Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2014-06-05 Cont ID  
Sent By skennedy Date 2014-06-05 Time 15:40 Rev Time 0.00
Received By skennedy Date 2014-06-05 Time 15:40 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2014-05-31 Cont ID  
Sent By skennedy Date 2014-05-31 Time 12:54 Rev Time 0.00
Received By skennedy Date 2014-05-31 Time 12:57 Sent To  
Notes
2014-05-31 13:25:441ST REVIEW:
  
 THE PERMIT AND PLAN SHOULD CONTAIN PER FBC
 107.3.5.3.1(5) - WIND DESIGN LOADS/DESIGN PRESSURES
 PURSUANT TO FBCR, CHAPTER 3. THIS IS APPLICABLE TO
 WINDOW REPALCEMENT, THE WINDOW TO BE REMOVED AND THE
 WALL TO BE FILLED IN AT THAT LOCATION. RESULTING DESIGN
 PRESSURE ARE APPLICABLE TO THE REPLACEMENT OF THE
 SIDING. THE PRODUCT APPROVAL FOR THE REPALCEMENT SIDING
 INDICATES IT IS TO BE PLACED OVER 5/8" 5PLY APA RATED
 PLYWOOD SHEATHING. THE PLAN PROVIDED FOR THE EXISTING
 CONDITION SHOWS 1/2" 3 PLY SHEATHING. THIS SHOULD BE
 EVALUATED AND PERHAPS ENGINEERED TO INDICATE COMPLIANCE
 WITH THE EXISTING BUILDING CODE FOR AN ALTERATION LEVEL
 ONE OR PERSCRIPTIVE PER FBCEB 301.2.2 NEW AND
 REPLACEMENT MATERIALS. PROVIDE IMPACT PROTECTION FOR
 FOR GLAZING.
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2014-06-05 Cont ID  
Sent By skennedy Date 2014-06-05 Time 15:40 Rev Time 0.00
Received By skennedy Date 2014-06-05 Time 15:40 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2014-05-30 Cont ID  
Sent By dhayes Date 2014-05-30 Time 10:35 Rev Time 0.00
Received By dhayes Date 2014-05-30 Time 10:35 Sent To  
Notes
2014-05-30 12:07:53ELECTRICAL. 1ST REVIEW DENIED. BASED ON THE 2008
 EDITION OF THE NEC AND THE 2010 FBC. SEE COMMENTS
 BELOW:
  
 1) REMODELING OF AN EXISTING STRUCTURE IS REQUIRED TO
 INCLUDE INTERCONNECTED SMOKE ALARMS BOTH WITHIN AND
 OUTSIDE EACH SLEEPING AREA. FBC R314, 315
  
 2) THE SERVICE DISCONNECTING MEANS SHALL BE INSTALLED
 AT A READILY ACCESSIBLE LOCATION INSIDE OR OUTSIDE THE
 BUILDING NEAREST THE POINT OF SERVICE ENTRANCE. NEC
 230.70
  
 3) AN INTERSYSTEM BONDING STRIP IS REQUIRED AT THE MAIN
 SERVICE GROUND. NEC 250.94
  
 4) BATHROOM BRANCH CIRCUITS IN ADDITION TO THE NUMBER
 OF BRANCH CIRCUITS REQUIRED BY OTHER PARTS OF THIS
 SECTION, AT LEAST ONE 20-AMPERE BRANCH CIRCUIT SHALL BE
 PROVIDED TO SUPPLY BATHROOM RECEPTACLE OUTLET(S). SUCH
 CIRCUITS SHALL HAVE NO OTHER OUTLETS. NEC 210.11 (C)(3)
  
 5) NOTE ON THE PLAN THE REQUIREMENT FOR TAMPER
 RESISTANT RECEPTACLES. NEC 406.11
  
 6) AT LEAST ONE SWITCH CONTROLLED LIGHTING OUTLET SHALL
 BE PROVIDED ON THE EXTERIOR SIDE OF THE SIDE ENTRANCE.
 NEC 210.70 (A) (2) (B).
  
 7) AT LEAST ONE LIGHTING OUTLET SHALL BE PROVIDED IN
 UTILITY ROOMS AND BASEMENTS WHERE SUCH SPACES ARE USED
 FOR STORAGE OR CONTAIN EQUIPMENT REQUIRING SERVICE.
 FBC-EXISTING 708.3.6, NEC 210.70
  
 8) PROVIDE A RECEPTACLE OUTLET IN THE HALLWAY. NEC
 210.52(H)
  
 9) INDICATE ALL CIRCUITRY ON FLOOR PLAN AND COMPLETE
 PANEL SCHEDULE INCLUDING ALL CIRCUITRY INDICATED ON
 FLOOOR PLAN. FBC 107.3.5.3 (WPB)
  
 10) ALL NEW RECEPTACLES MUST BE TAMPER RESISTANT. NEC
 406.11 THOSE OUTLETS IN WET LOCATIONS SHALL BE WEATHER
 RESISTANT NEC 406.8(B)(1)
  
 11) ALL 125V SINGLE PHASE, 15 AND 20AMP RECEPTACLES
 INSTALLED IN THE LOCATIONS SPECIFIED IN (1) THROUGH (8)
 SHALL HAVE GROUND FAULT CIRCUIT INTERRUPTER PROTECTION
 FOR PERSONNEL. NEC 210.8
  
 12) GFCI PROTECTED OUTLETS ARE REQUIRED FRONT AND BACK
 AT EACH RESIDENTIAL BUILDING AND AT THE LOCATION OF THE
 MECHANICAL EQUIPMENT. NEC 210-52 (E) (1), 210-63
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2014-06-05 Cont ID  
Sent By skennedy Date 2014-06-05 Time 15:40 Rev Time 0.00
Received By skennedy Date 2014-06-05 Time 14:52 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-05-31 Cont ID  
Sent By skennedy Date 2014-05-31 Time 13:26 Rev Time 0.00
Received By skennedy Date 2014-05-30 Time 10:34 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2014-06-05 Cont ID  
Sent By skennedy Date 2014-06-05 Time 14:53 Rev Time 0.00
Received By skennedy Date 2014-06-05 Time 14:52 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2014-05-31 Cont ID  
Sent By skennedy Date 2014-05-31 Time 12:51 Rev Time 0.00
Received By skennedy Date 2014-05-31 Time 12:51 Sent To  
Notes
2014-05-31 12:54:231ST REVIEW:
  
 SUPPLEMENTAL NOTES: 6/2/14- INTENT PER APPLICANT IS A/C
 CHANGE OUT, NOT NEW SYSTEM. ADVISED TO SUPPLY AN AHRI
 ONLY. DISREGARD CODE SECTIONS BELOW AS NOT APPLICABLE.
  
 FBC-EC 403.2.5 PROVIDE A SIZING CALCULATION
  
 FBC- 107.3.5.3 ? PROVIDE A MECHANICAL PLAN TO SHOW
 SUPPLY DUCTS PER FBC-R M16 & BATH EXHAUST PER FBC-R
 M15. PROVIDE AN EQUIPMENT SCHEDULE.
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]
  

Review Stop P PLUMBING
Rev No 1 Status P Date 2014-05-31 Cont ID  
Sent By skennedy Date 2014-05-31 Time 12:47 Rev Time 0.00
Received By skennedy Date 2014-05-31 Time 12:47 Sent To  
Notes
2014-05-31 12:50:53THERE ARE NO PLUMBING DETAILS SHOWN UPON THE PLAN. THE
 PERMIT DESCRIPTION INDICATES FIXTUES AND A WATER HEATER
 TO BE REPLACED.