| Plan Review Stops For Permit 14110356 |
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2014-11-13 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2014-11-13 |
Time |
07:51 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2014-11-10 |
Time |
06:44 |
Sent To |
|
|
| Notes |
| 2014-11-07 13:43:53 | <5000 PLUMB |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2014-11-13 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2014-11-13 |
Time |
07:50 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2014-11-12 |
Time |
08:03 |
Sent To |
|
|
| Notes |
| 2014-11-12 08:18:41 | 1) A MINIMUM OF A DOUBLE CHECK VALVE ASSEMBLY IS | | | REQUIRED ON THE WATER LINE PER CITY OF WPB ORD. SEC. | | | 90-33 AND THE CITY'S CROSS CONNECTION CONTROL MANUAL. | | | THE N36 AND THE SWING CHECK VALVE DOES NOT MEET THIS | | | REQUIREMENT. | | | 2) SUBMIT DOCUMENTATION ON THE TYPE OF BACKFLOW DEVICE | | | TO BE INSTALLED ON THE 1" FRESH WATER FILL LINE TO THE | | | COLLECTOR TANK. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | |
|
|
|