| 2014-08-18 15:51:52 | DATE: 8/18/2014 |
| | PROJECT: CARSON 240 PALMETTO LN |
| | PERMIT#: 14080064 |
| | CODE: 2008 EDITION OF THE NEC |
| | 2010 EDITION OF THE FBC |
| | 2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1, |
| | ADMINISTRATION, 2012 FBC SUPPLEMENTS. |
| | |
| | 1ST ELECTRICAL PLAN REVIEW |
| | ACTION: DENIED |
| | |
| | 1) NEC 310.15(6) |
| | STATES IN PART "FOR APPLICATION OF THIS SECTION, THE |
| | MAIN POWER FEEDER SHALL BE THE FEEDER BETWEEN THE MAIN |
| | DISCONNECT AND THE PANELBOARD THAT SUPPLIES, EITHER BY |
| | BRANCH CIRCUITS OR BY FEEDERS, OR BOTH, ALL LOADS THAT |
| | ARE PART OR ASSOCIATED WITH THE DWELLING UNIT. " |
| | THIS MEANS ONLY ONE SERVICE ENTRANCE OR FEEDER TO ONE |
| | MAIN NOT MORE THAN ONE. THE PURPOSE OF THIS SECTION IS |
| | TO DIVERSIFY THE TOTAL LOAD EVENLY ACCROSS THE |
| | CONDUCTORS WHEN THERE IS MORE THAN ONE MAIN THAT CAN |
| | NOT BE ACCOMPLISHED. THEREFORE A FULL SIZE SERVICE |
| | ENTRANCE AND FEEDER IS REQUIRED. REVISE THE RISER |
| | DIAGRAM ACCORDINGLY. |
| | |
| | 2) THE SCOPE OF WORK REFERRED TO AT THE TOP OF THE |
| | RISER DIAGRAM IS NOT REFLECTED ACURATELY IN THE PLAN |
| | SUBMITTED. EXAMPLE: IT IS STATED IN THE SCOPE OF WORK |
| | THAT THE 20KW GENERATOR AND 100AMP ATS WILL BE REAPLCED |
| | WITH A 48 KW GENERATOR AND A 400AMP ATS. HOWEVER THE |
| | RISER DIAGRAM ILLUSTRATES THE USE OF TWO 200AMP ATS'S |
| | NOT ONE 40AMP ATS. CLARIFICATION REQUIRED. |
| | |
| | 3) THE GROUNDING ELECTRODE CONDUCTOR ILLUSTRATED ON THE |
| | PLAN INDICATES THE USE OF A #3CU CONDUCTOR. NEC 250.66 |
| | IS THE SECTION USED FOR THIS SELECTION. IN THIS ARTICLE |
| | IT STATES IN ORDER TO DETERMINE THE CORRECT SIZE OF |
| | CONDUCTOR FOR USE AS A GROUDING ELECTRODE CONDUCTOR YOU |
| | NEED TO KNOW THE SIZE OF THE SERVICE ENTRANCE |
| | CONDUSTOR. THE SERVICE ENTRANCE CONDUCTOR IS NOT |
| | ILLUSTRATED OR INDICATED ON THE PLANS SUBMITTED. REVISE |
| | THE RISER DIGRAM TO INDICATE THE SIZE OF THE SERVICE |
| | ENTRANCE CONDUCTORS. |
| | |
| | 4) ALL INFORMATION, DRAWINGS, SPECIFICATIONS AND |
| | ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE OF |
| | THE PERSON RESPONSIBLE FOR THE DESIGN. WPB AMENDMENTS |
| | TO FBC 107.2.1 |
| | PROVIDE THE NAME AND SIGNATURE OF THE PERSON |
| | RESPONSIBLE FOR THE DEIGN. SEE FBC 107.2.1 ABOVE. |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. SEE LINK: |
| | HTTP://WPB.ORG/DEVELOPMENT |
| | /WP-CONTENT/UPLOADS/SITES/33/2013/09/APPLICATION_RESUBM |
| | ITTAL_FORM_04132010.PDF |
| | |
| | ADDITIONALLY, PLEASE INSERT CORRECTED PAGES INTO |
| | SUBMITTAL PACKAGE AND LEAVE THE PREVIOUSLY REVIEWED |
| | SHEETS FOR COMPARATIVE REVIEW. |
| | |
| | DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, |
| | 561-805-6717 OR [email protected] |
| | |