Plan Review Details - Permit 14110244
Plan Review Stops For Permit 14110244
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status N Date 2014-11-18 Cont ID  
Sent By skennedy Date 2014-11-18 Time 15:37 Rev Time 0.00
Received By skennedy Date 2014-11-18 Time 15:37 Sent To  
Notes
2014-11-18 15:39:181ST REVIEW: FBC 2010
  
 THE QUALITY OF THE PLAN IS NOT ACCEPTABLE. FBC
 107.2.1.4 QUALITY OF BUILDING PLANS. BUILDING PLANS
 SHALL BE DRAWN TO A MINIMUM 1/8 INCH SCALE UPON
 SUBSTANTIAL PAPER, CLOTH OR OTHER ACCEPTABLE MEDIUM.
 THIS POLICY MAY INCLUDE SUCH THINGS AS MINIMUM SIZE,
 SHAPE, CONTRAST, CLARITY, OR OTHER ITEMS RELATED TO
 RECORDS MANAGEMENT.
  
 PROVIDE A SOFFIT DETAIL. FBC 107. -
  
 THERE IS ADDED VALUE OF WORK. PROVIDE ESTIMATE OF ADDED
 VALUE AND AND PAY FEE. FBC 109.3 BUILDING PERMIT
 VALUATION. FOR PERMITTING PURPOSES, VALUATION OF
 BUILDINGS AND SYSTEMS SHALL BE TOTAL REPLACEMENT VALUE
 TO INCLUDE STRUCTURAL, ELECTRIC, PLUMBING, MECHANICAL,
 INTERIOR FINISH, RELATIVE SITE WORK, ARCHITECTURAL AND
 DESIGN FEES, MARKETING COSTS, OVERHEAD AND PROFIT;
 EXCLUDING ONLY LAND VALUE. VALUATION REFERENCES MAY
 INCLUDE THE LATEST PUBLISHED DATA OF NATIONAL
 CONSTRUCTION COST ANALYSIS SERVICES (MARSHALL-SWIFT,
 MEANS, ETC.), AS PUBLISHED BY INTERNATIONAL CODE
 CONGRESS. FINAL BUILDING PERMIT VALUATION SHALL BE SET
 BY THE BUILDING OFFICIAL.
  
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2015-06-16 Cont ID  
Sent By dhayes Date 2015-06-16 Time 13:27 Rev Time 0.00
Received By dhayes Date 2015-06-16 Time 13:27 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2014-11-18 Cont ID  
Sent By sciard Date 2014-11-18 Time 11:54 Rev Time 0.00
Received By sciard Date 2014-11-18 Time 11:54 Sent To  
Notes
2014-11-18 12:13:241. FBC 107.2.1.4. CLARITY OF PLANS.
 2. N.E.C. 210.12. ARC-FAULT PROTECTION FOR NEW CIRCUITS
 ADDED.
 3. FBC 107.3.5.3. PROVIDE LOAD CALCULATION.
 4. FBC SECTION R314 LOCATION OF SMOKE ALARMS.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-06-16 Cont ID  
Sent By dhayes Date 2015-06-16 Time 13:27 Rev Time 0.00
Received By dhayes Date 2015-06-15 Time   Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-11-18 Cont ID  
Sent By skennedy Date 2014-11-18 Time 15:39 Rev Time 0.00
Received By skennedy Date 2014-11-06 Time 10:40 Sent To  
Notes
2014-11-06 10:40:26TO SAK
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved