Plan Review Details - Permit 14050001
Plan Review Stops For Permit 14050001
Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2014-05-05 Cont ID  
Sent By mgonzale Date 2014-05-05 Time   Rev Time 0.25
Received By mgonzale Date 2014-05-05 Time   Sent To I
Notes
2014-05-05 15:17:47DRIVEWAY APRON MUST BE 6" THICK CONCRETE 3000 PSI
 SIDEWALK REPLACEMENT MUST BE 4" THICK SIDEWALK.
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES AND PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2014-05-22 Cont ID  
Sent By llouie Date 2014-05-22 Time 09:21 Rev Time 0.00
Received By llouie Date 2014-05-19 Time 17:58 Sent To  
Notes
2014-05-19 17:58:41SENT TO ZONING BOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-05-18 Cont ID  
Sent By skennedy Date 2014-05-18 Time 06:31 Rev Time 0.00
Received By skennedy Date 2014-05-01 Time 09:47 Sent To Z
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2014-05-22 Cont ID  
Sent By llouie Date 2014-05-22 Time 09:20 Rev Time 0.00
Received By llouie Date 2014-05-22 Time 09:20 Sent To I
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2014-05-05 Cont ID  
Sent By skennedy Date 2014-05-18 Time 06:31 Rev Time 0.00
Received By llouie Date 2014-05-05 Time 11:11 Sent To ENG
Notes
2014-05-05 11:13:04** FAILED **
  
 PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE
 COMMENTS IN WRITING AND/OR ON THE PLANS WHERE
 APPLICABLE:
  
 1.) PLEASE CLARIFY THE VALUE OF THE SCOPE OF WORK
 (DRIVEWAY AND WALKWAYS) AT $50,000.
  
 2.) EASEMENT CONSENT FOR ALL THE STRUCTURAL
 ENCROACHMENTS (I.E. DRIVEWAY, WALKWAYS, A/C UNIT, POOL
 EQUIPMENT, STEPS, GARDEN/RETAINING WALL, GENERATOR AND
 POOL PATIO.) IN THE 10 FT. U.E. (ALONG WEST PROPERTY
 LINE) AND THE 7 FT. U.E. (ALONG SOUTH PROPERTY LINE) IS
 REQUIRED FROM THE FOLLOWING UTILITY PROVIDERS: AT&T,
 FPU, FL&L AND COMCAST CABLE COMMUNICATIONS. THE PLANS
 WILL NEED TO BE REVIEWED BY THE UTILITY PROVIDERS TO
 ENSURE THAT THE PROPOSED STRUCTURES DO NOT INTERFERE
 WITH THE PROVISIONS OF THEIR SERVICES, AND THAT ANY
 REPAIR/REPLACEMENT WILL BE THE RESPONSIBILITY OF THE
 PROPERTY OWNER. PROVIDE WRITTEN STATEMENTS FROM ALL
 UTILITY PROVIDERS.
  
 PLEASE NOTE THAT ANY CHANGES ON THE RESUBMITTED PLANS
 MAY RESULT IN ADDITIONAL COMMENTS. CONTACT LINDA LOUIE
 @ (561) 822-1458 IF YOU HAVE QUESTIONS.
  
  
  
  
2014-05-01 10:42:035/1/14 ZONING RECEIVED, SENT TO LL. SG