Plan Review Details - Permit 14081014
Plan Review Stops For Permit 14081014
Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2014-09-05 Cont ID  
Sent By cranford Date 2014-09-05 Time 13:48 Rev Time 0.50
Received By cranford Date 2014-09-05 Time 13:40 Sent To I
Notes
2014-09-05 13:47:31LOCATION OF PROPOSED EXPANSION WILL EITHER NEED TO BE
 SHOWN ON SURVEY OR AERIAL PHOTOGRAPH OF PROPERTY.
  
 IF WORK IS PROPOSED WITHIN THE RIGHT-OF-WAY, IT MUST
 COMPLY WITH THE CITY STANDARD DRIVEWAY APRON DETAIL.
  
 THE MAXIMUM DRIVEWAY WIDTH IS 20 FT (MEASURED AT THE
 RIGHT-OF-WAY LINE).
  
 KELLY E CRANFORD, PE
 LAND DEVELOPMENT ENGINEER
 ENGINEERING & PUBLIC SERVICES
 CITY OF WEST PALM BEACH
 [email protected]
 (561)494-1098
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-09-05 Cont ID  
Sent By skennedy Date 2014-09-05 Time 14:46 Rev Time 0.00
Received By skennedy Date 2014-08-22 Time 09:23 Sent To  
Notes
2014-08-25 09:24:14SENT TO ZONING SHELF FOR REVIEW. JG.

Review Stop Z ZONING
Rev No 1 Status F Date 2014-09-03 Cont ID  
Sent By sgraham Date 2014-09-03 Time 12:15 Rev Time  
Received By sgraham Date   Time   Sent To ENG
Notes
2014-09-03 12:16:419/3/14 ZONING FAILED
  
 1. SHOW LOCATION OF THE DRIVEWAY EXTENSION ON THE
 SURVEY,


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved