Plan Review Details - Permit 14100990
| Plan Review Stops For Permit 14100990 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2015-04-01 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2015-04-01 |
Time |
17:41 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2015-04-01 |
Time |
17:27 |
Sent To |
|
|
| Notes |
| 2015-04-01 17:35:36 | ****PROVISO**** | | | ****ISSUED AT CONTRACTOR'S RISK**** | | | ****LETTER FROM ENGINEER REQUIRED AT INSPECTION**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | 1. FBC 2010 RESIDENTIAL 301.2.1.4.2, A GROUND SURFACE | | | ROUGHNESS WITHIN EACH 45 DEGREE SECTOR SHALL BE | | | DETERMINED UPWIND FOR 1500 FEET. | | | | | | PLEASE SEE DEFINITIONS FOR "SURFACE ROUGHNESS B" AND | | | "SURFACE ROUGHNESS C." ALTHOUGH THIS APPEARS TO BE | | | EXPOSURE B IN MOST DIRECTIONS, THE LARGE PARK TO THE | | | NORTHWEST OF THIS PROPERTY WOULD PUT THIS IN EXPOSURE | | | C. | | | | | | ENGINEER TO EITHER PROVIDE A LETTER STATING THAT THIS | | | DESIGN COMPLIES WITH EXPOSURE C OR CONTACT ME TO | | | DISCUSS OPTIONS. | | | | | | THE LETTER IS TO BE PROVIDED AT INSPECTION AND RETURNED | | | TO THIS OFFICE BY THE FIELD INSPECTOR. IF THE INSPECTOR | | | DOES NOT RETURN THE LETTER TO THIS OFFICE, THE | | | CONTRACTOR IS RESPONSIBLE FOR BRINGING THE LETTER TO | | | THE BUILDING DIVISION. | | | | | | 2. A SEPARATE ELECTRICAL PERMIT IS REQUIRED. MAKE | | | REFERENCE TO THIS REVISION # WHEN SUBMITTING | | | APPLICATION. | | | | | | | | | | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2015-02-03 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2015-02-03 |
Time |
16:38 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2015-02-03 |
Time |
16:33 |
Sent To |
|
|
| Notes |
| 2015-02-03 16:36:18 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | 1-2. OK | | | | | | 3. INCLUDE WIND DESIGN CRITERIA ON PLAN, FBC 2010 | | | RESIDENTIAL 301. | | | | | | 4. OK | | | | | | 5. THE CERTIFICATE OF AUTHORIZATION NUMBER FOR THE | | | COMPANY IS TO BE INCLUDED IN THE TITLE BLOCK, FS471, | | | FAC61G15-23.002. PLEASE INCLUDE. (NUTEK ENGINEERING, | | | LLC SHOULD HAVE A LICENSE NUMBER WHICH IS REQUIRED TO | | | BE ON THE PLAN). | | | | | | NEW COMMENT: | | | | | | 6. THE PLANS SUBMITTED ARE POOR PHOTOCOPIES. DOCUMENTS | | | PREPARED BY AN ENGINEER AND SUBMITTED FOR PUBLIC RECORD | | | ARE TO BE SIGNED, SEALED DATED ORIGINALS FS471. | | | | | | 7. ADVISORY (DID NOT PREVENT PERMIT FROM BEING ISSUED) | | | - WHEN RESUBMITTING, PLEASE COMPLETE THE RE-SUBMITTAL | | | FORM WITH ACCURATE AND COMPLETE INFORMATION. THE | | | CONTRACTOR NAME WAS ABBREVIATED TO "AREI LLC"; | | | CONTRACTOR OF RECORD IS "AMERICAN ROOFING & EXTERIORS". | | | PLEASE BE ADVISED THAT CORRECT INFORMATION HELPS OUR | | | DEPARTMENT TO PROPERLY FILE AND LATER LOCATE PERMIT | | | DOCUMENTS, SO YOU ARE ENCOURAGED TO INCLUDE LEGIBLE AND | | | CORRECT INFORMATION. | | | | | | | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2014-11-10 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2014-11-10 |
Time |
16:06 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2014-11-10 |
Time |
16:06 |
Sent To |
E |
|
| Notes |
| 2014-11-10 16:35:07 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | 1. PROVIDE THE SPECIFICATION FOR INSTALLATION IN THE | | | FORM OF A PLAN. A LETTER WAS PROVIDED WITH A NARRATIVE | | | DESCRIBING THE JOB AS WELL AS INFORMATION FROM THE | | | INTERNET REGARDING TERRA COTTA (HOLLOW TILE). ALSO | | | THERE WAS A SKETCH WHICH IS NOT ENTIRELY LEGIBLE. IT IS | | | SUGGESTED TO PROVIDE A TYPED PLAN RATHER THAN SCRIPT. | | | SEE FBC 107, PLANS TO BE A MINIMUM OF 1/8" SCALE, | | | ARCHITECTURAL QUALITY. | | | | | | 2. PROVIDE A PLAN SHOWING HOUSE OUTLINE AND LOCATION OF | | | PROPOSED IMPROVEMENT, FBC 107. | | | | | | 3. INCLUDE WIND DESIGN CRITERIA ON PLAN, FBC 2010 | | | RESIDENTIAL 301. | | | | | | 4. ORIGINAL APPLICATION WAS TO "REPLACE WINDOW WITH | | | IMPACT FRENCH DOOR IN BEDROOM HALL", SO AN ELECTRICAL | | | REVIEW WAS NOT DONE. ELECTRICAL WORK IS SHOWN ON THE | | | ISSUED PLAN. AS CONTRACTOR HAS NOT APPLIED FOR AN | | | ELECTRICAL PERMIT, THIS WILL BE REVIEWED AT THIS TIME. | | | | | | 5. THE CERTIFICATE OF AUTHORIZATION NUMBER FOR THE | | | COMPANY IS TO BE INCLUDED IN THE TITLE BLOCK, FS471, | | | FAC61G15-23.002. PLEASE INCLUDE. | | | | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2014-11-14 |
|
|
Cont ID |
|
| Sent By |
dhayes |
Date |
2014-11-14 |
Time |
16:39 |
Rev Time |
0.00 |
| Received By |
dhayes |
Date |
2014-11-14 |
Time |
16:39 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2015-04-01 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2015-04-01 |
Time |
17:41 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2015-03-19 |
Time |
08:48 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2015-02-03 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2015-02-03 |
Time |
16:38 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2015-01-27 |
Time |
10:31 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2014-11-14 |
|
|
Cont ID |
|
| Sent By |
dhayes |
Date |
2014-11-14 |
Time |
16:39 |
Rev Time |
0.00 |
| Received By |
dhayes |
Date |
2014-11-10 |
Time |
16:35 |
Sent To |
|
|
| Notes |
| 2014-11-10 16:35:24 | TO DAH DESK | | | |
|
|
|