Plan Review Details - Permit 14050001
| Plan Review Stops For Permit 14050001 |
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
P |
Date |
2014-05-05 |
|
|
Cont ID |
|
| Sent By |
mgonzale |
Date |
2014-05-05 |
Time |
|
Rev Time |
0.25 |
| Received By |
mgonzale |
Date |
2014-05-05 |
Time |
|
Sent To |
I |
|
| Notes |
| 2014-05-05 15:17:47 | DRIVEWAY APRON MUST BE 6" THICK CONCRETE 3000 PSI | | | SIDEWALK REPLACEMENT MUST BE 4" THICK SIDEWALK. | | | | | | MANUEL JULIAN GONZALEZ | | | ENGINEERING PROJECT COORDINATOR | | | ENGINEERING SERVICES AND PUBLIC WORKS DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1085 | | | FAX: (561) 494-1116 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2014-05-22 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
2014-05-22 |
Time |
09:21 |
Rev Time |
0.00 |
| Received By |
llouie |
Date |
2014-05-19 |
Time |
17:58 |
Sent To |
|
|
| Notes |
| 2014-05-19 17:58:41 | SENT TO ZONING BOX |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2014-05-18 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2014-05-18 |
Time |
06:31 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2014-05-01 |
Time |
09:47 |
Sent To |
Z |
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2014-05-22 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
2014-05-22 |
Time |
09:20 |
Rev Time |
0.00 |
| Received By |
llouie |
Date |
2014-05-22 |
Time |
09:20 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2014-05-05 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2014-05-18 |
Time |
06:31 |
Rev Time |
0.00 |
| Received By |
llouie |
Date |
2014-05-05 |
Time |
11:11 |
Sent To |
ENG |
|
| Notes |
| 2014-05-05 11:13:04 | ** FAILED ** | | | | | | PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE | | | COMMENTS IN WRITING AND/OR ON THE PLANS WHERE | | | APPLICABLE: | | | | | | 1.) PLEASE CLARIFY THE VALUE OF THE SCOPE OF WORK | | | (DRIVEWAY AND WALKWAYS) AT $50,000. | | | | | | 2.) EASEMENT CONSENT FOR ALL THE STRUCTURAL | | | ENCROACHMENTS (I.E. DRIVEWAY, WALKWAYS, A/C UNIT, POOL | | | EQUIPMENT, STEPS, GARDEN/RETAINING WALL, GENERATOR AND | | | POOL PATIO.) IN THE 10 FT. U.E. (ALONG WEST PROPERTY | | | LINE) AND THE 7 FT. U.E. (ALONG SOUTH PROPERTY LINE) IS | | | REQUIRED FROM THE FOLLOWING UTILITY PROVIDERS: AT&T, | | | FPU, FL&L AND COMCAST CABLE COMMUNICATIONS. THE PLANS | | | WILL NEED TO BE REVIEWED BY THE UTILITY PROVIDERS TO | | | ENSURE THAT THE PROPOSED STRUCTURES DO NOT INTERFERE | | | WITH THE PROVISIONS OF THEIR SERVICES, AND THAT ANY | | | REPAIR/REPLACEMENT WILL BE THE RESPONSIBILITY OF THE | | | PROPERTY OWNER. PROVIDE WRITTEN STATEMENTS FROM ALL | | | UTILITY PROVIDERS. | | | | | | PLEASE NOTE THAT ANY CHANGES ON THE RESUBMITTED PLANS | | | MAY RESULT IN ADDITIONAL COMMENTS. CONTACT LINDA LOUIE | | | @ (561) 822-1458 IF YOU HAVE QUESTIONS. | | | | | | | | | | | | | | 2014-05-01 10:42:03 | 5/1/14 ZONING RECEIVED, SENT TO LL. SG |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |