Plan Review Details - Permit 14060928
Plan Review Stops For Permit 14060928
Review Stop E ELECTRICAL
Rev No 1 Status P Date 2014-06-24 Cont ID  
Sent By dhayes Date 2014-06-24 Time 09:57 Rev Time 0.00
Received By dhayes Date 2014-06-24 Time 08:06 Sent To  
Notes
2014-06-24 08:59:15ELECTRICAL PERMIT WAS CHANGED TO A SUB PERMIT UNDER
 PRIMARY PERMIT #14070238. ELECTRICAL WAS PASSED UNDER A
 SUBSEQUENT REVIEW BY RL. SEE PERMIT #14070238 FOR NEW
 ELECTRICAL PLAN REVIEW.
  
 DATE: 6/24/2014
 PROJECT: FED EX
 PERMIT#: 14060928
 CODE: 2008 EDITION OF THE NEC
 2010 EDITION OF THE FBC
 2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1,
 ADMINISTRATION, 2012 FBC SUPPLEMENTS.
  
 1ST ELECTRICAL PLAN REVIEW
 ACTION: DENIED
  
 NOTE:
 FBC 107.2.1, 107.2.1 INFORMATION ON CONSTRUCTION
 DOCUMENTS. CONSTRUCTION DOCUMENTS SHALL BE DIMENSIONED
 AND DRAWN UPON SUITABLE MATERIAL. ELECTRONIC MEDIA
 DOCUMENTS SHALL BE SUBMITTED WHEN APPROVED BY THE
 BUILDING OFFICIAL. CONSTRUCTION DOCUMENTS SHALL BE OF
 SUFFICIENT CLARITY TO INDICATE THE LOCATION, NATURE AND
 EXTENT OF THE WORK PROPOSED AND SHOW IN DETAIL THAT IT
 WILL CONFORM TO THE PROVISIONS OF THIS CODE AND
 RELEVANT LAWS, ORDINANCES, RULES AND REGULATIONS, AS
 DETERMINED BY THE BUILDING OFFICIAL. SUCH DRAWINGS AND
 SPECIFICATIONS SHALL CONTAIN INFORMATION, IN THE FORM
 OF NOTES OR OTHERWISE, AS TO THE QUALITY OF MATERIALS,
 WHERE QUALITY IS ESSENTIAL TO CONFORMITY WITH THE
 TECHNICAL CODES. SUCH INFORMATION SHALL BE SPECIFIC,
 AND THE TECHNICAL CODES SHALL NOT BE CITED AS A WHOLE
 OR IN PART, NOR SHALL THE TERM "LEGAL" OR ITS
 EQUIVALENT BE USED AS A SUBSTITUTE FOR SPECIFIC
 INFORMATION. ALL INFORMATION, DRAWINGS, SPECIFICATIONS
 AND ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE
 OF THE PERSON RESPONSIBLE FOR THE DESIGN. (SEE ALSO
 SECTION 107.3.5).. ELECTRICAL_OVERCURRENT PROTECTION,
 GROUNDING, WIRING METHODS AND MATERIALS.
 107.2.5_107.2.5 SITE PLAN. THE CONSTRUCTION DOCUMENTS
 SUBMITTED WITH THE APPLICATION FOR PERMIT SHALL BE
 ACCOMPANIED BY A SITE PLAN SHOWING TO SCALE THE SIZE
 AND LOCATION OF NEW CONSTRUCTION
  
 1) ADDITIONAL PERMITS SUCH AND A BUILDING PERMIT TO
 EXAMINE THE CODE REQUITEMENTS OF THE STRUCTUAL SUPPORT
 AND INSTALLATION, A FIRE PERMIT TO EXAMINE THE LIFE
 SAFETY ISSUES, ASSOCIATED WITH THE CONVEYOR SYSTEM AND
 HOW THE NEW INSTALLATION AFFECTS THE CURRENT LIFE
 SAFETY EXIT REQUIREMNTS OF THE FACILITY MAY BE REQUIRED
 FOR THE COMPLETE INSTALLATION OF THE NEW CONVEYOR
 SYSTEM. THE ELECTRICAL PERMIT CANNOT BE ISSUED UNTIL
 THE PERMIT FOR THE INSTALLATION OF THE CONVEYOR SYSTEM
 HAS BEEN APPROVED AND ISSUED. PLEASE SUBMIT ALL
 SUPPORTING DOCUMENTATION LISTED BELOW AND UPON REVEIW
 OF SUPPORTING DOCCUMENTATION ADDITIONAL PERMIT TYPES
 SHALL BE ASSIGNED AND THE CONTRACTOR WILL BE NOTIFIED.
  
 2) ADDITIONAL INFORMATION REQUIRED. FBC WPB AMENDMENTS.
 107.2.1. PLANS ARE INCOMPLETE. ALL ASPECTS OF THE
 OVERALL INSTALLATION SHALL BE INCLUDED WITH THE
 SUBMITTAL. THE CONNECTION UP OF THE NEW CONVEYOR SYSTEM
 WILL REQUIRE BUT NOT BE LIMITED TO THE FOLLOWING
 ADDITIONAL DOCUMENTATION:
  
 A) A SITE PLAN INDICATING THE LOCATION OF THE
 ELECTRICAL SERVICE.
 B) ANY DEMOLITION THAT MAY OR MAY NOT BE INVOLVED TO
 MAKE ROOM FOR THE NEW CONVEYOR SYSTEM.
 C) A FLOOR PLAN INDICATING THE LAYOUT OF THE NEW
 CONVEYOR SYSTEM AND LOCATION OF ELECTRICAL PANELS,
 DISCONNECTS, STARTERS, VFD'S ETC.. REQUIRED FOR THE
 CONNECTION AND SAFE OPERATION OF THE NEW CONVEYOR
 SYSTEM.
 THE FLOOR PLAN SHALL ALSO PROVIDE AND ILLUSTRATE THE
 SAFE WORKING CLEARANCES AND DEDICATED WORKING SPACE AND
 ILLUMINATION AT ALL ELECTRICAL EQUIPMENT, PANEL BOARDS
 AND TRANSFORMERS PER THE NEC 110.26 AND 240.24.
 D) A LIFE SAFETY PLAN INDICATING THE REQUIRED EXIT
 PATHS FOR THE NUMBER OF PEOPLE IN THE SPACE. NFPA 101
 E) A LIGHTING PLAN INDICATING PROPER ILLUMINATION
 AROUND THE CONVEYOR SYSTEM AND RELATED ELECTRICAL
 EQUIPMENT FOR ITS SAFE OPERATION NEC 110.26(D)
 F) THE LIGHTING PLAN SHALL INCLUDE ALL EMERGENCY AND
 EXIT LIGTING FOR A SAFE ILLUMINATED MEANS OF EGRESS
 ALONG THE LIFE SAFETY PLAN. NFPA 101
 G) DEPENDING ON THE SCOPE OF WORK AND SIZE OF THE
 BUILDING THE PROJECT MAY NEED TO BE IN COMPLIANCE WITH
 CHAPTER 505 OF THE FBC-ENERGY.
 H) A SINGLE LINE RISER DIAGRAM INDICATING FROM THE
 SOURCE, METER, MAINS, OCPD'S REQUIRED FOR THE
 CONNECTION OF THE NEW CONVEYOR SYSTEM. FBC 107.2.1
 I) THE DEMOLITION OF ANY ELECTRICAL EQUIPMENT THAT MAY
 OR MAY NOT BE PROPOSED TO BE REMOVED TO MAKE WAY FOR
 THE NEW CONVEYOR SYSTEM.
 J) A LOAD CALCULATION INDICATING THE AVIALABILITY OF
 THE CAPACITY REQUIRED TO ADD THE ADDITIONAL LOAD OF THE
 NEW CONVEYOR SYSTEM. NEC 220
 K) THE PANEL SCHEDULES REQUIRED TO INDICATE THE
 CIRCUITRY REQUIRED FOR THE CONNECTION OF ANY NEW
 EQUIPMENT RELATED TO THE CONNECTION OF THE NEW CONVEYOR
 SYSTEM. NEC 408
 L) ALL INFORMATION, DRAWINGS, SPECIFICATIONS AND
 ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE OF
 THE PERSON RESPONSIBLE FOR THE DESIGN. FBC 107.2.1
 M) SHOP DRAWINGS, EQUPMENT MANUALS AND SPECIFICATIONS
 FROM THE MAUFACTURER ON ALL ASPECTS OF THE NEW CONVEYOR
 SYSTEM, INCLUDING BUT NOT LIMITED TO ELECTRICAL
 SPECIFICATIONS, MECHANICAL AND STRUCTURAL SUPPORT
 SPECIFICATIONS.
  
 DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421,
 561-805-6717 OR AT [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-06-24 Cont ID  
Sent By dhayes Date 2014-06-24 Time 09:57 Rev Time 0.00
Received By dhayes Date 2014-06-23 Time 08:59 Sent To E
Notes
***NONE***