Plan Review Details - Permit 14110821
Plan Review Stops For Permit 14110821
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2015-01-03 Cont ID  
Sent By skennedy Date 2015-01-03 Time 14:24 Rev Time 0.00
Received By skennedy Date 2015-01-03 Time 14:23 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2014-12-10 Cont ID  
Sent By skennedy Date 2014-12-10 Time 07:00 Rev Time 0.00
Received By skennedy Date 2014-12-10 Time 07:00 Sent To  
Notes
2014-12-10 07:15:101ST REVIEW: FBC 2010
  
 THE PROPOSED IMPROVEMENT IS LOCATED WITHIN AN AE FLOOD
 HAZARD ZONE AND IS A SUBSTANTIAL IMPROVEMENT: PER FBC
 1612.2 DEFINITIONS AS FOLLOWS:
 SUBSTANTIAL IMPROVEMENT. ANY REPAIR, RECONSTRUCTION,
 REHABILITATION, ADDITION OR IMPROVEMENT OF A BUILDING
 OR STRUCTURE, THE COST OF WHICH EQUALS OR EXCEEDS 50
 PERCENT OF THE MARKET VALUE OF THE STRUCTURE BEFORE THE
 IMPROVEMENT OR REPAIR IS STARTED. IF THE STRUCTURE HAS
 SUSTAINED SUBSTANTIAL DAMAGE, ANY REPAIRS ARE
 CONSIDERED SUBSTANTIAL IMPROVEMENT REGARDLESS OF THE
 ACTUAL REPAIR WORK PERFORMED.
  
 ACCORDINGLY, DESIGN AND CONSTRUCTION MUST BE AS
 FOLLOWS: FBC 1612.4 DESIGN AND CONSTRUCTION.
 THE DESIGN AND CONSTRUCTION OF BUILDINGS AND STRUCTURES
 LOCATED IN FLOOD HAZARD AREAS, INCLUDING FLOOD HAZARD
 AREAS SUBJECT TO HIGH-VELOCITY WAVE ACTION, SHALL BE IN
 ACCORDANCE WITH CHAPTER 5 OF ASCE 7 AND WITH ASCE 24.
  
 ADDITIONALLY, DOCUMENTS ARE REQUIRED AS FOLLOWS: 1612.5
 FLOOD HAZARD DOCUMENTATION.
 THE FOLLOWING DOCUMENTATION SHALL BE PREPARED AND
 SEALED BY A REGISTERED DESIGN PROFESSIONAL AND SHALL BE
 SUBMITTED TO THE BUILDING OFFICIAL:
 1. FOR CONSTRUCTION IN FLOOD HAZARD AREAS NOT SUBJECT
 TO HIGH-VELOCITY WAVE ACTION:
 1.1 THE ELEVATION OF THE LOWEST FLOOR, INCLUDING
 BASEMENT, AS REQUIRED BY THE FOUNDATION INSPECTION AND
 THE FINAL INSPECTION IN SECTION 110.3.
 1.3. FOR DRY FLOODPROOFED NONRESIDENTIAL BUILDINGS,
 CONSTRUCTION DOCUMENTS SHALL INCLUDE A STATEMENT THAT
 THE DRY FLOODPROOFING IS DESIGNED IN ACCORDANCE WITH
 ASCE 24.
  
 DESIGN DOCUMENTS SHOULD BE REVISED TO REFLECT THE
 FOREGOING.
 PLEASE PROVIDE FLOOD ELEVATIONS AND SURVEY AS REQUESTED
 IN ZONING COMMENT.
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-01-03 Cont ID  
Sent By skennedy Date 2015-01-03 Time 14:24 Rev Time 0.00
Received By skennedy Date 2014-12-30 Time 18:22 Sent To  
Notes
2015-01-02 16:13:13TO SAK DESK
  
2014-12-30 18:22:50* * * EXPEDITED * * *
 TO ZONING
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-12-10 Cont ID  
Sent By skennedy Date 2014-12-10 Time 07:15 Rev Time 0.00
Received By skennedy Date 2014-11-21 Time 08:21 Sent To  
Notes
2014-11-22 08:22:29SENT TO ZONING

Review Stop Z ZONING
Rev No 2 Status P Date 2014-12-31 Cont ID  
Sent By sgraham Date 2014-12-31 Time 10:25 Rev Time 0.00
Received By sgraham Date 2014-12-31 Time 10:25 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2014-11-24 Cont ID  
Sent By sgraham Date 2014-11-24 Time 15:17 Rev Time 0.00
Received By sgraham Date 2014-11-24 Time 15:17 Sent To B
Notes
2014-11-24 15:18:3811/29/14 ZONING FAILED
  
 1. PROVIDE TWO COPIES OF SITE PLAN SHOWING OF THE WORK.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved