| Plan Review Stops For Permit 14061311 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2014-08-15 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2014-08-15 |
Time |
12:23 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2014-08-15 |
Time |
12:23 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
3 |
Status |
P |
Date |
2014-10-20 |
|
|
Cont ID |
|
| Sent By |
cranford |
Date |
2014-10-20 |
Time |
12:15 |
Rev Time |
0.00 |
| Received By |
cranford |
Date |
2014-10-20 |
Time |
12:12 |
Sent To |
I |
|
| Notes |
| 2014-10-20 12:14:38 | PASSED WITH PROVISO - ENGINEERING DEVELOPMENT | | | APPLICATION MUST BE SUBMITTED AND APPROVED PRIOR TO | | | START OF CONSTRUCTION. DETAILED STORMWATER MANAGEMENT | | | CALCULATIONS (RECOVERY AND HGL) WILL BE REQUIRED AS | | | PART OF THE APPLICATION. |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
2 |
Status |
F |
Date |
2014-09-18 |
|
|
Cont ID |
|
| Sent By |
cranford |
Date |
2014-09-18 |
Time |
11:44 |
Rev Time |
3.00 |
| Received By |
cranford |
Date |
2014-09-15 |
Time |
12:25 |
Sent To |
I |
|
| Notes |
| 2014-09-18 11:47:31 | PROPOSED DUMPSTER ENCLOSURE LOCATION IS ACCESSIBLE. | | | AREA BETWEEN ALLEY AND ENCLOSURE WILL NEED TO BE | | | DESIGNATED AS NO PARKING. TREES WILL NEED TO BE | | | REMOVED/TRIMMED FARTHER EAST ALONG THE ALLEY TO ALLOW | | | SANITATION DEPARTMENT TRUCKS TO ACCESS THIS PORTION OF | | | THE ALLEY. | | | | | | REMAINDER OF PREVIOUS REVIEW COMMENTS HAVE STILL NOT | | | BEEN ADDRESSED. | | 2014-09-15 12:29:15 | 9/15/14 - | | | | | | FERDINAN AND PAT (SOLID WASTE) ARE REVIEWING | | | ACCESSIBILITY OF DUMPSTER LOCATION. ENCLOSURE WILL NEED | | | TO MEET CITY STANDARD GC-8. DETAIL CAN BE DOWNLOADED AT | | | HTTP://WPB.ORG/ENGINEERING/ENGINEERING-SERVICES/ENGINE | | | ERING-STANDARDS/ | | | | | | OTHER PREVIOUSLY MENTIONED REQUIREMENTS HAVE NOT YET | | | BEEN ADDRESSED. |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
F |
Date |
2014-08-22 |
|
|
Cont ID |
|
| Sent By |
cranford |
Date |
2014-08-22 |
Time |
13:19 |
Rev Time |
2.00 |
| Received By |
cranford |
Date |
2014-08-22 |
Time |
09:28 |
Sent To |
I |
|
| Notes |
| 2014-08-22 09:31:21 | 1. PLEASE SUBMIT SIGNED AND SEALED DRAINAGE | | | CALCULATIONS INCLUDING RECOVERY CALCULATIONS SINCE | | | RETENTION IS PROPOSED AND THE DRAINAGE SYSTEM WILL BE | | | THE CITY'S RESPONSIBILITY TO MAINTAIN. | | | | | | 2. REVISE THE PLANS TO INCLUDE DETAILS FOR THE | | | CONNECTION INTO THE EXISTING STORM MANHOLE | | | | | | 3. SPECIFY COMPACTION DENSITIES UNDER THE PAVERS AND | | | WITHIN THE DRY RETENTION AREAS , | | | | | | 4. GRADES ARE TO REFERENCED NGVD PER SECTION 78-9 OF | | | THE CITY'S CODE OF ORDINANCES. NOTE 6 ON SHEET C-2 | | | REFERENCES NAVD 88. | | | | | | 5. ENGINEERING DEPARTMENT DEVELOPMENT APPROVAL AND | | | RIGHT-OF-WAY PERMIT ARE REQUIRED PRIOR TO THE START OF | | | CONSTRUCTION. |
|
|
| Review Stop |
HIST |
HISTORICAL |
| Rev No |
1 |
Status |
P |
Date |
2014-06-30 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
2014-06-30 |
Time |
10:32 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
2014-06-30 |
Time |
10:32 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2014-10-21 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2014-10-21 |
Time |
15:07 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2014-09-30 |
Time |
13:33 |
Sent To |
|
|
| Notes |
| 2014-09-30 13:35:46 | TO ENGINEERING WITH ALL NEW CIVIL SHEETS. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2014-09-22 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2014-09-22 |
Time |
15:25 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2014-09-09 |
Time |
15:41 |
Sent To |
|
|
| Notes |
| 2014-09-09 15:42:53 | TO ENG |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2014-08-22 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2014-08-22 |
Time |
12:10 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2014-06-30 |
Time |
16:13 |
Sent To |
|
|
| Notes |
| 2014-08-19 14:16:14 | 8/19 TO ENGINEERING | | | | | 2014-08-15 12:23:23 | 8/15 ON SH DESK PENDING RESPONSE FROM ENGINEERING | | | | | 2014-07-29 15:21:00 | TO MISC 2 BOX. | | 2014-06-30 16:18:06 | TO ZONING | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2014-07-29 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
2014-07-29 |
Time |
15:20 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
2014-07-29 |
Time |
15:20 |
Sent To |
|
|
| Notes |
| 2014-07-01 12:56:33 | 7/1/14 ZONING SENT TO AA. SG |
|
|