Plan Review Details - Permit 14090911
Plan Review Stops For Permit 14090911
Review Stop E ELECTRICAL
Rev No 2 Status P Date 2014-12-11 Cont ID  
Sent By jwitmer Date 2014-12-11 Time 16:48 Rev Time 0.00
Received By jwitmer Date 2014-12-11 Time 16:48 Sent To  
Notes
2014-12-11 16:48:48SEE MASTER PERMIT # 14090960, DAVID HAYES PASSED PLANS.

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2014-09-25 Cont ID  
Sent By sciard Date 2014-09-25 Time 13:22 Rev Time 0.00
Received By sciard Date 2014-09-25 Time 13:22 Sent To  
Notes
2014-09-25 14:08:37B13
  
  
2014-09-25 13:31:219/25/2014. PLEASE ADDRESS COMMENTS:
 1. REVISE FOLLOWING ITEMS: LOAD CALCULATION, PANEL
 SCHEDULE DOES NOT ADDRESS ALL LOADS.
 2. PANEL SCHEDULE OVERCURRENT PROTECTIVE DEVICES PASTRY
 WARMER,LARGE FREEZER (PANEL SCHEDULE SHOWS 15 KW LOAD
 WITH 20 AMPERE OCPD, PASTRY WARMER NO LOAD WITH 2#8 ON
 20 AMPERE OCPD.
 3.SERVICE RISER DIAGRAM SHOWS 3#1/0 AWG WITH 200 AMPERE
 OCPD.
 4. FBC 109.3 BUILDING PERMIT VALUATION. FOR PERMITTING
 PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL BE
 TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL,
 ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH,
 RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES,
 MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY
 LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST
 PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS
 SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY
 INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT
 VALUATION SHALL BE SET BY THE BUILDING OFFICIAL.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-12-11 Cont ID  
Sent By sciard Date 2014-12-11 Time 16:48 Rev Time 0.00
Received By jwitmer Date 2014-09-25 Time 14:07 Sent To  
Notes
2014-09-25 14:13:22ROUTED TO B13
2014-09-25 09:58:36ROUTED TO ELECTRICAL $5000 & UNDER


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved