Plan Review Details - Permit 14080998
Plan Review Stops For Permit 14080998
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2014-12-01 Cont ID  
Sent By shill Date 2014-12-01 Time 10:33 Rev Time 0.00
Received By shill Date 2014-12-01 Time 10:33 Sent To ENG
Notes
2014-12-01 10:34:17****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 FROM PREVIOUS LIST:
  
 4. VALUE IS TO INCLUDE LABOR, MATERIALS, OVERHEAD,
 PROFIT, ENGINEERING/ARCHTECTURE, FBC 109. PROVIDE A
 COPY OF THE CONTRACT FOR THIS JOB.
  
 THIS MAY BE SENT VIA EMAIL.
  
  
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2014-09-13 Cont ID  
Sent By shill Date 2014-09-13 Time 13:17 Rev Time 0.00
Received By shill Date 2014-09-13 Time 13:17 Sent To ENG
Notes
2014-09-13 13:32:02****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. THIS PARCEL IS LOCATED IN A SPECIAL HAZARD FLOOD
 AREA. EITHER PROVIDE A SURVEY WITH SPOT ELEVATIONS TO
 SHOW THAT PROPOSED IMPROVEMENT IS ABOVE BFE OR REVISE
 PLAN TO INDICATE THAT IT HAS BEEN DESIGNED TO RESIST
 FLOOD LOADS, FBC 2010 RESIDENTIAL 301.2.4.
  
 2. SITE PLAN SHOWS A PROPOSED ADDITION. AS NEW
 PRELIMINARY MAPS HAVE BEEN ISSUED AND WE ARE CURRENTLY
 IN THE "PUBLIC COMMENT AND APPEAL" PERIOD (90 DAYS),
 AND OUR ORDINANCE WILL CHANGE IN THE NEAR FUTURE, IT IS
 STRONGLY SUGGESTED THAT AN ELEVATION CERTIFICATE IS
 PROVIDED AT THIS TIME FOR EVALUATION AND GUIDANCE. THIS
 MAY BE EMAILED DIRECTLY TO ME. THE INTENT IS TO
 DETERMINE AFFECT OF CURRENT CONDITIONS ON THE PROPOSED
 ADDITION, EVALUATION OF THE EFFECT OF THE PROPOSED MAPS
 ON THE PROPERTY, FLOOD MITIGATION, AND ANY ASSISTANCE
 WE MAY BE ABLE TO OFFER. THIS IS VOLUNTARY AND IS
 UNRELATED TO THIS PERMIT (NOT REQUIRED FOR PERMIT
 ISSUANCE).
  
 3. THE PROPOSED IMPROVEMENT IS IN AN AREA OF KNOWN
 QUESTIONABLE SOILS. HOW HAS ARCHITECT DETERMINED THAT
 THE SOIL HAS A BEARING CAPACITY OF 2500 PSF? SEE FBC
 2010 RESIDENTIAL 401.4. EITHER PROVIDE A GEOTECHNICAL
 REPORT OR HAVE ARCHITECT CONTACT ME TO DISCUSS. THIS
 REQUIREMENT MAY BE REMOVED UNDER CERTAIN CONDITIONS
 AFTER DISCUSSION WITH ARCHITECT.
  
 4. VALUE IS TO INCLUDE LABOR, MATERIALS, OVERHEAD,
 PROFIT, ENGINEERING/ARCHTECTURE, FBC 109. PROVIDE A
 COPY OF THE CONTRACT FOR THIS JOB.
  
 5. PROVIDE EASEMENT CONSENTS FROM THE UTILITY
 COMPANIES; CONSTRUCTION PROPOSED IN AN EASEMENT.
  
  
  
  

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2014-12-05 Cont ID  
Sent By cranford Date 2014-12-05 Time 09:57 Rev Time 0.00
Received By cranford Date 2014-12-05 Time 09:47 Sent To I
Notes
2014-12-05 09:55:19SIGNED CONSENT FORMS HAVE BEEN PROVIDED AUTHORIZING
 WORK WITHIN EASEMENT.
  
 SIGNED AND SEALED ARCHITECTURAL PLANS FOR THE WALL HAVE
 BEEN SUBMITTED.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2014-09-16 Cont ID  
Sent By cranford Date 2014-09-16 Time 14:21 Rev Time 0.00
Received By cranford Date 2014-09-16 Time 14:20 Sent To I
Notes
2014-09-16 14:21:15SEE EASEMENT AND FLOOD PLAIN COMMENTS UNDER BUILDING
 AND ZONING REVIEWS.

Review Stop HIST HISTORICAL
Rev No 2 Status P Date 2014-11-19 Cont ID  
Sent By fmittner Date 2014-11-19 Time 14:26 Rev Time 0.00
Received By fmittner Date 2014-11-19 Time 14:26 Sent To Z
Notes
2014-11-19 14:26:39SENT TO ANGELLA FOR ZONING REVIEW.

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2014-08-28 Cont ID  
Sent By fmittner Date 2014-08-28 Time 10:53 Rev Time 0.00
Received By fmittner Date 2014-08-28 Time 10:53 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2014-12-05 Cont ID  
Sent By cranford Date 2014-12-05 Time 09:57 Rev Time 0.00
Received By cranford Date 2014-12-05 Time 09:57 Sent To  
Notes
2014-12-01 10:34:4112/1 TO ENGINEERING
  
2014-11-12 07:28:58INCOMING SENT TO ZONING BOX. JW

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-09-17 Cont ID  
Sent By shill Date 2014-09-17 Time 17:16 Rev Time 0.00
Received By skennedy Date 2014-09-13 Time 13:32 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 3 Status P Date 2014-11-20 Cont ID  
Sent By sgraham Date 2014-11-20 Time 08:28 Rev Time 0.00
Received By sgraham Date 2014-11-20 Time 08:28 Sent To B
Notes
2014-11-20 08:29:2411/20/14 ANGELLA VANN AND BRIAN COLLINS APPROVED 6'
 WALL IN THE FRONT, DETERMINING WASHINGTON ROAD IS A
 MAIN ARTERY.

Review Stop Z ZONING
Rev No 2 Status F Date 2014-09-12 Cont ID  
Sent By sgraham Date 2014-09-12 Time 09:14 Rev Time 0.00
Received By sgraham Date 2014-09-12 Time 09:14 Sent To B
Notes
2014-09-12 09:19:289/12/14 ZONING FAILED
  
 1. FENCE TO BE INSTALL IN AN EASEMENT, MUST PROVIDE
 EASEMENT RELEASES FROM ALL FIVE UTILITY COMPANIES.
 CONSTRUCTION SERVICE HAS THE FORMS, YOU CAN CONTACT
 THEM AT 561-805-6700.

Review Stop Z ZONING
Rev No 1 Status F Date 2014-08-28 Cont ID  
Sent By fmittner Date 2014-08-28 Time 10:27 Rev Time 0.00
Received By fmittner Date 2014-08-28 Time 10:27 Sent To  
Notes
2014-08-28 10:31:53WALL HEIGHT EXCEEDS PERMITTED IN FRONT SETBACK
 (WASHINGTON ROAD). FRIEDERIKE MITTNER LEFT MESSAGES
 WITH JEFF BRASSUER (ARCHITECT) 8/22 AND JOSH
 (CONTRACTOR) 8/28. FILING UNDER SMALL PLANS DENIED "A".


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved