| Plan Review Stops For Permit 14090647 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2015-01-21 |
|
|
Cont ID |
|
| Sent By |
kconrad |
Date |
2015-01-21 |
Time |
08:44 |
Rev Time |
0.00 |
| Received By |
kconrad |
Date |
2015-01-21 |
Time |
08:44 |
Sent To |
I |
|
| Notes |
| 2015-01-21 08:44:58 | DEBRIS REMOVAL FORM COMPLETED AND LATERAL CAPPED. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2014-12-02 |
|
|
Cont ID |
|
| Sent By |
tmoore |
Date |
2014-12-02 |
Time |
08:44 |
Rev Time |
0.00 |
| Received By |
tmoore |
Date |
2014-12-02 |
Time |
08:37 |
Sent To |
|
|
| Notes |
| 2014-12-02 08:43:55 | LEFT MESSAGE WITH CONTRACTOR. HAVE ALL BUT SEWER | | | LATERAL CAPPING DONE, AND DEBRIS DISPOSAL FORM FILLED | | | OUT. INSTRUCTED TO PULL TURNAROUND PERMIT AND SCHEDULE | | | FINAL #703. HE CAN TAKE CARE OF THE DEBRIS DISPOSAL | | | FORM WHEN COMING TO PICK UP PERMIT. | | | FILED IN SMALL PLAN CABINET UNDER "D". |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2014-10-23 |
|
|
Cont ID |
|
| Sent By |
tmoore |
Date |
2014-10-23 |
Time |
17:04 |
Rev Time |
0.00 |
| Received By |
tmoore |
Date |
2014-10-23 |
Time |
16:49 |
Sent To |
|
|
| Notes |
| 2014-10-23 17:04:23 | SPOKE TO CONTRACTOR TWICE TODAY. RECEIVED SOME RELEASES | | | BUT STILL NEED AS DISCUSSED, 1) GAS RELEASE, 2) SEWER | | | LATERAL PERMIT PULLED AND CAP INSPECTED WITH A PASSED | | | #703 PLUMBING FINAL, AND 3) A PASSED ENGINEERING PLAN | | | REVIEW. PLEASE SEE ENGINEERING REVIEW COMENTS OR STOP | | | IN FOR A COPY. | | | FILING APPLICATION IN SMALL PLAN CABINET UNDER "D" FOR | | | DUVOPH CORP. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2014-09-24 |
|
|
Cont ID |
|
| Sent By |
tmoore |
Date |
2014-09-24 |
Time |
16:36 |
Rev Time |
0.00 |
| Received By |
tmoore |
Date |
2014-09-24 |
Time |
16:28 |
Sent To |
ENG |
|
| Notes |
| 2014-09-24 16:36:34 | CONTRACTOR HAS PROVIDED SUNSHINE STATE ONE CALL UTILITY | | | LOCATE CONFIRMATIONS, BUT NO TYPICAL UTILITY RELEASE | | | FORMS VERIFYING NO UTILITY TO THAT ADDRESS. FAXED OUR | | | FORM AND UTILITY CONTACT NUMBERS TO CONTRACTOR. | | | FOLLOWED UP WITH MESSAGE TO CONTRACTOR REQUESTING HE | | | CALL ME IN THE MORNING WHEN I CAN EXPLAIN THE PROCESS | | | BETTER TO HIM. WILL MOVE ON TO ENGINEERING AND HISTORIC | | | EVEN THOUGH THERE IS NO SWPP PLAN INCLUDED, HISTORIC AT | | | LEASE CAN REVIEW COMPLETELY. |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
2 |
Status |
P |
Date |
2014-10-29 |
|
|
Cont ID |
|
| Sent By |
Mgonzale |
Date |
2014-10-29 |
Time |
|
Rev Time |
0.25 |
| Received By |
mgonzale |
Date |
2014-10-29 |
Time |
|
Sent To |
B |
|
| Notes |
| 2014-10-29 11:09:19 | NOTE: PROVISOS | | | | | | #1 CALL 811 BEFORE ANY DIGGING IN NEAR BYE EASEMENTS. | | | ("UNDERGROUND FACILITY DAMAGE PREVENTION AND SAFETY | | | ACT," CHAPTER 556, FLORIDA STATUTES | | | WWW.SUNSHINE811.COM) | | | | | | #2 POLLUTION PREVENTION PLAN HAS BEEN PROVIDED TO | | | ENGINEERING. PERMIT MUST COMPLY WITH ALL REQUIREMENTS | | | OF SECTION 74-2, 74-2(C) AND SECTION 94-446 OF THE CITY | | | OF WEST PALM BEACH CODE OF ORDINANCES. WWW.MUNICODE.COM | | | | | | #3 PERMIT MAY BE RELEASED ONCE ALL UTILITY RELEASES | | | HAVE BEEN SUBMITTED TO BUILDING DEPT. | | | | | | #4 FOR CITY UTILITIES AND CONSTRUCTION EMERGECIES | | | CONTACT (561) 822-2222. | | | | | | MANUEL JULIAN GONZALEZ | | | ENGINEERING PROJECT COORDINATOR | | | ENGINEERING SERVICES AND PUBLIC WORKS DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1085 | | | FAX: (561) 494-1116 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
F |
Date |
2014-10-01 |
|
|
Cont ID |
|
| Sent By |
tmoore |
Date |
2014-09-24 |
Time |
16:37 |
Rev Time |
0.00 |
| Received By |
cranford |
Date |
2014-10-01 |
Time |
10:05 |
Sent To |
B |
|
| Notes |
| 2014-10-01 10:07:40 | 1. A STORMWATER POLLUTION PREVENTION PLAN (SWPPP) MUST | | | BE SUBMITTED. THE PLAN WILL NEED TO ADDRESS PREVENTING | | | TURBID WATER, DIRT, DUST AND OTHER CONSTRUCTION DEBRIS | | | FROM LEAVING THE SITE EXCEPT IN SEALED CONTAINERS. | | | GUIDELINES FOR PREPARING THE SWPPP ARE UNDER: | | | HTTP://WPB.ORG/WP-CONTENT/UPLOADS/SITES/7/2012/05/2011- | | | 12-21-15-00-29-SWPPPGUIDE.PDF | | | | | | 2. DISTURBED PORTIONS OF THE SITE SHALL BE PERMANENTLY | | | STABILIZED NO LATER THAN 7 DAYS AFTER THE LAST | | | CONSTRUCTION ACTIVITY HAS OCCURRED. | | | | | | 3. BROKEN PAVEMENT OR OTHER DEBRIS SHALL BE REMOVED | | | FROM THE SITE AS SOON AS PRACTICAL. EXCAVATED MATERIAL | | | OR DEMOLITION DEBRIS SHALL NOT BE STORED IN | | | RIGHT-OF-WAY OR EASEMENT DURING CONSTRUCTION. | | | | | | 4. ANY WORK WITHIN OR OCCUPANCY OF THE RIGHT-OF-WAY | | | WILL REQUIRE A RIGHT-OF-WAY PERMIT. | | | | | | KELLY CRANFORD, P.E. | | | LAND DEVELOPMENT ENGINEER | | | ENGINEERING & PUBLIC WORKS DEPARTMENT | | | CITY OF WEST PALM BEACH | | | [email protected] | | | 561-494-1098 (OFFICE) | | | |
|
|
| Review Stop |
HIST |
HISTORICAL |
| Rev No |
1 |
Status |
P |
Date |
2014-09-26 |
|
|
Cont ID |
|
| Sent By |
fmittner |
Date |
2014-09-26 |
Time |
15:57 |
Rev Time |
0.00 |
| Received By |
fmittner |
Date |
2014-09-26 |
Time |
15:57 |
Sent To |
ENG |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2015-01-21 |
Time |
10:29 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2014-12-01 |
Time |
10:46 |
Sent To |
|
|
| Notes |
| 2014-12-01 10:47:24 | UTILITIES RELEASE SUBMITTAL SENT TO TOM MOORE FOR | | | REVIEW. JG. |
|
|