| Plan Review Stops For Permit 14081014 |
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
F |
Date |
2014-09-05 |
|
|
Cont ID |
|
| Sent By |
cranford |
Date |
2014-09-05 |
Time |
13:48 |
Rev Time |
0.50 |
| Received By |
cranford |
Date |
2014-09-05 |
Time |
13:40 |
Sent To |
I |
|
| Notes |
| 2014-09-05 13:47:31 | LOCATION OF PROPOSED EXPANSION WILL EITHER NEED TO BE | | | SHOWN ON SURVEY OR AERIAL PHOTOGRAPH OF PROPERTY. | | | | | | IF WORK IS PROPOSED WITHIN THE RIGHT-OF-WAY, IT MUST | | | COMPLY WITH THE CITY STANDARD DRIVEWAY APRON DETAIL. | | | | | | THE MAXIMUM DRIVEWAY WIDTH IS 20 FT (MEASURED AT THE | | | RIGHT-OF-WAY LINE). | | | | | | KELLY E CRANFORD, PE | | | LAND DEVELOPMENT ENGINEER | | | ENGINEERING & PUBLIC SERVICES | | | CITY OF WEST PALM BEACH | | | [email protected] | | | (561)494-1098 | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2014-09-05 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2014-09-05 |
Time |
14:46 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2014-08-22 |
Time |
09:23 |
Sent To |
|
|
| Notes |
| 2014-08-25 09:24:14 | SENT TO ZONING SHELF FOR REVIEW. JG. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2014-09-03 |
|
|
Cont ID |
|
| Sent By |
sgraham |
Date |
2014-09-03 |
Time |
12:15 |
Rev Time |
|
| Received By |
sgraham |
Date |
|
Time |
|
Sent To |
ENG |
|
| Notes |
| 2014-09-03 12:16:41 | 9/3/14 ZONING FAILED | | | | | | 1. SHOW LOCATION OF THE DRIVEWAY EXTENSION ON THE | | | SURVEY, |
|
|
|