Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2014-09-04 Cont ID  
Sent By jwitmer Date 2014-09-04 Time 08:31 Rev Time 0.00
Received By jwitmer Date 2014-09-03 Time 15:08 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2014-09-11 Cont ID  
Sent By rlecky Date 2014-09-11 Time 12:40 Rev Time 0.00
Received By rlecky Date 2014-09-11 Time 12:19 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2014-09-04 Cont ID  
Sent By pleduc Date 2014-09-04 Time   Rev Time 0.00
Received By pleduc Date 2014-09-04 Time 11:35 Sent To  
Notes
2014-09-04 11:54:02THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 THE NATURE OF THE REMODEL REQUIRES AN EVALUATION OF THE
 FIRE ALARM AND SPRINKLER SYSTEM FOR CODE COVERAGE AND
 COMPLIANCE.
  
 THE LIFE SAFETY SYSTEMS, FIRE ALARM AND/OR FIRE
 SPRINKLER SHALL REMAIN ACTIVE THROUGHOUT THE
 CONSTRUCTION PERIOD.
  
 ANY AND ALL WORK ON THE FIRE ALARM AND FIRE SPRINKLER
 SYSTEMS SHALL BE DONE UNDER SEPARATE SHOP DRAWINGS AND
 BY CERTIFIED LIFE SAFETY CONTRACTORS.
  
 ANY TIME THAT WORK ON THE LIFE SAFETY SYSTEMS,
 SPRINKLER AND/OR FIRE ALARM, EXCEEDS 4 HOURS, A FIRE
 WATCH SHALL BE IMPLEMENTED AND MAINTAINED UNTIL FULL
 AND COMPLETE PROTECTION IS RETURNED.
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2014-09-25 Cont ID  
Sent By tklarge Date 2014-09-25 Time 13:51 Rev Time 0.00
Received By tklarge Date 2014-09-24 Time 16:37 Sent To  
Notes
2014-09-24 16:37:53TO TL DESK
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-09-19 Cont ID  
Sent By tklarge Date 2014-09-19 Time 11:16 Rev Time 0.00
Received By tklarge Date 2014-08-28 Time 10:51 Sent To  
Notes
2014-09-19 11:17:319/19/14-DENIED/E-MAILED CONTRACTOR/PLACED IN SMALL
 "A".TKL.
2014-08-29 10:51:19B-30. JW

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status N Date 2014-09-04 Cont ID  
Sent By jwitmer Date 2014-09-04 Time 08:31 Rev Time 0.00
Received By jwitmer Date 2014-09-04 Time 08:31 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date   Cont ID  
Sent By Bergsma Date 2014-09-15 Time   Rev Time 0.75
Received By   Date   Time   Sent To  
Notes
2014-09-15 15:36:34SEE A-1 ALSO FOR STATION AND CHASE DETAILS

Review Stop P PLUMBING
Rev No 2 Status P Date 2014-09-25 Cont ID  
Sent By tklarge Date 2014-09-25 Time 13:51 Rev Time 0.00
Received By tklarge Date 2014-09-25 Time 13:50 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2014-09-19 Cont ID  
Sent By tklarge Date 2014-09-19 Time 11:18 Rev Time 0.00
Received By tklarge Date 2014-09-19 Time 11:01 Sent To  
Notes
2014-09-19 11:15:171) THE FLOOR PLAN SHOWS ONE DRINKING FOUNTAIN. NO FEWER
 THAN TWO DRINKING FOUNTAINS SHALL BE PROVIDED. 2010 FL.
 ACCESS. CODE SEC. 211.2.
 2) SHOW THE SIZE OF THE FLOOR DRAIN/PIPING. WPB ADMIN.
 AMEND. TP 2010 FBC SEC. 107.2.1.
 3) SUBMIT A WATER RISER FOR REVIEW. WPB AMEND. TO 2010
 FBC SEC. 107.2.1.
 4) SHT. P-1 - THE WATER HEATER DETAIL SHOWS THE RELIEF
 LINE DISCHARGING TO A FLOOR DRAIN BUT THERE IS NO FLOOR
 DRAIN LOCATED IN THE ROOM. CLARIFY.
 5) THE DRAINAGE SYSTEM SHALL HAVE ONE VENT STACK OR
 STACK VENT THAT EXTENDS OUTDOORS TO THE OPEN AIR PER
 THE 2010 FPC SEC.917.7.
 6) SHT. P-1, NOTE #1 STATES "3/4" DIRECT WASTE TO
 PEDICURE CHAIRS.TYPICAL OF TWO." WHAT IS THIS NOTE
 REFERRING TO? THE SPEC SHEETS FOR THE CHAIRS SHOW AN 1
 1/2" DRAIN. CLARIFY.
 7) SHOW THE SIZE OF THE VENT FOR THE LAVATORY.
  
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  
  

Review Stop Z ZONING
Rev No 1 Status P Date 2014-09-11 Cont ID  
Sent By ajones Date 2014-09-11 Time 15:10 Rev Time 0.00
Received By ajones Date 2014-09-11 Time 15:10 Sent To  