Plan Review Details - Permit 14061311
Plan Review Stops For Permit 14061311
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2014-08-15 Cont ID  
Sent By shill Date 2014-08-15 Time 12:23 Rev Time 0.00
Received By shill Date 2014-08-15 Time 12:23 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 3 Status P Date 2014-10-20 Cont ID  
Sent By cranford Date 2014-10-20 Time 12:15 Rev Time 0.00
Received By cranford Date 2014-10-20 Time 12:12 Sent To I
Notes
2014-10-20 12:14:38PASSED WITH PROVISO - ENGINEERING DEVELOPMENT
 APPLICATION MUST BE SUBMITTED AND APPROVED PRIOR TO
 START OF CONSTRUCTION. DETAILED STORMWATER MANAGEMENT
 CALCULATIONS (RECOVERY AND HGL) WILL BE REQUIRED AS
 PART OF THE APPLICATION.

Review Stop ENG ENGINEERING CSD
Rev No 2 Status F Date 2014-09-18 Cont ID  
Sent By cranford Date 2014-09-18 Time 11:44 Rev Time 3.00
Received By cranford Date 2014-09-15 Time 12:25 Sent To I
Notes
2014-09-18 11:47:31PROPOSED DUMPSTER ENCLOSURE LOCATION IS ACCESSIBLE.
 AREA BETWEEN ALLEY AND ENCLOSURE WILL NEED TO BE
 DESIGNATED AS NO PARKING. TREES WILL NEED TO BE
 REMOVED/TRIMMED FARTHER EAST ALONG THE ALLEY TO ALLOW
 SANITATION DEPARTMENT TRUCKS TO ACCESS THIS PORTION OF
 THE ALLEY.
  
 REMAINDER OF PREVIOUS REVIEW COMMENTS HAVE STILL NOT
 BEEN ADDRESSED.
2014-09-15 12:29:159/15/14 -
  
 FERDINAN AND PAT (SOLID WASTE) ARE REVIEWING
 ACCESSIBILITY OF DUMPSTER LOCATION. ENCLOSURE WILL NEED
 TO MEET CITY STANDARD GC-8. DETAIL CAN BE DOWNLOADED AT
 HTTP://WPB.ORG/ENGINEERING/ENGINEERING-SERVICES/ENGINE
 ERING-STANDARDS/
  
 OTHER PREVIOUSLY MENTIONED REQUIREMENTS HAVE NOT YET
 BEEN ADDRESSED.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2014-08-22 Cont ID  
Sent By cranford Date 2014-08-22 Time 13:19 Rev Time 2.00
Received By cranford Date 2014-08-22 Time 09:28 Sent To I
Notes
2014-08-22 09:31:211. PLEASE SUBMIT SIGNED AND SEALED DRAINAGE
 CALCULATIONS INCLUDING RECOVERY CALCULATIONS SINCE
 RETENTION IS PROPOSED AND THE DRAINAGE SYSTEM WILL BE
 THE CITY'S RESPONSIBILITY TO MAINTAIN.
  
 2. REVISE THE PLANS TO INCLUDE DETAILS FOR THE
 CONNECTION INTO THE EXISTING STORM MANHOLE
  
 3. SPECIFY COMPACTION DENSITIES UNDER THE PAVERS AND
 WITHIN THE DRY RETENTION AREAS ,
  
 4. GRADES ARE TO REFERENCED NGVD PER SECTION 78-9 OF
 THE CITY'S CODE OF ORDINANCES. NOTE 6 ON SHEET C-2
 REFERENCES NAVD 88.
  
 5. ENGINEERING DEPARTMENT DEVELOPMENT APPROVAL AND
 RIGHT-OF-WAY PERMIT ARE REQUIRED PRIOR TO THE START OF
 CONSTRUCTION.

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2014-06-30 Cont ID  
Sent By aaponte Date 2014-06-30 Time 10:32 Rev Time 0.00
Received By aaponte Date 2014-06-30 Time 10:32 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2014-10-21 Cont ID  
Sent By skennedy Date 2014-10-21 Time 15:07 Rev Time 0.00
Received By skennedy Date 2014-09-30 Time 13:33 Sent To  
Notes
2014-09-30 13:35:46TO ENGINEERING WITH ALL NEW CIVIL SHEETS.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2014-09-22 Cont ID  
Sent By skennedy Date 2014-09-22 Time 15:25 Rev Time 0.00
Received By skennedy Date 2014-09-09 Time 15:41 Sent To  
Notes
2014-09-09 15:42:53TO ENG

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-08-22 Cont ID  
Sent By shill Date 2014-08-22 Time 12:10 Rev Time 0.00
Received By shill Date 2014-06-30 Time 16:13 Sent To  
Notes
2014-08-19 14:16:148/19 TO ENGINEERING
  
2014-08-15 12:23:238/15 ON SH DESK PENDING RESPONSE FROM ENGINEERING
  
2014-07-29 15:21:00TO MISC 2 BOX.
2014-06-30 16:18:06TO ZONING
  

Review Stop Z ZONING
Rev No 1 Status P Date 2014-07-29 Cont ID  
Sent By aaponte Date 2014-07-29 Time 15:20 Rev Time 0.00
Received By aaponte Date 2014-07-29 Time 15:20 Sent To  
Notes
2014-07-01 12:56:337/1/14 ZONING SENT TO AA. SG