Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2014-08-19 Cont ID  
Sent By skennedy Date 2014-08-19 Time 14:56 Rev Time 0.00
Received By skennedy Date 2014-08-19 Time 14:56 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2014-08-18 Cont ID  
Sent By skennedy Date 2014-08-18 Time 14:06 Rev Time 0.00
Received By skennedy Date 2014-08-18 Time 14:06 Sent To  
Notes
2014-08-18 14:15:53SPOKE TO CONTRACTOR, HE ALSO HAS A WINDOW AND DOOR
 SPECIALTY LICENSE AND UNDERSTANDS HE MUST SUBCONTRACT
 THE INCIDENTIAL WORK NOT COVERED BY EITHER LICENSE HE
 HOLDS. A FLOOR PLAN WILL BE RESUBMITTED.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2014-08-18 Cont ID  
Sent By skennedy Date 2014-08-18 Time 12:09 Rev Time 0.00
Received By skennedy Date 2014-08-18 Time 12:09 Sent To  
Notes
2014-08-18 12:25:008/18/14 FBC 2010, 1ST REVIEW:
  
 THE CONTRACTOR LISTED ON THE APPLICATION IS LICENSED IN
 THE SPECIALTY CARPENTRY CONTRACTOR CATAGORY THROUGH THE
 PBCCILB. THE SCOPE OF WORK FOR THE APPLCATION MAY BE
 OUTSIDE OF THE SCOPE FOR THIS LICENSE CATAGORY.
 "SPECIALTY CONTRACTORS" ARE THOSE WHO CAN QUALIFY WITH
 A MINIMUM OF THREE YEARS EXPERIENCE, 1-1/2 YEARS OF
 WHICH MUST BE IN A SUPERVISORY CAPACITY, WHO SPECIALIZE
 IN ONE OR MORE OF THE CRAFTS OF THE BUILDING
 CONSTRUCTION AND RELATED CONTRACTING TRADES. A
 CERTIFIED SPECIALTY CONTRACTOR SHALL BE ABLE TO
 SUBCONTRACT ANY WORK INCIDENTAL TO THE WORK OF THEIR
 SPECIALTY CERTIFICATION.
 INCIDENTAL-FOR THE PURPOSE OF THIS DOCUMENT INCIDENTAL
 SHALL MEAN WORK OF A NATURE EXPECTED TO BE REQUIRED IN
 THE PERFORMANCE OF A CONTRACT. SUCH WORK SHALL NOT BE
 THE PRIMARY PURPOSE OF THE CONTRACT NOR EXCEED 49% OF
 THE TOTAL PRIME CONTRACT.
  
 PLEASE PROVIDE MORE INFORMATION IN THE FORM OF A SIMPLE
 PLAN WITH NOTES TO CLARIFY THE SCOPE OF WORK.
 ADDITIONALLY, INDICATE IF THE WORK WILL BE
 SUBCONTRACTED AS INDICATED ABOEV.
  
 107.3.5 MINIMUM PLAN REVIEW CRITERIA FOR BUILDINGS. THE
 EXAMINATION OF THE DOCUMENTS BY THE BUILDING OFFICIAL
 SHALL INCLUDE THE FOLLOWING MINIMUM CRITERIA AND
 DOCUMENTS: A FLOOR PLAN; ; ROUGH OPENING DIMENSIONS;
 AND ALL EXTERIOR ELEVATIONS:
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]
  
  
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2015-04-24 Cont ID  
Sent By fmittner Date 2015-04-24 Time 16:47 Rev Time 0.00
Received By fmittner Date 2015-04-24 Time 16:47 Sent To  
Notes
2015-04-24 16:49:40WINDOW PASSED PER REVISION #15010407 AND HISITORIC
 BOARD RULING. ADDING PASS THIS DATE 4/24/15 TO ALLOW
 INSPECTIONS TO PROCEED. WINDOW IS ALUMINUM HOPPER
 WINDOW.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-08-18 Cont ID  
Sent By skennedy Date 2014-08-18 Time 14:06 Rev Time  
Received By skennedy Date 2014-08-13 Time   Sent To  
Notes
2014-08-13 18:50:06SENT TO BLDG UNDER $5000