| 2014-08-04 13:14:41 | DATE: 8/4/2014 |
| | PROJECT: |
| | PERMIT#: |
| | CODE: 2008 EDITION OF THE NEC |
| | 2010 EDITION OF THE FBC |
| | 2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1, |
| | ADMINISTRATION, 2012 FBC SUPPLEMENTS. |
| | |
| | 1ST ELECTRICAL PLAN REVIEW |
| | ACTION: DENIED |
| | |
| | NOTE: CONSTRUCTION DOCUMENTS SHALL BE OF SUFFICIENT |
| | CLARITY TO INDICATE THE LOCATION, NATURE AND EXTENT OF |
| | THE WORK PROPOSED AND SHOW IN DETAIL THAT IT WILL |
| | CONFORM TO THE PROVISIONS OF THIS CODE AND RELEVANT |
| | LAWS, ORDINANCES, RULES AND REGULATIONS, AS DETERMINED |
| | BY THE BUILDING OFFICIAL. FBC 107.2.1 PLANS ARE TOO |
| | SMALL TO BE LEGIBLE. PROVIDE ENLARGED PLANS WITH |
| | ADDITIONAL DETAIL. ONLY ONE SET OF PLANS WAS SUBMITTED. |
| | TWO SETS ARE REQUIRED. ONE SET TO BE KEPT AS A FILE |
| | COPY AND ONE SET FOR THE APPLICANT. SEE NOTES BELOW FOR |
| | ADDITIONAL DETAIL REQUIRED: |
| | |
| | SHEET E-01. CLARIFICATION REQUIRED. FBC WPB AMENDMENTS. |
| | 107.3.2 |
| | |
| | 1) NOTE 6 CALL OUT A 400AMP ENCLOSED CIRCUIT BREAKER |
| | BUT THE LINE DIAGRAM INDICATES VIA NOTE 8 THAT THE |
| | WIRING FROM THE LOAD SIDE IS UNDERSIZED. IF THIS IS |
| | INFACT A LOAD CENTER AND NOT AN ENCLOSED CIRCUIT |
| | BREAKER PLEASE REVISE PLANS AND NOTES TO REFLECT A CODE |
| | COMPLIANT INSTLATION. |
| | 2) A PANEL SCHEDULE IS NEEDED FOR PANEL "A" NOTE 10 |
| | REFERS TO "SEE SCHEDULE" SCHEDULE IS REQUIRED TO |
| | INDICATE CIRCUITS TO A/C CU, WALL MOUNTED A/C UNIT. AND |
| | UPS. |
| | 3) A LOAD CALCULATION IS REQUIRED TO DETERMINE THE |
| | TOTAL CONNECTED LOAD AT THE SERVICE. |
| | 4) PANEL A-1 APPEARS NEW BY WAY OF THE SOLID BLACK LINE |
| | IT IS DRAWN IN WITH. NO NOTES OR SCEDULES ASSOCIATED |
| | WITH PANEL "A-1" EXPLAIN. |
| | 5) SFRTA WPB UPS01 SCHEDULE HAS CONFLICTING |
| | INFORMATION. BY IT'S TITLE IT IS A 120V 100AMP MAIN |
| | BREAKER PANEL. HOWEVER IF YOU LOOK AT THE BUSS |
| | ARRANGEMENT IT APPEARS TO BE FED BY A 3PHASE 400AMP |
| | MAIN BREAKER. THERE ARE CIRCUITS IN THIS PANEL THAT ARE |
| | IDENTIFIED TO FEED THE EQUIPMENT RACK P1. THESE ARE |
| | 3PHASE RECEPTACLES ACCORDING TO THE INFORMATION ON |
| | SHEET E-03. |
| | |
| | SHEET E-02 |
| | |
| | 1) SEVERAL DETAILS ARE MISSING FROM THE "ONE LINE |
| | DIAGRAM". ADDITIONAL INFORMATION REQUIRED. |
| | 1A. SYSTEM OPERATING VOLTAGE. |
| | 1B. A FEEDER SCHEDULE INDICATING THE WIRE SIZES |
| | 1C. A GROUNDING DETAIL. |
| | |
| | 2) PROVIDE MANUFACTURER EQUIPMENT SPECIFICATIONS ON |
| | GENERATOR AND UPS |
| | 3) PROVIDE SEPARATE PLANS AND SPECIFICATIONS ON |
| | CONCRETE SLAB |
| | 4) PROVIDE A LOAD CALCULATION FOR THE TOTAL CONNECTED |
| | LOAD PROPOSED ON THE GENERATOR. SEE NEC 702.5 CAPACITY |
| | AND RATING BELOW: |
| | (A) AVAILABLE SHORT-CIRCUIT CURRENT. OPTIONAL STANDBY |
| | SYSTEM EQUIPMENT SHALL BE SUITABLE FOR THE MAXIMUM |
| | AVAILABLE SHORT-CIRCUIT CURRENT AT ITS TERMINALS. |
| | (B) SYSTEM CAPACITY. THE CALCULATIONS OF LOAD ON THE |
| | STANDBY SOURCE SHALL BE MADE IN ACCORDANCE WITH ARTICLE |
| | 220 OR BY ANOTHER APPROVED METHOD. |
| | AUTOMATIC TRANSFER EQUIPMENT. WHERE AUTOMATIC TRANSFER |
| | EQUIPMENT IS USED, AN OPTIONAL STANDBY SYSTEM SHALL |
| | COMPLY WITH (2)(A) OR (2)(B). |
| | (A) FULL LOAD. THE STANDBY SOURCE SHALL BE CAPABLE OF |
| | SUPPLYING THE FULL LOAD THAT IS TRANSFERRED BY THE |
| | AUTOMATIC TRANSFER EQUIPMENT. |
| | (B) LOAD MANAGEMENT. WHERE A SYSTEM IS EMPLOYED THAT |
| | WILL AUTOMATICALLY MANAGE THE CONNECTED LOAD, THE |
| | STANDBY SOURCE SHALL HAVE A CAPACITY SUFFICIENT TO |
| | SUPPLY THE MAXIMUM LOAD THAT WILL BE CONNECTED BY THE |
| | LOAD MANAGEMENT SYSTEM. |
| | |
| | SHEET E-03 |
| | 1) A REVISED PANEL SCHEDULE IS REQUIRED TO IDENTIFY THE |
| | CIRCUITRY TO EACH OF THE NEW OUTLETS. |
| | 2) IDENTIFY FM 200 |
| | 3) PROVIDE MANUFACTURER'S EQUIPMENT SPECIFICATIONS ON |
| | THE A/C WALL UNIT. |
| | 4) PROVIDE EQUIPMENT AND MOUNTING DETAIL SPECIFICATIONS |
| | ON GPS ANTENNA. |
| | 5) PROVIDE MANUFACTURERS EQUIPMENT SPECIFICATIONS ON |
| | THE UPS AND BATTERY CABINETS INCLUDING BATTERIES |
| | MOUNTING CONNECTION AND VENTLIATION DETAILS. |
| | |
| | FIRE SUPRESSION PLANS. |
| | 1) MANUFACTURER EQUIPMENT SUBMITTALS REQUIRED FOR |
| | ENTIRE SYSTEM INCLUDING ALL COMPONENTS. |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. SEE LINK: HTTP://WPB.ORG/DEVELOPMENT |
| | /WP-CONTENT/UPLOADS/SITES/33/2013/09/APPLICATION_RESUBM |
| | ITTAL_FORM_04132010.PDF |
| | |
| | ADDITIONALLY, PLEASE INSERT CORRECTED PAGES INTO |
| | SUBMITTAL PACKAGE AND LEAVE THE PREVIOUSLY REVIEWED |
| | SHEETS FOR COMPARATIVE REVIEW. |
| | DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, |
| | 561-805-6717 OR [email protected] |
| | |