** | | | | | | PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE | | | COMMENTS IN WRITING AND/OR ON THE PLANS WHERE | | | APPLICABLE: | | | | | | 1.) REPEAT COMMENT 12/15/14: ANY OPERATION OR ACTIVITY | | | PRODUCING GLARE SHALL BE CONDUCTED SO THAT DIRECT OR | | | INDIRECT LIGHT FROM THE SOURCE SHALL NOT CAUSE | | | ILLUMINATION IN EXCESS OF 0.5 FOOT CANDLES WHEN | | | MEASURED IN A RESIDENTIAL DISTRICT. SUBMITTED PLAN DOES | | | NOT COMPLY WITH THIS ZLDR STANDARD. [ZLDR S.94-310(D)] | | | | | | 2.) REPEAT COMMENT 12/15/14: LANDSCAPING IMPROVEMENTS | | | (AS REQUIRED BY THE CONDITIONED IN THE FINAL ORDER FOR | | | ZBA CASE NO. 3307) SHALL BE SUBMITTED AND REVIEWED AS A | | | SEPARATE PERMIT PRIOR TO THE APPROVAL OF THIS PERMIT. | | | THERE SHALL BE NO CONFLICT WITH THE LOCATION OF THE | | | PROPOSED LIGHT FIXTURES. | | | | | | PLEASE NOTE THAT ANY CHANGES ON THE RESUBMITTED PLANS | | | MAY RESULT IN ADDITIONAL COMMENTS. CONTACT LINDA LOUIE | | | @ (561) 822-1458 IF YOU HAVE QUESTIONS. | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2014-12-15 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
2014-12-15 |
Time |
13:38 |
Rev Time |
0.00 |
| Received By |
llouie |
Date |
2014-12-15 |
Time |
13:38 |
Sent To |
|
|
| Notes |
| 2014-12-15 13:44:18 | ** FAILED ** | | | | | | PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE | | | COMMENTS IN WRITING AND/OR ON THE PLANS WHERE | | | APPLICABLE: | | | | | | 1.) ALL OUTDOOR LIGHTING SHALL BE SHIELDED TO REDUCE | | | GLARE AND SHALL BE ARRANGED TO REFLECT LIGHT OR GLARE | | | AWAY FROM ALL RESIDENTIAL DISTRICTS, ADJACENT | | | RESIDENCES, OR PUBLIC THROUGHFARES. [ZLDR S.94-309(A)] | | | | | | 2.) ANY OPERATION OR ACTIVITY PRODUCING GLARE SHALL BE | | | CONDUCTED SO THAT DIRECT OR INDIRECT LIGHT FROM THE | | | SOURCE SHALL NOT CAUSE ILLUMINATION IN EXCESS OF 0.5 | | | FOOT CANDLES WHEN MEASURED IN A RESIDENTIAL DISTRICT. | | | SUBMITTED PLAN DOES NOT COMPLY WITH THIS ZLDR STANDARD. | | | [ZLDR S.94-310(D)] | | | | | | 3.) LANDSCAPING IMPROVEMENTS (AS REQUIRED BY THE | | | CONDITIONED IN THE FINAL ORDER FOR ZBA CASE NO. 3307) | | | SHALL BE SUBMITTED AND REVIEWED AS A SEPARATE PERMIT. | | | THERE SHALL BE NO CONFLICT WITH THE LOCATION OF THE | | | PROPOSED LIGHT FIXTURES. | | | | | | PLEASE NOTE THAT ANY CHANGES ON THE RESUBMITTED PLANS | | | MAY RESULT IN ADDITIONAL COMMENTS. CONTACT LINDA LOUIE | | | @ (561) 822-1458 IF YOU HAVE QUESTIONS. | | | | | 2014-12-11 10:34:39 | 12/11/14 |
|
|