| Plan Review Stops For Permit 14100081 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2014-12-20 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2014-12-20 |
Time |
11:29 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2014-12-20 |
Time |
11:29 |
Sent To |
E |
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2014-12-18 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2014-12-18 |
Time |
08:14 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2014-12-18 |
Time |
07:45 |
Sent To |
E |
|
| Notes |
| 2014-12-18 07:50:02 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | | 561-805-6724 [email protected] | | | FBC FLORIDA BUILDING CODE 2010 | | | FBC R FLORIDA BUILDING CODE 2010 RESIDENTIAL | | | | | | | | | 1. TWO SETS REQUIRED FOR PERMIT ISSUANCE, FBC 107. ONE | | | SET OF PLANS WERE CHECKED OUT (BOAT LIFT ENGINEERING, | | | ELECTRICAL PLAN) BUT WAS NOT RETURNED. | | | | | | 2. VALUE IS TOO LOW. VALUE HAS BEEN CHANGED. PERMIT | | | WILL BE ISSUED WITH THE FOLLOWING PROVISO: | | | | | | | | | PROVISO | | | | | | VALUE STATED ON APPLICATION IS TOO LOW. VALUE HAS BEEN | | | ADJUSTED TO MARKET VALUE. FBC 109, VALUE IS TO INCLUDE | | | THE VALUE OF MATERIALS, LABOR, OVERHEAD, PROFIT, DESIGN | | | FEES (EVEN IF PROVIDED BY OTHERS). | | | | | | IF CONTRACTOR OBJECTS TO THE NEW VALUE, DO NOT PICK UP | | | THE PERMIT. PROVIDE DOCUMENTATION TO SUPPORT THE VALUE | | | OF $5000 (COPY OF CONTRACT, RECEIPT FOR MATERIALS, | | | ETC.) AND RESUBMIT. | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2014-11-12 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2014-11-12 |
Time |
09:07 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2014-11-12 |
Time |
09:07 |
Sent To |
E |
|
| Notes |
| 2014-11-12 09:08:29 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | FROM PREVIOUS LIST, NOT ADDRESSED (ELECTRICAL PLAN | | | SUBMITTED, NO STRUCTURAL INFORMATION): | | | | | | 1. STRUCTURAL ENGINEER IS TO VERIFY INTEGRITY OF | | | EXISTING STRUCTURE AND ITS ABILITY TO RESIST THE | | | APPLIED LOADS OF THE BOAT LIFT, FBC 2010 RESIDENTIAL | | | 301. | | | | | | IF SOMEONE OTHER THAN A STRUCTURAL ENGINEER OR LICENSED | | | ARCHITECT MAKES THIS DETERMINATION, CALCUATIONS WILL BE | | | REQUIRED. | | | | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2014-11-10 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2014-11-10 |
Time |
19:48 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2014-11-10 |
Time |
19:48 |
Sent To |
|
|
| Notes |
| 2014-11-10 19:50:00 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | 1. STRUCTURAL ENGINEER IS TO VERIFY INTEGRITY OF | | | EXISTING STRUCTURE AND ITS ABILITY TO RESIST THE | | | APPLIED LOADS OF THE BOAT LIFT, FBC 2010 RESIDENTIAL | | | 301. | | | | | | IF SOMEONE OTHER THAN A STRUCTURAL ENGINEER OR LICENSED | | | ARCHITECT MAKES THIS DETERMINATION, CALCUATIONS WILL BE | | | REQUIRED. | | | | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
4 |
Status |
P |
Date |
2015-01-10 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2015-01-10 |
Time |
10:00 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2014-12-17 |
|
|
Cont ID |
|
| Sent By |
dhayes |
Date |
2014-12-17 |
Time |
08:22 |
Rev Time |
0.00 |
| Received By |
dhayes |
Date |
2014-12-17 |
Time |
08:22 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2014-11-25 |
|
|
Cont ID |
|
| Sent By |
dhayes |
Date |
2014-11-25 |
Time |
10:18 |
Rev Time |
0.00 |
| Received By |
dhayes |
Date |
2014-11-25 |
Time |
10:18 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2014-10-28 |
|
|
Cont ID |
|
| Sent By |
dhayes |
Date |
2014-10-28 |
Time |
15:46 |
Rev Time |
0.00 |
| Received By |
dhayes |
Date |
2014-10-28 |
Time |
15:46 |
Sent To |
|
|
| Notes |
| 2014-10-28 16:09:28 | TO MISC. 2 | | | | | | | | 2014-10-28 16:08:21 | 10/28/2014 | | | PROJECT: BRENT YOHE BOAT LIFT | | | PERMIT#: 14100081 | | | CODE: 2008 EDITION OF THE NEC, 2010 EDITION OF THE FBC | | | ,2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1, | | | ADMINISTRATION, 2012 FBC SUPPLEMENTS. | | | ELECTRICAL PLAN REVIEW | | | ACTION: DENIED | | | | | | 1) PROVIDE THE LOCACATION OF THE MAIL PANEL PROVIDING | | | ELECTRICAL SERVICE TO THE LIFT. | | | | | | 2) INDICATE THE CIRCUIT BREAKER, CONDUCTOR AND CONDUIT | | | TYPE AND SIZE FEEDING THE LIFT FROM THE MAIN PANEL TO | | | EACH OF THE MOTOR LOCATIONS. | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. SEE LINK: | | | HTTP://WPB.ORG/DEVELOPMENT/WP-CONTENT/UPLOADS/SITES/33/ | | | 2013/09/APPLICATION_RESUBMITTAL_FORM_04132010.PDF | | | | | | ADDITIONALLY, PLEASE INSERT CORRECTED PAGES INTO | | | SUBMITTAL PACKAGE AND LEAVE THE PREVIOUSLY REVIEWED | | | SHEETS FOR COMPARATIVE REVIEW. | | | | | | DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, | | | 561-805-6717 OR [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2015-01-10 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2015-01-10 |
Time |
10:00 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2014-12-18 |
Time |
07:55 |
Sent To |
|
|
| Notes |
| 2014-12-20 11:29:31 | 12/20 TO DAH DESK | | | (2ND SET NEEDS ELEC STAMPS) | | | | | 2014-12-19 07:55:14 | RE-SUBMITTAL SENT TO SAMANTHA HILL FOR REVIEW. JG. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2014-12-18 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2014-12-18 |
Time |
07:46 |
Rev Time |
|
| Received By |
shill |
Date |
2014-12-17 |
Time |
16:12 |
Sent To |
|
|
| Notes |
| 2014-12-18 08:15:44 | 12/18 TO DAH DESK (ELEC SHEETS NOT STAMPED) | | | | | 2014-12-17 16:13:00 | TO S.HILLS DESK |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2014-11-25 |
|
|
Cont ID |
|
| Sent By |
dhayes |
Date |
2014-11-25 |
Time |
10:19 |
Rev Time |
0.00 |
| Received By |
dhayes |
Date |
2014-11-12 |
Time |
09:08 |
Sent To |
|
|
| Notes |
| 2014-11-12 09:08:48 | TO DAH DESK | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2014-11-10 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2014-11-10 |
Time |
19:50 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2014-10-02 |
Time |
15:33 |
Sent To |
Z |
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2014-10-24 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2014-11-10 |
Time |
19:50 |
Rev Time |
0.00 |
| Received By |
sgraham |
Date |
2014-10-24 |
Time |
11:45 |
Sent To |
B |
|
| Notes |
|
|