Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2015-06-16 Cont ID  
Sent By jgomez Date 2015-06-11 Time 17:35 Rev Time 0.00
Received By jgomez Date 2015-06-11 Time 17:34 Sent To Z
Notes
2015-06-11 17:36:27LIGHT POLES BUILDING REVIEW APPROVED WITH PROVISO:
  
 1- LIGHT POLES CALCULATIONS TO HAVE ENGINEER'S ORIGINAL
 SEAL AND SIGNATURE AS REQUIRED BY CHAPTER 471 FL. ST.
  
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2014-09-22 Cont ID  
Sent By jgomez Date 2014-09-22 Time 10:57 Rev Time 0.00
Received By jgomez Date 2014-09-22 Time 10:57 Sent To  
Notes
2014-09-22 11:30:15SITE LIGHTING, BUILDING REVIEW COMMENTS FORE LIGHT
 POLES.
 CODE: 2010 FBC.
  
 1- A) PROVIDE 2 COPIES OF THE LIGHT POLE MANUFACTURER'S
 SPECIFICATIONS SHOWING THAT THE POLE MEETS THE DESIGN
 CRITERIA SPECIFIED BY IN THE ENGINEER CALCULATIONS
 SUBMITTED. SEC. 107.2.1 CITY AMENDMENTS TO FBC.
  
 B) ENGINEER OF RECORD TO REVIEW AND APPROVE LIGHT POLE
 SPECIFICATIONS PRIOR TO SUBMITTAL. SEC. 107.3.4.1 CITY
 AMENDMENTS.
  
 2- ENGINEER'S CALCULATIONS SUBMITTED:
 A) NEED ENGINEER'S ORIGINAL SEAL AND SIGNATURE AS
 REQUIRED BY CHAPTER 471 FL. ST.
  
 B) IF ENGINEER IT'S TAKING OVER THE WORK OF ANOTHER
 ENGINEER, THEN HE NEEDS TO REMOVE THE SEAL AND
 SIGNATURE OF THE ORIGINAL ENGINEER AND SEAL AND USE HIS
 OWN TITLE BLOCK, SEAL AND SIGNATURE AS REQUIRED BY SEC.
 61G15-27.001. FAC.
  
 C) THERE ARE TWO DIFFERENT CALCULATIONS SUBMITTED AND
 THEY THE WERE SIGNED AND SEALED ON DIFFERENT DATES
 ALSO. COORDINATE AS REQUIRED AND RESUBMIT. SEC. 107.2.1
 CITY AMENDMENTS.
  
 D) THE CALCULATIONS NEED TO MATCH THE HEIGHT AND
 FOOTING INFORMATION SHOWN ON DRAWING PH.01 SUBMITTED.
 REVISE AS REQUIRED TO MATCH. SEC. 107.2.1 CITY
 AMENDMENTS.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICE DEPARTMENT
 (561)805-6712
 [email protected]

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2015-07-06 Cont ID  
Sent By dhayes Date 2015-07-06 Time 16:14 Rev Time 0.00
Received By dhayes Date 2015-07-06 Time 15:22 Sent To  
Notes
2015-06-16 11:43:30NOTE: REVISED DRAWINGS 35% REDUCTION IN LIGHTING. JG.

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2014-11-26 Cont ID  
Sent By dhayes Date 2014-11-26 Time 10:58 Rev Time 0.00
Received By dhayes Date 2014-11-26 Time 10:57 Sent To  
Notes
2014-11-26 11:07:19DATE: 11/26/14
 PROJECT: MIZNER LAKES, SITE LIGHTING
 PERMIT#: 14081250
 CODE: 2008 EDITION OF THE NEC
 2010 EDITION OF THE FBC
 2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1,
 ADMINISTRATION, 2012 FBC SUPPLEMENTS.
  
 2ND ELECTRICAL PLAN REVIEW
 ACTION: DENIED
  
 1) NOTE 5 ON SHEET E1.2 CALLS FOR A DETAIL ON SHEET
 E2.1. PROVIDE SHEET E2.1 FOR REVIEW.
  
 2) PROVIDE A PANEL SCHEDULE INDICATING THE SYSTEM
 VOLTAGE, THE SIZE OF THE MAIN OCPD, AIC RATING, AND
 IDENTIFY EACH INDIVIDUAL CIRCUIT FOR THE LIGHTING ON
 THE PLAN.
  
 3) PROVIDE A LOAD CALCULATION INDICATING THE TOTAL
 CONNECTED LOAD ON THE WHOLE PANEL INCLUDING THE
 ADDITIONAL LOAD OF THE NEW SITE LIGHTING. IF THERE ARE
 MULTIPLE PANELS COMPLETE FOR EACH PANEL.
  
 4) PROVIDE AND INDICATE ON THE PLANS THE WIRING METHOD,
 VOLTAGE, AMPERAGE, SIZE OF BRANCH CIRCUIT OCPD, CONDUIT
 AND WIRE SIZE, AS WELL AS LIGHTING CONTROL AS REQUIRED
 IN THE FBC SECTION 505.2.4
  
 5) PROVIDE ADDITIONAL DETAIL REAGARDING THE
 INSTALLATION OF THE IRRIGATION SYSTEMS AND FOR THE
 FLOATING FOUNTAINS. PROVIDE DETAILS THAT PROVIDE
 COMPLIANCE WITH THE NEC 682 AND 430
  
 6) COMPLY WITH THE NOTES ADDED BY JULIO GOMEZ BUILDING
 REVIEWER REGARDING THE ENGINEERING FOR WIND LOAD AND
 THE CHANGE OF ENGINEER. IF LUIS VARGAS OF POWER DESIGN
 IS TAKING OVER THE DESIGN OF THE DESIGN
 RESPONSABILITIES OF THE SITE LIGHTING PROJECT HIS
 ORIGINAL SEAL AND SIGNATURE MUST APPEAR ON ALL SHEETS
 SUBMITTED FOR REVIEW.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. SEE LINK:
 HTTP://WPB.ORG/DEVELOPMENT
 /WP-CONTENT/UPLOADS/SITES/33/2013/09/APPLICATION_RESUBM
 ITTAL_FORM_04132010.PDF
  
 ADDITIONALLY, PLEASE INSERT CORRECTED PAGES INTO
 SUBMITTAL PACKAGE AND LEAVE THE PREVIOUSLY REVIEWED
 SHEETS FOR COMPARATIVE REVIEW.
  
 DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421,
 561-805-6717 OR [email protected]
  
  

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2014-08-29 Cont ID  
Sent By dhayes Date 2014-08-29 Time 11:03 Rev Time 0.00
Received By dhayes Date 2014-08-29 Time 10:38 Sent To Z
Notes
2014-08-29 11:06:38SENT TO ZONING FOR PHOTOMETRIC REVIEW
2014-08-29 11:03:31DATE: 8/29/2014
 PROJECT: MIZNER LAKES, SITE LIGHTING
 PERMIT#: 14081250
 CODE: 2008 EDITION OF THE NEC
 2010 EDITION OF THE FBC
 2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1,
 ADMINISTRATION, 2012 FBC SUPPLEMENTS.
  
 1ST ELECTRICAL PLAN REVIEW
 ACTION: DENIED
  
 1) PROVIDE AND INDICATE ON THE PLANS, THE LOCATION OF
 THE SOURCE OF POWER, CONDUIT ROUTING, BURIAL DEPTH,
 CIRCUIT #'S, AND GROUNDING DETAIL. PROVIDE VOLTAGE DROP
 CALCULATIONS AS NEEDED. IF THERE ARE MULIPLE SOURCES
 INDICATE EACH ONE INDIVIDUALLY AND COMPLETE THE REST OF
 THE DETAIL FROM EACH INDIVIDUAL SOURCE.
  
 2) PROVIDE A PANEL SCHEDULE INDICATEING THE SYSTEM
 VOLTAGE, THE SIZE OF THE MAIN OCPD, AIC RATING, AND
 IDENTIFY EACH INDIVIDUAL CIRCUIT FOR THE LIGHTING ON
 THE PLAN.
  
 3) PROVIDE A LOAD CALCULATION INDICATING THE TOTAL
 CONNECTED LOAD ON THE WHOLE PANEL INCLUDING THE
 ADDITIONAL LOAD OF THE NEW SITE LIGHTING. IF THERE ARE
 MULTIPLE PANELS COMPLETE FOR EACH PANEL.
  
 4) PROVIDE AND INDICATE ON THE PLANS THE METHOD OF
 LIGHTING CONTROL AS REQUIRED IN THE FBC SECTION 505.2.4
 AGAIN IF THERE ARE MULTIPLE SOURCES COMPLETE FOR EACH.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. SEE LINK:
 HTTP://WPB.ORG/DEVELOPMENT
 /WP-CONTENT/UPLOADS/SITES/33/2013/09/APPLICATION_RESUBM
 ITTAL_FORM_04132010.PDF
  
 ADDITIONALLY, PLEASE INSERT CORRECTED PAGES INTO
 SUBMITTAL PACKAGE AND LEAVE THE PREVIOUSLY REVIEWED
 SHEETS FOR COMPARATIVE REVIEW.
  
 DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421,
 561-805-6717 OR [email protected]
  
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2015-07-06 Cont ID  
Sent By dhayes Date 2015-07-06 Time 16:22 Rev Time 0.00
Received By dhayes Date 2015-05-11 Time   Sent To  
Notes
2015-05-11 17:24:32SENT TO J. GOMEZ DESK.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2014-11-26 Cont ID  
Sent By dhayes Date 2014-11-26 Time 11:36 Rev Time 0.00
Received By dhayes Date 2014-11-25 Time 11:36 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-09-22 Cont ID  
Sent By jgomez Date 2014-09-22 Time 11:30 Rev Time 0.00
Received By jgomez Date 2014-08-28 Time 14:07 Sent To  
Notes
2014-08-28 14:07:51ROUTED TO ELECTRICAL

Review Stop Z ZONING
Rev No 2 Status P Date 2015-06-26 Cont ID  
Sent By ajones Date 2015-06-26 Time 11:36 Rev Time 0.00
Received By ajones Date 2015-06-26 Time 11:36 Sent To  
Notes
2015-06-12 10:23:41NOTE: REVISED DRAWINGS 35% REDUCTION IN LIGHTING. JG.

Review Stop Z ZONING
Rev No 1 Status P Date 2014-09-09 Cont ID  
Sent By ajones Date 2014-09-09 Time 17:46 Rev Time 0.00
Received By ajones Date 2014-09-09 Time 17:46 Sent To E
Notes
***NONE***