Plan Review Details - Permit 14060186
Plan Review Stops For Permit 14060186
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2015-01-20 Cont ID  
Sent By shill Date 2015-01-20 Time 10:30 Rev Time 0.00
Received By shill Date 2015-01-20 Time 10:30 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2014-10-21 Cont ID  
Sent By shill Date 2014-10-21 Time 16:10 Rev Time 0.00
Received By shill Date 2014-10-21 Time 16:10 Sent To  
Notes
2014-10-21 16:11:54****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. VALUE IS TO INCLUDE LABOR, MATERIALS, OVERHEAD,
 PROFIT, ENGINEERING FBC 109. PROVIDE A COPY OF THE
 CONTRACT FOR THIS JOB. IF MATERIALS ARE SUPPLIED BY
 OTHERS, PROVIDE A COST BREAKDOWN FOR VALUE OF
 MATERIALS.
  
 A LETTER WAS SUBMITTED AND CONTRACT NOT PROVIDED. IT
 APPEARS THAT THE VALUE PROVIDED IS FOR LABOR ONLY.
 PLEASE INCLUDE MATERIAL.
  
 THIS MAY BE SENT VIA EMAIL.
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2014-06-20 Cont ID  
Sent By shill Date 2014-06-20 Time 19:18 Rev Time 0.00
Received By shill Date 2014-06-20 Time 19:18 Sent To Z
Notes
2014-06-20 19:19:29****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. VALUE IS TO INCLUDE LABOR, MATERIALS, OVERHEAD,
 PROFIT, ENGINEERING FBC 109. PROVIDE A COPY OF THE
 CONTRACT FOR THIS JOB. IF MATERIALS ARE SUPPLIED BY
 OTHERS, PROVIDE A COST BREAKDOWN FOR VALUE OF
 MATERIALS.
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2014-06-11 Cont ID  
Sent By dhayes Date 2014-06-11 Time 10:59 Rev Time 0.00
Received By dhayes Date 2014-06-11 Time 10:59 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2015-01-20 Cont ID  
Sent By shill Date 2015-01-20 Time 10:30 Rev Time 0.00
Received By shill Date 2015-01-13 Time 07:58 Sent To  
Notes
2015-01-14 07:58:50SENT TO S HILL

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2014-10-21 Cont ID  
Sent By shill Date 2014-10-21 Time 16:13 Rev Time 0.00
Received By shill Date 2014-10-14 Time 14:23 Sent To  
Notes
2014-10-15 14:23:33RE-SUBMITTAL SENT TO SAMANTHA HILL FOR REVIEW. JG.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-06-25 Cont ID  
Sent By eschneid Date 2014-06-25 Time 10:21 Rev Time 0.00
Received By eschneid Date 2014-06-05 Time 15:55 Sent To  
Notes
2014-06-20 19:19:496/20 TO ZONING
  
2014-06-05 15:55:35ROUTED TO ELECTRICAL

Review Stop Z ZONING
Rev No 2 Status P Date 2014-08-20 Cont ID  
Sent By eschneid Date 2014-08-20 Time 14:33 Rev Time 0.25
Received By eschneid Date 2014-08-20 Time 14:33 Sent To  
Notes
2014-08-20 14:34:25PASSED
  
 1) CITYSCAPE APPROVED
  
 2) PLEASE NOTE THAT THE FUTURE INSTALLATION OF AN
 EQUIPMENT CABINET WILL REQUIRE A SEPARATE PERMIT. A
 FUTURE CABINET WOULD NEED TO BE SCREENED.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446.

Review Stop Z ZONING
Rev No 1 Status F Date 2014-06-25 Cont ID  
Sent By eschneid Date 2014-06-25 Time 10:02 Rev Time 0.00
Received By eschneid Date 2014-06-25 Time 14:33 Sent To  
Notes
2014-06-25 10:14:18FAILED
  
 1) THIS APPLICATION REQUIRES THE APPROVAL BY CITYSCAPE
 PRIOR TO ZONING APPROVAL OF THE PERMIT. PLEASE SUBMIT A
 LEVEL 2 WIRELESS COMMUNICATION FACILITY APPLICATION TO
 THE PLANNING DIVISION.
  
 2) PLEASE NOTE THAT THE FUTURE INSTALLATION OF AN
 EQUIPMENT CABINET WILL REQUIRE A SEPARATE PERMIT. A
 FUTURE CABINET WOULD NEED TO BE SCREENED.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446.