Plan Review Details - Permit 14070978
| Plan Review Stops For Permit 14070978 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2014-08-27 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2014-08-27 |
Time |
08:07 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2014-08-27 |
Time |
07:42 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2014-08-04 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2014-08-04 |
Time |
08:31 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2014-08-04 |
Time |
06:35 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2014-09-16 |
|
|
Cont ID |
|
| Sent By |
dhayes |
Date |
2014-09-16 |
Time |
14:43 |
Rev Time |
0.00 |
| Received By |
dhayes |
Date |
2014-09-16 |
Time |
14:43 |
Sent To |
P |
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
F |
Date |
2014-09-03 |
|
|
Cont ID |
|
| Sent By |
dhayes |
Date |
2014-09-03 |
Time |
13:56 |
Rev Time |
0.00 |
| Received By |
dhayes |
Date |
2014-09-03 |
Time |
13:56 |
Sent To |
|
|
| Notes |
| 2014-09-03 14:20:26 | DATE: 9/3/2014 | | | PROJECT: SUSHI YAMA | | | PERMIT#: 14070978 | | | CODE: 2008 EDITION OF THE NEC | | | 2010 EDITION OF THE FBC | | | 2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1, | | | ADMINISTRATION, 2012 FBC SUPPLEMENTS. | | | | | | 2ND ELECTRICAL PLAN REVIEW | | | ACTION: DENIED | | | | | | DUPLICATE COMMENTS. | | | | | | 1) PROVIDE POWER RISER DIAGRAM INDICATING THE LOCATION | | | OF THE ELECTRICAL SERVICE ON THE BUILDING AND THE SIZE | | | OF THE DISCONNECTS AND FEEDERS. | | | | | | 2) PROVIDE SAFETY LABELING FOR ARC FLASH PROTECTION FOR | | | THE PANEL BOARDS AND MAIN DISCONNECTING MEANS. NEC | | | 110.16, 110.22 | | | | | | 3) VERIFY THE ELECTRICAL SERVICE DISCONNECTING MEANS | | | HAS A FAULT CURRENT RATING THAT IS SUFFICIENT AT | | | NOMINAL CIRCUIT VOLTAGE FOR THE CURRENT THAT MUST BE | | | INTERRUPTED. NEC 110.9 | | | | | | 4) PROVIDE LOAD CALCULATIONS ARE REQUIRED FOR THE | | | BUILDING ELECTRICAL SYSTEM BASED ON THE NEC ARTICLE | | | 220. FBC 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS | | | | | | 5) INDICATE LOCATIONS OF CIRCUITRY AND DISCONNECTS FOR | | | AIR CONDITIONING AND REFRIGERATION EQUIPMENT. | | | | | | 6) GFI SERVICE OUTLETS REQUIRED FOR MECHANICAL | | | EQUIPMENT. THE RECEPTACLE SHALL BE LOCATED ON THE SAME | | | LEVEL AND WITHIN 25FT OF THE HEATING, AIR-CONDITIONING, | | | AND REFRIGERATION EQUIPMENT. SEE NEC 210.63, | | | 210.8(A)(3), AND 406.8(B)(1), | | | | | | 7) INDICATE THE FIRE SUPRESSION SYSTEM FOR THE KITCHEN | | | HOOD. INDICATE HOW THE SYSTEM OPERATES WHAT IS THE | | | SEQUESNCE OF EVENTS UPON ACTIVATION. | | | | | | 8) PROVIDE SEPARATE ELECTRICAL PERMIT APPLICATIONS | | | ACCOMPANIED BY MANUFACTURERS EQUIPMENT SUBMITTALS, | | | PLANS, AND SHOP DRAWINGS AS REQUIRED FOR: KITCHEN HOOD | | | FIRE SUPRESSION, FIRE ALARM, SECURITY, CCTV, DATA/COM, | | | NETWORK, STRUCTURED CABLING, AUDIO/VIDEO, AND SIGNAGE. | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. SEE LINK: | | | HTTP://WPB.ORG/DEVELOPMENT | | | /WP-CONTENT/UPLOADS/SITES/33/2013/09/APPLICATION_RESUBM | | | ITTAL_FORM_04132010.PDF | | | | | | ADDITIONALLY, PLEASE INSERT CORRECTED PAGES INTO | | | SUBMITTAL PACKAGE AND LEAVE THE PREVIOUSLY REVIEWED | | | SHEETS FOR COMPARATIVE REVIEW. | | | | | | DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, | | | 561-805-6717 OR [email protected] | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2014-08-12 |
|
|
Cont ID |
|
| Sent By |
dhayes |
Date |
2014-08-12 |
Time |
14:01 |
Rev Time |
0.00 |
| Received By |
dhayes |
Date |
2014-08-12 |
Time |
12:08 |
Sent To |
|
|
| Notes |
| 2014-08-12 14:01:32 | DATE: 8/6/2014 | | | PROJECT: SUSHI YAMA | | | PERMIT#: 14070978 | | | CODE: 2008 EDITION OF THE NEC | | | 2010 EDITION OF THE FBC | | | 2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1, | | | ADMINISTRATION, 2012 FBC SUPPLEMENTS. | | | | | | 1ST ELECTRICAL PLAN REVIEW | | | ACTION: DENIED | | | | | | 1) CONSTRUCTION DOCUMENTS SHALL BE OF SUFFICIENT | | | CLARITY TO INDICATE THE LOCATION, NATURE AND EXTENT OF | | | THE WORK PROPOSED AND SHOW IN DETAIL THAT IT WILL | | | CONFORM TO THE PROVISIONS OF THIS CODE AND RELEVANT | | | LAWS, ORDINANCES, RULES AND REGULATIONS, AS DETERMINED | | | BY THE BUILDING OFFICIAL. FBC 107.2.1 PLEASE PROVIDE | | | ADDITIONAL DETAIL TO THE PLANS AS FOLLOWS: | | | | | | 2) PROVIDE ALLL CIRCUITRY ON THE FLOOR PLAN AND PANEL | | | SCHEDULE, INCLUDE THE EXISTING OUTLETS, AND AS WELL AS | | | THE NEW OUTLETS AND DISCONNECTS AS REQUIRED TO MATCH | | | THE EQUIPMENT PLAN AS INDICATED ON SHEET 5. | | | | | | 3) PROVIDE POWER RISER DIAGRAM, AND THE LOCATION OF THE | | | ELECTRICAL SERVICE ON THE BUILDING. | | | | | | 4) PROVIDE SAFETY LABELING FOR ARC FLASH PROTECTION FOR | | | THE PANEL BOARDS AND MAIN DISCONNECTING MEANS. NEC | | | 110.16, 110.22 | | | | | | 5) VERIFY THE ELECTRICAL SERVICE DISCONNECTING MEANS | | | HAS A FAULT CURRENT RATING THAT IS SUFFICIENT AT | | | NOMINAL CIRCUIT VOLTAGE FOR THE CURRENT THAT MUST BE | | | INTERRUPTED. NEC 110.9 | | | | | | 6) PROVIDE LOAD CALCULATIONS ARE REQUIRED FOR THE | | | BUILDING ELECTRICAL SYSTEM BASED ON THE NEC ARTICLE | | | 220. FBC 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS | | | | | | 7) PROVIDE A LIGHTING PLAN, INDICATE ALL GENERAL | | | PURPOSE LIGHTING TASK LIGHTING, SPECIALTY LIGHTING, | | | SECURITY LIGHTING, EXIT AND EMERGENCY LIGHTING TO | | | COORDINATE WITH THE LIFE SAFETY PLAN. | | | | | | 8) INDICATE LOCATIONS OF CIRCUITRY AND DISCONNECTS FOR | | | AIR CONDITIONING AND REFRIGERATION EQUIPMENT. | | | | | | 9) GFI SERVICE OUTLETS REQUIRED FOR MECHANICAL | | | EQUIPMENT. THE RECEPTACLE SHALL BE LOCATED ON THE SAME | | | LEVEL AND WITHIN 25FT OF THE HEATING, AIR-CONDITIONING, | | | AND REFRIGERATION EQUIPMENT. SEE NEC 210.63, | | | 210.8(A)(3), AND 406.8(B)(1), | | | | | | 10) PROVIDE LIGHTING CONTROL. FBC-ENERGY | | | A. 505.2 LIGHTING CONTROLS (MANDATORY). | | | LIGHTING SYSTEMS SHALL BE PROVIDED WITH CONTROLS AS | | | REQUIRED IN SECTIONS 505.2.1, 505.2.2, 505.2.3 AND | | | 505.2.4. | | | AUTOMATIC LIGHTING SHUTOFF IS REQUIRED IN BUILDINGS | | | LARGER THAN 5,000 SQUARE FEET AND SHALL BE EQUIPPED | | | WITH AN AUTOMATIC CONTROL DEVICE TO SHUT OFF LIGHTING | | | IN THOSE AREAS. | | | | | | B. 505.2.4 EXTERIOR LIGHTING CONTROLS. | | | LIGHTING FOR ALL EXTERIOR APPLICATIONS NOT EXEMPTED IN | | | SECTION 505.1 SHALL HAVE AUTOMATIC CONTROLS CAPABLE OF | | | TURNING OFF EXTERIOR LIGHTING WHEN SUFFICIENT DAYLIGHT | | | IS AVAILABLE OR WHEN THE LIGHTING IS NOT REQUIRED | | | DURING NIGHTTIME HOURS. LIGHTING NOT DESIGNATED FOR | | | DUSK-TO-DAWN OPERATION SHALL BE CONTROLLED BY EITHER A | | | COMBINATION OF A PHOTOSENSOR AND A TIME SWITCH, OR AN | | | ASTRONOMICAL TIME SWITCH. | | | | | | 11) INDICATE THE FIRE SUPRESSION SYSTEM FOR THE KITCHEN | | | HOOD. INDICATE HOW THE SYSTEM OPERATES WHAT IS THE | | | SEQUESNCE OF EVENTS UPON ACTIVATION. WHAT IT CONTROLS | | | AND HOW IT CONTROLS IT. | | | | | | 12) PROVIDE SEPARATE ELECTRICAL PERMIT APPLICATIONS | | | ACCOMPANIED BY MANUFACTURERS EQUIPMENT SUBMITTALS, | | | PLANS, AND SHOP DRAWINGS AS REQUIRED FOR: KITCHEN HOOD | | | FIRE SUPRESSION, FIRE ALARM, SECURITY, CCTV, DATA/COM, | | | NETWORK, STRUCTURED CABLING, AUDIO/VIDEO, AND SIGNAGE. | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. SEE LINK: | | | HTTP://WPB.ORG/DEVELOPMENT | | | /WP-CONTENT/UPLOADS/SITES/33/2013/09/APPLICATION_RESUBM | | | ITTAL_FORM_04132010.PDF | | | | | | ADDITIONALLY, PLEASE INSERT CORRECTED PAGES INTO | | | SUBMITTAL PACKAGE AND LEAVE THE PREVIOUSLY REVIEWED | | | SHEETS FOR COMPARATIVE REVIEW. | | | | | | DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, | | | 561-805-6717 OR [email protected] | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2014-08-20 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2014-08-20 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2014-08-20 |
Time |
15:04 |
Sent To |
|
|
| Notes |
| 2014-08-20 15:17:42 | PREVIOUSLY SUBMITTED COMMENTS: | | | | | | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, | | | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | THE LIFE SAFETY SYSTEMS, FIRE ALARM AND/OR FIRE | | | SPRINKLER SHALL REMAIN ACTIVE THROUGHOUT THE | | | CONSTRUCTION PERIOD. | | | | | | DUE TO THE RENOVATIONS, AN EVALUATION OF THE FIRE ALARM | | | AND SPRINKLER SYSYEMS IS REQUIRED FOR CODE COMPLIANCE. | | | | | | ANY AND ALL WORK ON THE FIRE ALARM AND FIRE SPRINKLER | | | SYSTEMS SHALL BE DONE UNDER SEPARATE SHOP DRAWINGS AND | | | BY CERTIFIED LIFE SAFETY CONTRACTORS. | | | | | | ANY TIME THAT WORK ON THE LIFE SAFETY SYSTEMS, | | | SPRINKLER AND/OR FIRE ALARM, EXCEEDS 4 HOURS, A FIRE | | | WATCH SHALL BE IMPLEMENTED AND MAINTAINED UNTIL FULL | | | AND COMPLETE PROTECTION IS RETURNED. |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2014-07-30 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2014-07-30 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2014-07-30 |
Time |
12:33 |
Sent To |
|
|
| Notes |
| 2014-07-30 13:13:51 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, | | | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | THE LIFE SAFETY SYSTEMS, FIRE ALARM AND/OR FIRE | | | SPRINKLER SHALL REMAIN ACTIVE THROUGHOUT THE | | | CONSTRUCTION PERIOD. | | | | | | DUE TO THE RENOVATIONS, AN EVALUATION OF THE FIRE ALARM | | | AND SPRINKLER SYSYEMS IS REQUIRED FOR CODE COMPLIANCE. | | | | | | ANY AND ALL WORK ON THE FIRE ALARM AND FIRE SPRINKLER | | | SYSTEMS SHALL BE DONE UNDER SEPARATE SHOP DRAWINGS AND | | | BY CERTIFIED LIFE SAFETY CONTRACTORS. | | | | | | ANY TIME THAT WORK ON THE LIFE SAFETY SYSTEMS, | | | SPRINKLER AND/OR FIRE ALARM, EXCEEDS 4 HOURS, A FIRE | | | WATCH SHALL BE IMPLEMENTED AND MAINTAINED UNTIL FULL | | | AND COMPLETE PROTECTION IS RETURNED. | | | |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
2 |
Status |
P |
Date |
2014-08-27 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2014-08-27 |
Time |
08:07 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2014-08-27 |
Time |
07:43 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2014-08-04 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2014-08-04 |
Time |
07:35 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2014-08-04 |
Time |
06:35 |
Sent To |
|
|
| Notes |
| 2014-08-04 07:35:18 | GAS PLAN REVIEW | | | PERMIT: 14070978 | | | ADD: 330 CLEMATIS ST #107 | | | CONT: SCALTEC USA CORP | | | TEL: (561)922-1888 | | | | | | 2010 FLORIDA BUILDING CODE W | | | * 2010 WEST PALM BEACH AMENDMENTS TO THE FLORIDA | | | BUILDING CODE, CHAPTER 1, ADMINISTRATION, 2010 EDITION | | | 2012 FBC SUPPLEMENTS ADOPTED APRIL 25/2013. | | | | | | 2010 EXISTING BUILDING CODE LEVEL II 701.3 | | | COMPLIANCE. ALL NEW CONSTRUCTION ELEMENTS, COMPONENTS, | | | SYSTEMS, AND SPACES SHALL COMPLY WITH THE REQUIREMENTS | | | OF THE FLORIDA BUILDING CODE, BUILDING. | | | | | | 1STREVIEW | | | DATE: MON. AUG. 04/ 2014 | | | ACTION: DENIED | | | | | | SHEET 5 LIST GAS APPLIANCES, NO OTHER INFORMATION WAS | | | PROVIDED FOR REVIEW. A SEPARATE GAS PERMIT WIL BE | | | REQUIRED. GAS PERMIT APPLICATION REQUIREMENTS, | | | EFFECTIVE IMMEDIATELY THE FOLLOWING INFORMATION SHALL | | | BE SHOWN ON ALL GAS DRAWINGS SUBMITTED FOR PERMITTING | | | IN THE CITY OF WEST PALM BEACH: | | | | | | 1. SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS ALL | | | CUT SECTIONS OF PIPE AND CORRESPONDING LENGTHS PER | | | FBC-2010 FUEL GAS. | | | | | | 2. SHOW TYPE OF PIPING MATERIAL BEING INSTALLED, ALL | | | PIPE SIZES, AND THE EDH NUMBER OF CORRUGATED STAINLESS | | | STEEL TUBING FOR EACH PIPE SIZE IF BEING USED. | | | | | | 3. TYPE OF GAS, (LP OR NATURAL). | | | | | | 4. BTU LOAD OF EACH APPLIANCE AND THE TOTAL BTU LOAD ON | | | THE SYSTEM. REFER TO THE FBC-2010 FUEL GAS SECS. 401.8 | | | THRU 402.6.1 AND TABLES 402.4(1) THRU 402.4(35) | | | | | | 5. SHOW THE DISTANCE FROM THE POINT OF DELIVERY, | | | (METER), TO THE MOST REMOTE OUTLET IN THE BUILDING | | | AND/OR SYSTEM PER THE FBC-2010 FUEL GAS APPENDIX A ? | | | USE OF CAPACITY SECTION A.3.1(4) | | | | | | 6. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE | | | FBC-2010 FUEL GAS CODE SEC. 304 | | | | | | 7. INDICATE THE DELIVERY PRESSURE (PSI) PER FBC-2010 | | | FUEL GAS SEC. 402.2. IF NATURAL GAS SPECIFY .5 PSI OR 2 | | | PSI. | | | | | | 8. SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE AND | | | TERMINATION OF THE GAS VENTS PER FBC-2010 FUEL GAS CODE | | | SEC. 502 THRU 505. | | | | | | 9. SUBMIT MANUFACTURE SHEETS FOR ALL GAS EQUIPMENT TO | | | VERIFY COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND | | | FBC-2010 FUEL GAS SEC. 402.2 | | | | | | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & | | | REMOVE & REPLACE ANY PAGES AS NECESSARY. A TRANSMITTAL | | | LETTER LISTING THE ORIGINAL REVIEW COMMENT NUMBER, WITH | | | A DESCRIPTION OF THE REVISION MADE, IDENTIFYING THE | | | SHEET OR SPECIFICATION PAGE WHERE THE CHANGES CAN BE | | | FOUND WILL HELP TO EXPEDITE YOUR PERMIT. THANK YOU FOR | | | YOUR ANTICIPATED COOPERATION. | | | | | | JAMES A. WITMER CBO | | | SENIOR COMMERCIAL COMBINATION PLANS EXAMINER | | | TEL: 561-805-6715 | | | FAX: 561-805-6676 | | | E-MAIL: [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2014-09-19 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2014-09-19 |
Time |
09:44 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2014-09-18 |
Time |
07:00 |
Sent To |
|
|
| Notes |
| 2014-09-19 09:48:07 | 9/19/14- APPROVED/OUT FRONT UNDER LARGE "S". TKL. | | 2014-09-19 07:01:34 | SENT TO T LARGE. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2014-09-18 |
Time |
|
Rev Time |
0.00 |
| Received By |
dhayes |
Date |
2014-09-16 |
Time |
14:43 |
Sent To |
E |
|
| Notes |
| 2014-09-18 12:14:06 | 9/18/14-DENIED- E-MAOLED CONTRACTOR/PLANS PLACED UNDER | | | LARGE "S". TKL. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2014-09-03 |
|
|
Cont ID |
|
| Sent By |
dhayes |
Date |
2014-09-03 |
Time |
13:57 |
Rev Time |
0.00 |
| Received By |
dhayes |
Date |
2014-08-19 |
Time |
14:40 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2014-08-12 |
|
|
Cont ID |
|
| Sent By |
dhayes |
Date |
2014-08-12 |
Time |
14:01 |
Rev Time |
0.00 |
| Received By |
dhayes |
Date |
2014-07-25 |
Time |
10:27 |
Sent To |
|
|
| Notes |
| 2014-07-28 10:27:30 | SENT TO B11 SHELF FOR REVIEW. JG. |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2014-08-26 |
Time |
|
Rev Time |
1.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2014-08-26 15:04:26 | ANSUL PERMIT AND TESTING REQUIRED |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2014-08-04 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2014-08-04 |
Time |
08:36 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2014-08-04 |
Time |
08:36 |
Sent To |
|
|
| Notes |
| 2014-08-04 09:01:02 | MECHANICAL PLAN REVIEW | | | PERMIT: 14070978 | | | ADD: 330 CLEMATIS ST #107 | | | CONT: SCALTEC USA CORP | | | TEL: (561)922-1888 | | | | | | 2010 FLORIDA BUILDING CODE W | | | * 2010 WEST PALM BEACH AMENDMENTS TO THE FLORIDA | | | BUILDING CODE, CHAPTER 1, ADMINISTRATION, 2010 EDITION | | | 2012 FBC SUPPLEMENTS ADOPTED APRIL 25/2013. | | | | | | 2010 EXISTING BUILDING CODE LEVEL II 701.3 | | | COMPLIANCE. ALL NEW CONSTRUCTION ELEMENTS, COMPONENTS, | | | SYSTEMS, AND SPACES SHALL COMPLY WITH THE REQUIREMENTS | | | OF THE FLORIDA BUILDING CODE, BUILDING. | | | | | | 1STREVIEW | | | DATE: MON. AUG. 04/ 2014 | | | ACTION: DENIED | | | | | | 1) NO MECHANICAL SHEETS PROVIDED, SHEET # 1 DOES HAVE | | | MECHANICAP NOTES, SHEET # 5 NOTES 11 & 20 INDICATE A | | | ANSUL SYSTEM AND TYPE I HOOD, NO INFORMATION AS TO MAKE | | | UP AIR FOR THE NEW GAS APPLIANCES, ... 2010 FBC-FUEL | | | GAS SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE | | | FBC-2010 FUEL GAS CODE SEC. 304S. | | | | | | 2) 2010 FBC-M. 420.3.14.13 SPACES HAVING EXHAUST HOODS | | | SHALL HAVE SUFFICIENT MAKE-UP SUPPLY AIR SUCH THAT THE | | | REQUIRED PRESSURE RELATIONSHIP WILL NOT BE AFFECTED BY | | | THE OPERATION OF THE HOOD. 503.2.5.2.2.1 | | | NON-RESIDENTIAL KITCHEN SPACES. | | | NON-RESIDENTIAL KITCHEN SPACE AND AREAS IN DINING ROOMS | | | OR OPEN MALLS WHERE A KITCHEN EXHAUST HOOD IS REQUIRED | | | BY NFPA 96 SHALL COMPLY WITH THE FOLLOWING | | | REQUIREMENTS: | | | 1. BE DESIGNED WITH AN EXHAUST AIR AND MAKE UP AIR | | | BALANCE SUCH THAT THE SPACE IS NEVER UNDER A POSITIVE | | | PRESSURE, AND NEVER UNDER A NEGATIVE PRESSURE EXCEEDING | | | 0.02 INCH W.G. RELATIVE TO ALL INDOOR SPACES | | | SURROUNDING THE KITCHEN SPACE, DURING ALL COOKING | | | HOURS. | | | | | | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & | | | REMOVE & REPLACE ANY PAGES AS NECESSARY. A TRANSMITTAL | | | LETTER LISTING THE ORIGINAL REVIEW COMMENT NUMBER, WITH | | | A DESCRIPTION OF THE REVISION MADE, IDENTIFYING THE | | | SHEET OR SPECIFICATION PAGE WHERE THE CHANGES CAN BE | | | FOUND WILL HELP TO EXPEDITE YOUR PERMIT. THANK YOU FOR | | | YOUR ANTICIPATED COOPERATION. | | | | | | JAMES A. WITMER CBO | | | SENIOR COMMERCIAL COMBINATION PLANS EXAMINER | | | TEL: 561-805-6715 | | | FAX: 561-805-6676 | | | E-MAIL: [email protected] |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
4 |
Status |
P |
Date |
2014-09-19 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2014-09-19 |
Time |
09:43 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2014-09-19 |
Time |
09:43 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
F |
Date |
2014-09-18 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2014-09-18 |
Time |
12:02 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2014-09-17 |
Time |
06:12 |
Sent To |
|
|
| Notes |
| 2014-09-18 12:08:48 | 1) THE CALCULATIONS YOU HAVE PROVIDED FOR THE SIZING OF | | | THE GREASE INTERCEPTOR ARE INADEQUATE. THE GALLONS OF | | | WASTE PER SEAT THAT YOU HAVE USED (10 GALS.) IS | | | INADEQUATE. YOU WILL NEED TO USE A FACTOR OF 25 GALS. | | | OER SEAT. THIS WILL REQUIRE 2-1200 GALLON TANKS IN | | | SERIES TO COMPLY. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
F |
Date |
2014-08-27 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2014-08-27 |
Time |
08:32 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2014-08-27 |
Time |
07:43 |
Sent To |
|
|
| Notes |
| 2014-08-27 08:32:54 | PLUMBING PLAN REVIEW | | | PERMIT: 14070978 | | | ADD: 330 CLEMATIS ST #107 | | | CONT: SCALTEC USA CORP | | | TEL: (561)922-1888 | | | | | | 2010 FLORIDA BUILDING CODE W | | | * 2010 WEST PALM BEACH AMENDMENTS TO THE FLORIDA | | | BUILDING CODE, CHAPTER 1, ADMINISTRATION, 2010 EDITION | | | 2012 FBC SUPPLEMENTS ADOPTED APRIL 25/2013. | | | | | | 2010 EXISTING BUILDING CODE LEVEL II 701.3 | | | COMPLIANCE. ALL NEW CONSTRUCTION ELEMENTS, COMPONENTS, | | | SYSTEMS, AND SPACES SHALL COMPLY WITH THE REQUIREMENTS | | | OF THE FLORIDA BUILDING CODE, BUILDING. | | | | | | 2ND EVIEW | | | DATE: WED. AUG. 27/ 2014 | | | ACTION: DENIED | | | | | | NOTICE: CHAPTER 553.80(2)(B) FLORIDA STATUTES STATES | | | THAT A LOCAL GOVERNMENT SHALL IMPOSE A FEE OF FOUR | | | TIMES THE FEE FOR PLAN REVIEW, IF PLANS ARE REJECTED | | | (3) OR MORE TIMES FOR REPEATED FAILURE TO CORRECT A | | | CODE VIOLATION. | | | | | | 1)2ND REQUEST. SHEET 7 GREASY WASTE ISOMETRIC. SHOW THE | | | COMPLETE GREASY WASTE NO BREAK LINES, ALSO SHOW WHAT IS | | | BEING ELIMINATED FROM THE GREASY WASTE SYSTEM.IS THE | | | COMPLETE GREASY WASTE INTERCEPTOR ABOVE GROUND, BELOW | | | GROUND, PROVIDE SIZING OF THE EXISTING GREASE | | | INTERCEPTOR, FLOW CONTROL DEVICE AND VENTING 2010 FBC-P | | | 1003.3.4.1 & 1003.3.4.2. | | | MISSING IN THE WASH UP ROOM (3) COMPARTMENT | | | SINK,SERVICE SINK, HAND SINK AND DISHWASHER AND THE (1) | | | REMAINING TRENCH DRAIN UNDER THE 3 COMPARMENT SINK. | | | 2010 FBC-P 003.3.1 GREASE INTERCEPTORS AND AUTOMATIC | | | GREASE REMOVAL DEVICES REQUIRED. A GREASE INTERCEPTOR | | | OR AUTOMATIC GREASE REMOVAL DEVICE SHALL BE REQUIRED TO | | | RECEIVE THE DRAINAGE FROM FIXTURES AND EQUIPMENT WITH | | | GREASE-LADEN WASTE LOCATED IN FOOD PREPARATION AREAS, | | | SUCH AS IN RESTAURANTS. FIXTURES AND EQUIPMENT SHALL | | | INCLUDE POT SINKS, PRERINSE SINKS; SOUP KETTLES OR | | | SIMILAR DEVICES;WOK STATIONS; FLOOR DRAINS OR SINKS | | | INTO WHICH KETTLES ARE DRAINED; AUTOMATIC HOOD WASH | | | UNITS AND DISHWASHERS WITHOUT PRERINSE SINKS.GREASE | | | INTERCEPTORS AND AUTOMATIC GREASE REMOVAL DEVICES SHALL | | | RECEIVE WASTE ONLY FROM FIXTURES AND EQUIPMENT THAT | | | ALLOW FATS, OILS OR GREASE TO BE DISCHARGED. | | | | | | 2) 2ND REQUEST MISSING REQUIRED FIXTURES. SHEET 7 | | | PLEASE PROVIDE THE FORMULA USED FOR SIZING OF THE | | | EXISTING GREASE INTERCEPTOR. GREASE INTERCEPTOR SHALL | | | BE DESIGNED UNDER THE 2010 FBC-PLUMBING CODE SECTION | | | 1003.3.4 TOTAL FLOW RATE WITH RATE OF FLOW CONTROL | | | (1003.3.4.2) OR FOR CONCRETE VAULT TYPE INTERCEPTORS | | | (TABLE 1003.5.1). | | | | | | THE CITY FOG INSPECTORS (FATS, OILS & GREASE) MONITOR | | | ALL GREASE INTERCEPTORS TO VERIFY COMPLIANCE WITH THE | | | CITY?S MUNI CODE SEC. 90-126. PROHIBITIONS AND | | | LIMITATIONS OF DISCHARGE.(7) MINERAL OIL IN EXCESS OF | | | 50 MG/L OR ANIMAL/VEGETABLE FATS, WAX, GREASE, OR OILS | | | IN EXCESS OF 100 MG/L, WHETHER EMULSIFIED OR NOT; OR | | | SUBSTANCES WHICH MAY SOLIDIFY OR BECOME VISCOUS AT | | | TEMPERATURES LOWER THAN OR EQUAL TO 150 DEGREES | | | FAHRENHEIT (65.56 DEGREES CELSIUS). | | | | | | 3) THE GREASY WASTE ISOMETRIC SHOWS HAND SINKS, 3 | | | COMPARTMENT SINKS TIED IN DIRECTLY TO THE GREASY WASTE | | | SANITARY. PLEASE REVIEW 2010 FBC-P 02.1 WHERE REQUIRED. | | | FOOD-HANDLING EQUIPMENT AND CLEAR-WATER WASTE SHALL | | | DISCHARGE THROUGH AN INDIRECT WASTE PIPE AS SPECIFIED | | | IN SECTIONS 802.1.1 THROUGH 802.1.8. | | | | | | 802.1.1 FOOD HANDLING. EQUIPMENT AND FIXTURES UTILIZED | | | FOR THE STORAGE, PREPARATION AND HANDLING OF FOOD SHALL | | | DISCHARGE THROUGH AN INDIRECT WASTE PIPE BY MEANS OF AN | | | AIR GAP. | | | | | | 02.1.7 COMMERCIAL DISHWASHING MACHINES. THE DISCHARGE | | | FROM A COMMERCIAL DISHWASHING MACHINE SHALL BE THROUGH | | | AN AIR GAP OR AIR BREAK INTO A STANDPIPE OR WASTE | | | RECEPTOR IN ACCORDANCE WITH SECTION 802.2. | | | | | | 802.1.8 FOOD UTENSILS, DISHES, POTS AND PANS SINKS. | | | SINKS USED FOR THE WASHING, RINSING OR SANITIZING OF | | | UTENSILS, DISHES, POTS, PANS OR SERVICEWARE USED IN THE | | | PREPARATION, SERVING OR EATING OF FOOD SHALL DISCHARGE | | | INDIRECTLY THROUGH AN AIR GAP OR AN AIR BREAK OR | | | DIRECTLY CONNECT TO THE DRAINAGE SYSTEM. | | | | | | 4) PROVISO: BE VARIFIED IN FIELD!!!! SHEET 7 SHOWS (3) | | | COMPARTMENT SINKS, HAND SINKS, DISHWASHER WASTE(NOT | | | SHOWN) WITH NO TRAPS. PLEASE REVIEW 2010 FBC-P 802.2 | | | INSTALLATION. ALL INDIRECT WASTE PIPING SHALL DISCHARGE | | | THROUGH AN AIR GAP OR AIR BREAK INTO A WASTE RECEPTOR | | | OR STANDPIPE. WASTE RECEPTORS AND STANDPIPES SHALL BE | | | TRAPPED AND VENTED AND SHALL CONNECT TO THE BUILDING | | | DRAINAGE SYSTEM. ALL INDIRECT WASTE PIPING THAT EXCEEDS | | | 2 FEET (610 MM) IN DEVELOPED LENGTH MEASURED | | | HORIZONTALLY, OR 4 FEET (1219 MM) IN TOTAL DEVELOPED | | | LENGTH, SHALL BE TRAPPED. | | | | | | 5) 2ND REQUEST. THE PLANS DO NOT PROVIDE ANY PLANS FOR | | | POTABLE WATER OR THE HOOK UP OF ANY APPLIANCES | | | REQUIRING POTABLE WATER. ICE MACHINES, ICE CHEST WHICH | | | REQUIRE INDIRECT WASTE AND COMPLIANCE TO WITH 802.1.3 | | | POTABLE CLEAR-WATER WASTE. DISCHARGE POTABLE WATER TO | | | THE BUILDING DRAINAGE SYSTEM, THE DISCHARGE SHALL BE | | | THROUGH AN INDIRECT WASTE PIPE BY MEANS OF AN AIR GAP. | | | | | | 6) 2ND REQUEST. THE PLANS DO NOT PROVIDE ANY PLANS FOR | | | POTABLE WATER OR THE HOOK UP OF ANY APPLIANCES | | | REQUIRING POTABLE WATER: | | | SEE THE 2010 FBC-P: | | | 608.3 DEVICES, APPURTENANCES, APPLIANCES AND APPARATUS. | | | ALL DEVICES, APPURTENANCES, APPLIANCES AND APPARATUS | | | INTENDED TO SERVE STORAGE OF ICE OR FOODS, AND THAT | | | CONNECT TO THE WATER SUPPLY SYSTEM, SHALL BE PROVIDED | | | WITH PROTECTION AGAINST BACKFLOW AND CONTAMINATION OF | | | THE WATER SUPPLY SYSTEM. | | | 608.16.10 COFFEE MACHINES AND NONCARBONATED BEVERAGE | | | DISPENSERS. | | | THE WATER SUPPLY CONNECTION TO COFFEE MACHINES AND | | | NONCARBONATED BEVERAGE DISPENSERS SHALL BE PROTECTED | | | AGAINST BACKFLOW BY A BACKFLOW PREVENTER CONFORMING TO | | | ASSE 1022 OR BY AN AIR GAP. | | | | | | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & | | | REMOVE & REPLACE ANY PAGES AS NECESSARY. A TRANSMITTAL | | | LETTER LISTING THE ORIGINAL REVIEW COMMENT NUMBER, WITH | | | A DESCRIPTION OF THE REVISION MADE, IDENTIFYING THE | | | SHEET OR SPECIFICATION PAGE WHERE THE CHANGES CAN BE | | | FOUND WILL HELP TO EXPEDITE YOUR PERMIT. THANK YOU FOR | | | YOUR ANTICIPATED COOPERATION. | | | | | | JAMES A. WITMER CBO | | | SENIOR COMMERCIAL COMBINATION PLANS EXAMINER | | | TEL: 561-805-6715 | | | FAX: 561-805-6676 | | | E-MAIL: [email protected] | | | | | | | | | | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2014-08-04 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2014-08-04 |
Time |
08:31 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2014-08-04 |
Time |
06:36 |
Sent To |
|
|
| Notes |
| 2014-08-04 08:31:29 | PLUMBING PLAN REVIEW | | | PERMIT: 14070978 | | | ADD: 330 CLEMATIS ST #107 | | | CONT: SCALTEC USA CORP | | | TEL: (561)922-1888 | | | | | | 2010 FLORIDA BUILDING CODE W | | | * 2010 WEST PALM BEACH AMENDMENTS TO THE FLORIDA | | | BUILDING CODE, CHAPTER 1, ADMINISTRATION, 2010 EDITION | | | 2012 FBC SUPPLEMENTS ADOPTED APRIL 25/2013. | | | | | | 2010 EXISTING BUILDING CODE LEVEL II 701.3 | | | COMPLIANCE. ALL NEW CONSTRUCTION ELEMENTS, COMPONENTS, | | | SYSTEMS, AND SPACES SHALL COMPLY WITH THE REQUIREMENTS | | | OF THE FLORIDA BUILDING CODE, BUILDING. | | | | | | 1STREVIEW | | | DATE: MON. AUG. 04/ 2014 | | | ACTION: DENIED | | | | | | 1) SHEET 7 SHOWS THE GREASY WASTE ISOMETRIC, PLEASE | | | SHOW THE COMPLETE GREASY WASTE TO THE GREASE | | | INTERCEPTOR, MISSING THE WASH UP ROOM WITH (3) | | | COMPARTMENT SINK,SERVICE SINK, HAND SINK AND | | | DISHWASHER. 2010 FBC-P 003.3.1 GREASE INTERCEPTORS AND | | | AUTOMATIC GREASE REMOVAL DEVICES REQUIRED. A GREASE | | | INTERCEPTOR OR AUTOMATIC GREASE REMOVAL DEVICE SHALL BE | | | REQUIRED TO RECEIVE THE DRAINAGE FROM FIXTURES AND | | | EQUIPMENT WITH GREASE-LADEN WASTE LOCATED IN FOOD | | | PREPARATION AREAS, SUCH AS IN RESTAURANTS. FIXTURES AND | | | EQUIPMENT SHALL INCLUDE POT SINKS, PRERINSE SINKS; SOUP | | | KETTLES OR SIMILAR DEVICES;WOK STATIONS; FLOOR DRAINS | | | OR SINKS INTO WHICH KETTLES ARE DRAINED; AUTOMATIC HOOD | | | WASH UNITS AND DISHWASHERS WITHOUT PRERINSE | | | SINKS.GREASE INTERCEPTORS AND AUTOMATIC GREASE REMOVAL | | | DEVICES SHALL RECEIVE WASTE ONLY FROM FIXTURES AND | | | EQUIPMENT THAT ALLOW FATS, OILS OR GREASE TO BE | | | DISCHARGED. | | | | | | 2) SHEET 7 PLEASE PROVIDE THE FORMULA USED FOR SIZING | | | OF THE EXISTING GREASE INTERCEPTOR. GREASE INTERCEPTOR | | | SHALL BE DESIGNED UNDER THE 2010 FBC-PLUMBING CODE | | | SECTION 1003.3.4 TOTAL FLOW RATE WITH RATE OF FLOW | | | CONTROL (1003.3.4.2) OR FOR CONCRETE VAULT TYPE | | | INTERCEPTORS (TABLE 1003.5.1). | | | | | | THE CITY FOG INSPECTORS (FATS, OILS & GREASE) MONITOR | | | ALL GREASE INTERCEPTORS TO VERIFY COMPLIANCE WITH THE | | | CITY?S MUNI CODE SEC. 90-126. PROHIBITIONS AND | | | LIMITATIONS OF DISCHARGE.(7) MINERAL OIL IN EXCESS OF | | | 50 MG/L OR ANIMAL/VEGETABLE FATS, WAX, GREASE, OR OILS | | | IN EXCESS OF 100 MG/L, WHETHER EMULSIFIED OR NOT; OR | | | SUBSTANCES WHICH MAY SOLIDIFY OR BECOME VISCOUS AT | | | TEMPERATURES LOWER THAN OR EQUAL TO 150 DEGREES | | | FAHRENHEIT (65.56 DEGREES CELSIUS). | | | | | | 3) THE GREASY WASTE ISOMETRIC SHOWS HAND SINKS, 3 | | | COMPARTMENT SINKS TIED IN DIRECTLY TO THE GREASY WASTE | | | SANITARY. PLEASE REVIEW 2010 FBC-P 02.1 WHERE REQUIRED. | | | FOOD-HANDLING EQUIPMENT AND CLEAR-WATER WASTE SHALL | | | DISCHARGE THROUGH AN INDIRECT WASTE PIPE AS SPECIFIED | | | IN SECTIONS 802.1.1 THROUGH 802.1.8. | | | | | | 802.1.1 FOOD HANDLING. EQUIPMENT AND FIXTURES UTILIZED | | | FOR THE STORAGE, PREPARATION AND HANDLING OF FOOD SHALL | | | DISCHARGE THROUGH AN INDIRECT WASTE PIPE BY MEANS OF AN | | | AIR GAP. | | | | | | 02.1.7 COMMERCIAL DISHWASHING MACHINES. THE DISCHARGE | | | FROM A COMMERCIAL DISHWASHING MACHINE SHALL BE THROUGH | | | AN AIR GAP OR AIR BREAK INTO A STANDPIPE OR WASTE | | | RECEPTOR IN ACCORDANCE WITH SECTION 802.2. | | | | | | 802.1.8 FOOD UTENSILS, DISHES, POTS AND PANS SINKS. | | | SINKS USED FOR THE WASHING, RINSING OR SANITIZING OF | | | UTENSILS, DISHES, POTS, PANS OR SERVICEWARE USED IN THE | | | PREPARATION, SERVING OR EATING OF FOOD SHALL DISCHARGE | | | INDIRECTLY THROUGH AN AIR GAP OR AN AIR BREAK OR | | | DIRECTLY CONNECT TO THE DRAINAGE SYSTEM. | | | | | | 4) SHEET 7 SHOWS (3) COMPARTMENT SINKS, HAND SINKS, | | | DISHWASHER WASTE(NOT SHOWN) WITH NO TRAPS. PLEASE | | | REVIEW 2010 FBC-P 802.2 INSTALLATION. ALL INDIRECT | | | WASTE PIPING SHALL DISCHARGE THROUGH AN AIR GAP OR AIR | | | BREAK INTO A WASTE RECEPTOR OR STANDPIPE. WASTE | | | RECEPTORS AND STANDPIPES SHALL BE TRAPPED AND VENTED | | | AND SHALL CONNECT TO THE BUILDING DRAINAGE SYSTEM. ALL | | | INDIRECT WASTE PIPING THAT EXCEEDS 2 FEET (610 MM) IN | | | DEVELOPED LENGTH MEASURED HORIZONTALLY, OR 4 FEET (1219 | | | MM) IN TOTAL DEVELOPED LENGTH, SHALL BE TRAPPED. | | | | | | 5) THE PLANS DO NOT PROVIDE ANY PLANS FOR POTABLE WATER | | | OR THE HOOK UP OF ANY APPLIANCES REQUIRING POTABLE | | | WATER. ICE MACHINES, ICE CHEST WHICH REQUIRE INDIRECT | | | WASTE AND COMPLIANCE TO WITH 802.1.3 POTABLE | | | CLEAR-WATER WASTE. DISCHARGE POTABLE WATER TO THE | | | BUILDING DRAINAGE SYSTEM, THE DISCHARGE SHALL BE | | | THROUGH AN INDIRECT WASTE PIPE BY MEANS OF AN AIR GAP. | | | | | | 6) THE PLANS DO NOT PROVIDE ANY PLANS FOR POTABLE WATER | | | OR THE HOOK UP OF ANY APPLIANCES REQUIRING POTABLE | | | WATER: | | | SEE THE 2010 FBC-P: | | | 608.3 DEVICES, APPURTENANCES, APPLIANCES AND APPARATUS. | | | ALL DEVICES, APPURTENANCES, APPLIANCES AND APPARATUS | | | INTENDED TO SERVE STORAGE OF ICE OR FOODS, AND THAT | | | CONNECT TO THE WATER SUPPLY SYSTEM, SHALL BE PROVIDED | | | WITH PROTECTION AGAINST BACKFLOW AND CONTAMINATION OF | | | THE WATER SUPPLY SYSTEM. | | | 608.16.10 COFFEE MACHINES AND NONCARBONATED BEVERAGE | | | DISPENSERS. | | | THE WATER SUPPLY CONNECTION TO COFFEE MACHINES AND | | | NONCARBONATED BEVERAGE DISPENSERS SHALL BE PROTECTED | | | AGAINST BACKFLOW BY A BACKFLOW PREVENTER CONFORMING TO | | | ASSE 1022 OR BY AN AIR GAP. | | | | | | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & | | | REMOVE & REPLACE ANY PAGES AS NECESSARY. A TRANSMITTAL | | | LETTER LISTING THE ORIGINAL REVIEW COMMENT NUMBER, WITH | | | A DESCRIPTION OF THE REVISION MADE, IDENTIFYING THE | | | SHEET OR SPECIFICATION PAGE WHERE THE CHANGES CAN BE | | | FOUND WILL HELP TO EXPEDITE YOUR PERMIT. THANK YOU FOR | | | YOUR ANTICIPATED COOPERATION. | | | | | | JAMES A. WITMER CBO | | | SENIOR COMMERCIAL COMBINATION PLANS EXAMINER | | | TEL: 561-805-6715 | | | FAX: 561-805-6676 | | | E-MAIL: [email protected] | | | | | | | | | | | | |
|
|
|