Plan Review Details - Permit 14070638
Plan Review Stops For Permit 14070638
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2014-07-18 Cont ID  
Sent By rmcdouga Date 2014-07-18 Time 18:00 Rev Time 0.00
Received By rmcdouga Date 2014-07-18 Time 18:00 Sent To  
Notes
2014-07-18 18:00:58APPROVED WITH EXCEPTIONS. SEE NOTES ON THE PLANS.
 - STRUCTURAL ENGINEER IS TO SUBMIT TWO SETS OF SIGNED
 AND SEALED STRUCTURAL DETAILS OF THE REINFORCED POOL
 FLOOR SPECIFYING THE THICKNESS AND PSI OF THE CONCRETE.
 - THE PROJECT IS LOCATED IN AN A5 FLOOD ZONE. THE
 EQUIPMENT IS REQUIRED TO BE AT OR ABOVE THE REQUIRED
 MINIMUM BASE FLOOD ELEVATION OF 7.5'.
 - A SEPARATE PERMIT, APPLICATION AND REVIEW IS REQUIRED
 FOR THE AUGER PILINGS.
 - A SEPARATE PERMIT, APPLICATION AND REVIEW IS REQUIRED
 FOR THE GAS PIPING SUPPLYING THE POOL HEATER.

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2014-07-19 Cont ID  
Sent By rmcdouga Date 2014-07-19 Time 07:07 Rev Time 0.00
Received By rmcdouga Date 2014-07-19 Time 07:07 Sent To Z
Notes
2014-07-19 07:11:16THE INFORMATION REQUESTED IN THE FIRST ELECTRICAL
 REVIEW IS PROVIDED IN PERMIT # 14020415 FOR THE NEW
 SINGLE FAMILY RESIDENCE.

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2014-07-18 Cont ID  
Sent By dhayes Date 2014-07-18 Time 10:56 Rev Time 0.00
Received By dhayes Date 2014-07-18 Time 10:56 Sent To  
Notes
2014-07-18 11:16:30DATE: 7/18/2014
 PROJECT: 8014FLAGLER CT. NEW POOL
 PERMIT#: 14070638
 CODE: 2008 EDITION OF THE NEC
 2010 EDITION OF THE FBC
 2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1,
 ADMINISTRATION, 2012 FBC SUPPLEMENTS.
  
 1ST ELECTRICAL PLAN REVIEW
 ACTION: DENIED
  
 1) PROVIDE A SITE PLAN INDICATING THE LOCATION OF THE
 ELECTRICAL SERVICE ON THE HOUSE, THE FPL ELECTRICAL
 UTILITY LINES WHETHER OVERHEAD OR UNDERGROUND AND THE
 ELECTRICAL PANEL THAT THE POOL EQUIPMENT PANEL WILL BE
 FED FROM AND THE AREA LIGHTING AND RECEPTACLES. FBC WPB
 AMENDMENTS. 107.2.1, NEC 680.8, 680.10, 680.12, 680.22,
 680.25
  
 2) PROVIDE A RISER DIAGRAM, LOAD CALCULATION AND PANEL
 SCHEDULE TO INDICATE THE AVAILABILITY OF CIRCUITRY AND
 AMPACITY TO FEED THE NEW POOL EQUIPMENT. FBC WPB
 AMENDMENTS 107.2.1, NEC 220.12, 220.14
  
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. SEE LINK: HTTP://WPB.ORG/DEVELOPMENT
 /WP-CONTENT/UPLOADS/SITES/33/2013/09/APPLICATION_RESUBM
 ITTAL_FORM_04132010.PDF
  
 ADDITIONALLY, INSERT CORRECTED PAGES INTO SUBMITTAL AND
 LEAVE THE PREVIOUSLY REVIEWED SHEETS.
  
 DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421,
 561-805-6717 OR [email protected]
  

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2014-07-18 Cont ID  
Sent By rmcdouga Date 2014-07-18 Time 18:02 Rev Time 0.00
Received By rmcdouga Date 2014-07-18 Time 18:02 Sent To  
Notes
2014-07-18 18:04:23A SEPARATE PERMIT, APPLICATION AND REVIEW IS REQUIRED
 FOR THE GAS TO SUPPLY THE GAS POOL HEATER.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-07-22 Cont ID  
Sent By dhayes Date 2014-07-22 Time 16:40 Rev Time 0.00
Received By dhayes Date 2014-07-18 Time 10:52 Sent To  
Notes
2014-07-18 09:56:10ROUTED TO ZONING

Review Stop P PLUMBING
Rev No 1 Status P Date 2014-07-18 Cont ID  
Sent By rmcdouga Date 2014-07-18 Time 18:01 Rev Time 0.00
Received By rmcdouga Date 2014-07-18 Time 18:01 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2014-07-21 Cont ID  
Sent By sgraham Date 2014-07-21 Time 11:38 Rev Time 0.00
Received By sgraham Date 2014-07-21 Time 11:38 Sent To  
Notes
***NONE***