| Plan Review Stops For Permit 14060915 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2014-08-02 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-08-02 |
Time |
06:57 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-08-02 |
Time |
06:57 |
Sent To |
|
|
| Notes |
| 2014-08-02 06:57:56 | APPROVED WITH EXCEPTION. | | | 1) SUBMIT TWO SETS OF AN ACCURATELY COMPLETED | | | RESIDENTIAL BUILDING FORM 402 OR 405 AS REQUIRED BY FBC | | | ENERGY CONSERVATION SECTION 103.2. | | | 2) SUBMIT TWO SETS OF AN ELEVATION CERTIFICATE SHOWING | | | THAT THE STRUCTURE AND EQUIPMENT MEET THE REQUIRED | | | MINIMUM BASE FLOOD ELEVATIONS INCLUDING THE 6 INCH | | | FREEBOARD. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2014-07-10 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-07-10 |
Time |
16:44 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-07-09 |
Time |
15:27 |
Sent To |
Z |
|
| Notes |
| 2014-07-10 16:08:47 | 2010 FBC | | | | | | DENIED BY BUILDING | | | | | | 1) THIS STRUCTURE IS LOCATED IN AN A5 FLOOD ZONE. THE | | | ELEVATION CERTIFICATE THAT WAS SUBMITTED INDICATES THAT | | | THE STRUCTURE AND GARAGE ARE BOTH ABOVE THE REQUIRED | | | MINIMUM OF 7.5 FEET NGVD. HOWEVER, IT ALSO SHOWS THAT | | | SOME OF THE EQUIPMENT THAT SERVICES THE BUILDING IS TOO | | | LOW. THIS WILL NEED TO BE CORRECTED AND A NEW ELEVATION | | | CERTIFICATE SHOWING COMPLIANCE IS REQUIRED PRIOR TO | | | RECIEVING FINAL INSPECTION APPROVAL. CITY OF WEST PALM | | | BEACH FLOOD ORDINANCE. | | | | | | 2) THE PLANS SHOW A DUAL FUEL GRIDDLE AND RANGE. PLEASE | | | CALARIFY THE TYPE OF FUEL THAT THIS APPLIANCE WILL USE. | | | IF IT USES NATURAL OR LP GAS A SEPARATE PERMIT, | | | APPLICATION AND REVIEW OF THE GAS RISER PLAN WILL BE | | | REQUIRED. | | | | | | 3) SHOW COMPLIANCE WITH FBCR 315 FOR CARBON MONOXIDE | | | ALARMS. | | | | | | 4) FBCR 803.2.3.1 REQUIRES THE ROOF SHEATHING TO BE | | | FASTENED WITH 8D RING SHANK NAILS. PLEASE CORRECT NOTES | | | ON SHEET A4. | | | | | | 5) SUBMIT TWO SETS OF ENERGY COMPLIANCE DOCUMENTS AS | | | REQUIRED BY FBC ENERGY CONSERVATION SECTION 103.2 | | | | | | 6) SUBMIT TWO SETS OF PRODUCT APPROVALS FOR THE ROOFING | | | MATERIAL AS REQUIRED BY DCA RULE 9N-3. | | | | | | 7) THE PRODUCT APPROVALS ARE REQUIRED TO BE REVIEWED | | | AND APPROVED IN WRITING BY THE DESIGNER OF RECORD. CITY | | | AMENDMENTS 107.3.4.1 | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | [email protected] |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2014-08-02 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-08-02 |
Time |
07:27 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-08-02 |
Time |
07:27 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2014-07-09 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-07-09 |
Time |
16:50 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-07-09 |
Time |
16:50 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2014-08-02 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-08-02 |
Time |
07:26 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-07-24 |
Time |
17:00 |
Sent To |
|
|
| Notes |
| 2014-07-24 17:00:36 | SENT TO R. MC DOUGALS DESK. JW |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
D HAYES |
Date |
2014-07-14 |
Time |
|
Rev Time |
|
| Received By |
rmcdouga |
Date |
2014-06-20 |
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
3 |
Status |
P |
Date |
2014-08-05 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-08-05 |
Time |
10:19 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-08-05 |
Time |
10:15 |
Sent To |
|
|
| Notes |
| 2014-08-05 10:20:00 | NO FEES DUE. MU-2014-17415 |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
2 |
Status |
F |
Date |
2014-08-02 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-08-02 |
Time |
07:28 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-08-02 |
Time |
07:28 |
Sent To |
|
|
| Notes |
| 2014-08-02 07:30:56 | ONE SET OF THE APPROVED PLANS ARE REQUIRED TO BE TAKEN | | | TO PALM BEACH COUNTY FOR AN IMPACT FEE REVIEW. | | | IMPACT FEES MUST BE PAID TO PALM | | | BEACH COUNTY, PLANS STAMPED BY THEM AND | | | COPY OF RECEIPT SUBMITTED TO CITY OF | | | WEST PALM BEACH BUILDING DEPARTMENT, | | | BEFORE A BUILDING PERMIT CAN BE ISSUED. |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
1 |
Status |
F |
Date |
2014-07-09 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-07-09 |
Time |
17:23 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-07-09 |
Time |
17:23 |
Sent To |
|
|
| Notes |
| 2014-07-09 17:25:08 | ONCE THE PLANS HAVE BEEN APPROVED BY THE CITY OF W.P.B. | | | THEY ARE REQUIRED TO BE REVIEWED BY PALM BEACH COUNTY | | | TO DETERMINE IF IMPACT FEES ARE OWED. |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
N |
Date |
2014-07-09 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-07-09 |
Time |
16:50 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-07-09 |
Time |
16:50 |
Sent To |
|
|
| Notes |
| 2014-07-09 16:53:07 | NO MECHANICAL WORK IS SPECIFIED ON THE PLANS. A | | | SEPARATE PERMIT, APPLICATION AND REVIEW IS REQUIRED. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2014-08-02 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-08-02 |
Time |
07:27 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-08-02 |
Time |
07:27 |
Sent To |
|
|
| Notes |
| 2014-08-02 07:27:46 | CORRECTLY LABELED WATER CLOSET AND LAVATORIES IN SECOND | | | FLOOR MASTER BATHROOM. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2014-07-09 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-07-09 |
Time |
16:53 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-07-09 |
Time |
16:53 |
Sent To |
|
|
| Notes |
| 2014-07-09 17:16:40 | CORRECTLY LABELED WATER CLOSET AND LAVATORIES IN SECOND | | | FLOOR MASTER BATHROOM. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2014-07-15 |
|
|
Cont ID |
|
| Sent By |
sgraham |
Date |
2014-07-15 |
Time |
14:21 |
Rev Time |
0.00 |
| Received By |
sgraham |
Date |
2014-07-15 |
Time |
14:20 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
sgraham |
Date |
2014-07-14 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
2014-07-14 |
Time |
|
Sent To |
B |
|
| Notes |
| 2014-07-14 15:37:19 | 7/14/14 ZONING FAILED | | | 1. PROVIDE 2- COPIES OF AN UP TO DATE SURVERY, SHOWING | | | THE KITCHEN ADDITION | | 2014-07-09 15:15:21 | 7/9/14 |
|
|