Plan Review Details - Permit 14090647
Plan Review Stops For Permit 14090647
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2015-01-21 Cont ID  
Sent By kconrad Date 2015-01-21 Time 08:44 Rev Time 0.00
Received By kconrad Date 2015-01-21 Time 08:44 Sent To I
Notes
2015-01-21 08:44:58DEBRIS REMOVAL FORM COMPLETED AND LATERAL CAPPED.

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2014-12-02 Cont ID  
Sent By tmoore Date 2014-12-02 Time 08:44 Rev Time 0.00
Received By tmoore Date 2014-12-02 Time 08:37 Sent To  
Notes
2014-12-02 08:43:55LEFT MESSAGE WITH CONTRACTOR. HAVE ALL BUT SEWER
 LATERAL CAPPING DONE, AND DEBRIS DISPOSAL FORM FILLED
 OUT. INSTRUCTED TO PULL TURNAROUND PERMIT AND SCHEDULE
 FINAL #703. HE CAN TAKE CARE OF THE DEBRIS DISPOSAL
 FORM WHEN COMING TO PICK UP PERMIT.
 FILED IN SMALL PLAN CABINET UNDER "D".

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2014-10-23 Cont ID  
Sent By tmoore Date 2014-10-23 Time 17:04 Rev Time 0.00
Received By tmoore Date 2014-10-23 Time 16:49 Sent To  
Notes
2014-10-23 17:04:23SPOKE TO CONTRACTOR TWICE TODAY. RECEIVED SOME RELEASES
 BUT STILL NEED AS DISCUSSED, 1) GAS RELEASE, 2) SEWER
 LATERAL PERMIT PULLED AND CAP INSPECTED WITH A PASSED
 #703 PLUMBING FINAL, AND 3) A PASSED ENGINEERING PLAN
 REVIEW. PLEASE SEE ENGINEERING REVIEW COMENTS OR STOP
 IN FOR A COPY.
 FILING APPLICATION IN SMALL PLAN CABINET UNDER "D" FOR
 DUVOPH CORP.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2014-09-24 Cont ID  
Sent By tmoore Date 2014-09-24 Time 16:36 Rev Time 0.00
Received By tmoore Date 2014-09-24 Time 16:28 Sent To ENG
Notes
2014-09-24 16:36:34CONTRACTOR HAS PROVIDED SUNSHINE STATE ONE CALL UTILITY
 LOCATE CONFIRMATIONS, BUT NO TYPICAL UTILITY RELEASE
 FORMS VERIFYING NO UTILITY TO THAT ADDRESS. FAXED OUR
 FORM AND UTILITY CONTACT NUMBERS TO CONTRACTOR.
 FOLLOWED UP WITH MESSAGE TO CONTRACTOR REQUESTING HE
 CALL ME IN THE MORNING WHEN I CAN EXPLAIN THE PROCESS
 BETTER TO HIM. WILL MOVE ON TO ENGINEERING AND HISTORIC
 EVEN THOUGH THERE IS NO SWPP PLAN INCLUDED, HISTORIC AT
 LEASE CAN REVIEW COMPLETELY.

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2014-10-29 Cont ID  
Sent By Mgonzale Date 2014-10-29 Time   Rev Time 0.25
Received By mgonzale Date 2014-10-29 Time   Sent To B
Notes
2014-10-29 11:09:19NOTE: PROVISOS
  
 #1 CALL 811 BEFORE ANY DIGGING IN NEAR BYE EASEMENTS.
 ("UNDERGROUND FACILITY DAMAGE PREVENTION AND SAFETY
 ACT," CHAPTER 556, FLORIDA STATUTES
 WWW.SUNSHINE811.COM)
  
 #2 POLLUTION PREVENTION PLAN HAS BEEN PROVIDED TO
 ENGINEERING. PERMIT MUST COMPLY WITH ALL REQUIREMENTS
 OF SECTION 74-2, 74-2(C) AND SECTION 94-446 OF THE CITY
 OF WEST PALM BEACH CODE OF ORDINANCES. WWW.MUNICODE.COM
  
 #3 PERMIT MAY BE RELEASED ONCE ALL UTILITY RELEASES
 HAVE BEEN SUBMITTED TO BUILDING DEPT.
  
 #4 FOR CITY UTILITIES AND CONSTRUCTION EMERGECIES
 CONTACT (561) 822-2222.
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES AND PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2014-10-01 Cont ID  
Sent By tmoore Date 2014-09-24 Time 16:37 Rev Time 0.00
Received By cranford Date 2014-10-01 Time 10:05 Sent To B
Notes
2014-10-01 10:07:401. A STORMWATER POLLUTION PREVENTION PLAN (SWPPP) MUST
 BE SUBMITTED. THE PLAN WILL NEED TO ADDRESS PREVENTING
 TURBID WATER, DIRT, DUST AND OTHER CONSTRUCTION DEBRIS
 FROM LEAVING THE SITE EXCEPT IN SEALED CONTAINERS.
 GUIDELINES FOR PREPARING THE SWPPP ARE UNDER:
 HTTP://WPB.ORG/WP-CONTENT/UPLOADS/SITES/7/2012/05/2011-
 12-21-15-00-29-SWPPPGUIDE.PDF
  
 2. DISTURBED PORTIONS OF THE SITE SHALL BE PERMANENTLY
 STABILIZED NO LATER THAN 7 DAYS AFTER THE LAST
 CONSTRUCTION ACTIVITY HAS OCCURRED.
  
 3. BROKEN PAVEMENT OR OTHER DEBRIS SHALL BE REMOVED
 FROM THE SITE AS SOON AS PRACTICAL. EXCAVATED MATERIAL
 OR DEMOLITION DEBRIS SHALL NOT BE STORED IN
 RIGHT-OF-WAY OR EASEMENT DURING CONSTRUCTION.
  
 4. ANY WORK WITHIN OR OCCUPANCY OF THE RIGHT-OF-WAY
 WILL REQUIRE A RIGHT-OF-WAY PERMIT.
  
 KELLY CRANFORD, P.E.
 LAND DEVELOPMENT ENGINEER
 ENGINEERING & PUBLIC WORKS DEPARTMENT
 CITY OF WEST PALM BEACH
 [email protected]
 561-494-1098 (OFFICE)
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2014-09-26 Cont ID  
Sent By fmittner Date 2014-09-26 Time 15:57 Rev Time 0.00
Received By fmittner Date 2014-09-26 Time 15:57 Sent To ENG
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date   Cont ID  
Sent By   Date 2015-01-21 Time 10:29 Rev Time 0.00
Received By jgomez Date 2014-12-01 Time 10:46 Sent To  
Notes
2014-12-01 10:47:24UTILITIES RELEASE SUBMITTAL SENT TO TOM MOORE FOR
 REVIEW. JG.