Plan Review Details - Permit 14080175
Plan Review Stops For Permit 14080175
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2014-08-24 Cont ID  
Sent By jwitmer Date 2014-08-24 Time 10:14 Rev Time 0.00
Received By jwitmer Date 2014-08-24 Time 09:45 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2014-09-03 Cont ID  
Sent By dhayes Date 2014-09-03 Time 14:48 Rev Time 0.00
Received By dhayes Date 2014-09-03 Time 14:32 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2014-08-11 Cont ID  
Sent By scaldero Date 2014-08-11 Time 15:58 Rev Time 0.00
Received By scaldero Date 2014-08-11 Time 15:58 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2014-09-06 Cont ID  
Sent By hmoser Date 2014-09-06 Time 09:28 Rev Time 0.00
Received By hmoser Date 2014-09-04 Time 11:35 Sent To  
Notes
2014-09-05 11:35:55SENT TO H MOSER

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-09-03 Cont ID  
Sent By dhayes Date 2014-09-03 Time 14:48 Rev Time 0.00
Received By dhayes Date 2014-08-05 Time 16:39 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2014-09-06 Cont ID  
Sent By hmoser Date 2014-09-06 Time 09:28 Rev Time 0.00
Received By hmoser Date 2014-09-06 Time 09:28 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2014-08-15 Cont ID  
Sent By jdariton Date 2014-08-15 Time 10:05 Rev Time 0.00
Received By jdariton Date 2014-08-15 Time 10:04 Sent To  
Notes
2014-08-15 10:10:59NOTES;
 1.PROVIDE OUTSIDE AIR CALCULATIONS BASED ON THE TOTAL
 OCCUPANT LOAD AND AS REQUIRED BY 2010 FMC, TABLE 403.3
 OR ASHRAE 62.1-2004.USE EQUATION 4-1 AS REQUIRED BY SEC
 403.3.1.1.
 2.SHOW ON PLANS LOCATION OF ALL FIRE DAMPERS IF ANY.
 3.CLARIFY ON PLANS IF YOU HAVE TRANSFER DUCTS( JUMPER)
 OR TRANSFER R/A GRILLS AS SHOWN ON PLANS.
 4.INDICATE ON PLANS THE SIZES OF ALL RETURN AIR
 TRANSFER DUCTS AND SUPPLY AIR DUCTS.
 5.IF DUCTS PENETRATE THROUGH FIRE/SMOKE RATED
 PARTITIONS THEY SHALL BE PROTECTED WITH APPROVED
 FIRE/SMOKE DAMPERS,INSTALLED IN ACCORDANCE WITH THEIR
 LISTING AS REQUIRED BY FBC-MECHANICAL SEC.607.1.1.
 6.SINCE THE BUILDING HAS EXISTING SMOKE EVAC.SYSTEM,
 THEN PROVIDE SUFFICIENT INFORMATION ON PLANS AND
 INDICATE IF THE SYSTEM HAS BEEN AFFECTED BY THIS
 ALTERATION. ALSO INCLUDE OPERATIONAL AND ACCEPTANCE
 TESTING PROCEDURES AS REQUIRED BY FMC,SEC.513.1 AND
 513.2.
 7.INDICATE ON PLANS COMPLIANCE TO FMC, SEC.602.2.1 FOR
 MATERIALS WITHIN PLENUMS SHALL BE NONCOMBUSTIBLE OR
 SHALL HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 25 AND
 A SMOKE DEVELOPED INDEX NOT MORE THAN 50 WHEN TESTED IN
 ACCORDANCE WITH ASTM E 84 OR UL 723.
 REVIEWED BY JOHN ARITON.FOR QUESTION PLEASE CALL HAROLD
 MOSER AT 561-805-6732.