Plan Review Details - Permit 14040608
Plan Review Stops For Permit 14040608
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2014-10-03 Cont ID  
Sent By rmcdouga Date 2014-10-03 Time 13:02 Rev Time 0.00
Received By rmcdouga Date 2014-10-03 Time 13:02 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2014-08-21 Cont ID  
Sent By rmcdouga Date 2014-08-21 Time 15:35 Rev Time 0.00
Received By rmcdouga Date 2014-08-21 Time 15:35 Sent To  
Notes
2014-08-21 14:52:572010 FBC
  
 DENIED BY BUILDING
  
 1 THE ENERGY CALCULATIONS FOR THE NEW ROOM HAVE NOT
 BEEN SIGNED AND DATED BY THE PERSON THAT PREPARED THEM.
 2010 FBC ENERGY SECTION 401.2
  
 2) SUBMIT PRODUCT APPROVALS FOR THE NEW WINDOWS THAT
 ARE SHOWN ON THE PLANS AS REQUIRED BY DCA RULE 9N-3.
 THE PRODUCT APPROVAL (NOA NO. 11-0107.10) THAT WAS
 SUBMITTED IS FOR UN-CLIPPED MULLIONS AND IS NOT
 APPLICABLE.
  
 3) THE PRODUCT APPROVAL DRAWINGS THAT WERE SUBMITTED
 FOR THE EXTERIOR DOORS (NOA NO. 09-0415.08) WERE NOT
 SHRUNK TO FIT ON 8.5" X 11" PAPER. PARTS OF THE
 DRAWINGS GOT CUT OFF WHEN THEY WERE PRINTED. SUBMIT
 COMPLETE DRAWINGS. CITY AMENDMENTS 107.2.1 & DCA RULE
 9N-3 THIS PRODUCT APPROVAL IS FOR A GLAZED DOOR THAT IS
 NOT LARGE MISSILE IMPACT RATED. ( PRODUCT APPROVALS FOR
 THE IMPACT PROTECTION DEVICES, A KEY PLAN AND AN
 INSTALLATION SCHEDULE WILL BE REQUIRED. FBCR 301.2.1.2)
 THE MAXIMUM DESIGN PRESSURES FRO THIS DOOR IS LOWER
 THAN THE REQUIRED WINDPRESSURES SPECIFIED ON PAGE 2 OF
 THE PLANS.
  
 4) THE PRODUCT APPROVALS ARE REQUIRED TO BE REVIEWED
 AND APPROVED IN WRITING BY THE DESIGNER OF RECORD FOR
 THE PROJECT. CITY AMENDMENTS 107.3.4.1
  
 5) IN ORDER TO HELP SPEED THE NEXT REVIEW, PLEASE
 SUBMIT A RESPONSE LETTER INDICATING HOW EACH OF THE
 REVIEW COMMENTS HAS BEEN ADDRESSED.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2014-06-24 Cont ID  
Sent By rmcdouga Date 2014-06-24 Time 07:34 Rev Time 0.00
Received By rmcdouga Date 2014-06-24 Time 07:06 Sent To E
Notes
2014-06-24 07:36:092010 FBC
  
 DENIED BY BUILDING
  
 THE FOLLOWING COMMENTS FROM THE PREVIOUS REVIEW HAVE
 NOT BEEN ADDRESSED :
  
 2) SUBMIT ENERGY CALCULATIONS FOR THE NEW ROOM. 2010
 FBC ENERGY SECTION 401.2
  
 3) SPECIFY THE WALL AND CEILING INSULATION ON THE
 PLANS. CITY AMENDMENTS 107.2.1 AND 2010 FBC ENERGY
 SECTION 401.2
  
 4) THE STUCCO ON THE WALL IS REQUIRED TO BE 7/8" THICK
 PER ASTM C 926.
  
 5) SHOW COMPLIANCE WITH FBC R703.6.3 WHICH REQUIRES A
 BOND BREAK BETWEEN THE EXTERIOR STUCCO AND THE
 WATER-RESISTIVE BARRIER REQUIRED BY FBCR 703.1.1.
  
 6) SPECIFY THE SOFFIT COVERING MATERIAL THAT WILL BE
 USED. CITY AMENDMENTS 107.2.1
  
 7) SHOW COMPLIANCE WITH FBCR 806.1 FOR ROOF
 VENTILATION.
  
 8) SPECIFY THE CEILING COVERING MATERIAL ON THE PLANS.
 CITY AMENDMENTS 107.2.1
  
 10) SUBMIT PRODUCT APPROVALS FOR THE NEW EXTERIOR DOOR
 AND WINDOWS THAT ARE SHOWN ON THE PLANS AS REQUIRED BY
 DCA RULE 9N-3.
  
 11) SHOW COMPLIANCE WITH FBCR 301.2.1.2 WHICH REQUIRES
 LARGE MISSILE IMPACT PROTECTION FOR GLAZED OPENINGS. (
 NEW COMMENT. THE REVISED PLANS SPECIFY HURRICANE
 SHUTTERS. SUBMIT TWO COPIES OF THE PRODUCT APPROVALS
 AND AN INSTALLATION SCHEDULE WITH A KEY PLAN. )
  
 13) THE VALUE OF WORK SPECIFIED ON THE APPLICATION OF
 $2500.00 IS LOW. THE VALUE IS TO BE THE COSTS OF ALL
 MATERIALS, LABOR, DESIGN COSTS, OVERHEAD AND PROFIT
 (THE TOTAL REPLACEMENT VALUE FOR THE WORK BEING DONE IS
 TO BE USED). CITY AMENDMENTS 109.3
  
 14) IN ORDER TO HELP SPEED THE NEXT REVIEW, PLEASE
 SUBMIT A RESPONSE LETTER INDICATING HOW EACH OF THE
 REVIEW COMMENTS HAS BEEN ADDRESSED.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2014-05-03 Cont ID  
Sent By rmcdouga Date 2014-05-03 Time 12:18 Rev Time 0.00
Received By rmcdouga Date 2014-05-03 Time 11:11 Sent To  
Notes
2014-05-03 12:07:582010 FBC
  
 DENIED BY BUILDING
  
 1) IDENTIFY THE USE OF THE NEW ROOM ON THE PLANS
 (BEDROOM, DEN, DINING ROOM, ETC.) CITY AMENDMENTS
 107.2.1
  
 2) SUBMIT ENERGY CALCULATIONS FOR THE NEW ROOM. 2010
 FBC ENERGY SECTION 401.2
  
 3) SPECIFY THE WALL AND CEILING INSULATION ON THE
 PLANS. CITY AMENDMENTS 107.2.1 AND 2010 FBC ENERGY
 SECTION 401.2
  
 4) THE STUCCO ON THE WALL IS REQUIRED TO BE 7/8" THICK
 PER ASTM C 926.
  
 5) SHOW COMPLIANCE WITH FBC R703.6.3 WHICH REQUIRES A
 BOND BREAK BETWEEN THE EXTERIOR STUCCO AND THE
 WATER-RESISTIVE BARRIER REQUIRED BY FBCR 703.1.1.
  
 6) SPECIFY THE SOFFIT COVERING MATERIAL THAT WILL BE
 USED. CITY AMENDMENTS 107.2.1
  
 7) SHOW COMPLIANCE WITH FBCR 806.1 FOR ROOF
 VENTILATION.
  
 8) SPECIFY THE CEILING COVERING MATERIAL ON THE PLANS.
 CITY AMENDMENTS 107.2.1
  
 9) SPECIFY THE TYPE OF WINDOWS THAT WILL BE INSTALLED
 ON THE PLANS ( SINGLE HUNG, CASEMENT, FIXED, ETC). CITY
 AMENDMENTS 107.2.1
  
 10) SUBMIT PRODUCT APPROVALS FOR THE NEW EXTERIOR DOOR
 AND WINDOWS THAT ARE SHOWN ON THE PLANS AS REQUIRED BY
 DCA RULE 9N-3.
  
 11) SHOW COMPLIANCE WITH FBCR 301.2.1.2 WHICH REQUIRES
 LARGE MISSILE IMPACT PROTECTION FOR GLAZED OPENINGS.
  
 12) SHOW COMPLIANCE WITH FBCR 314.3.1 FOR REQUIRED
 SMOKE ALARMS.
  
 13) THE VALUE OF WORK SPECIFIED ON THE APPLICATION OF
 $2500.00 IS LOW. THE VALUE IS TO BE THE COSTS OF ALL
 MATERIALS, LABOR, DESIGN COSTS, OVERHEAD AND PROFIT
 (THE TOTAL REPLACEMENT VALUE FOR THE WORK BEING DONE IS
 TO BE USED). CITY AMENDMENTS 109.3
  
 14) IN ORDER TO HELP SPEED THE NEXT REVIEW, PLEASE
 SUBMIT A RESPONSE LETTER INDICATING HOW EACH OF THE
 REVIEW COMMENTS HAS BEEN ADDRESSED.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2014-10-03 Cont ID  
Sent By rmcdouga Date 2014-10-03 Time 14:28 Rev Time 0.00
Received By rmcdouga Date 2014-10-03 Time 14:28 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2014-06-25 Cont ID  
Sent By dhayes Date 2014-06-25 Time 12:28 Rev Time 0.00
Received By dhayes Date 2014-06-25 Time 12:12 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2014-04-30 Cont ID  
Sent By albarran Date 2014-04-30 Time 18:41 Rev Time 0.00
Received By albarran Date 2014-04-30 Time 18:03 Sent To  
Notes
2014-04-30 18:44:13THE PLANS AS SUBMITTED HAVE A NOTE INDICATING THAT
 THERE WILL BE NO ELECTRIC, HVAC OR PLUMBING, BUT AS
 MENTIONED BELOW AN
 ELECTRICAL PERMIT IS NEEDED:
 THERE ARE BOTH FBC & NEC REQUIREMENTS THAT SHALL BE
 COMPLIED WITH. JUST TO NAME A FEW:
 1. FBC-R 303.8 REQUIRES THAT HEATING BE PROVIDED
 2. FBC-R 314.3.1 REQUIRES THAT SMOKE DETECTOR
 COMPLIANCE BE MET
 3. FBC-R 315 MAY COME INTO PLAY IF GAS APPLIANCES OR AN
 ATTACHED GARAGE ARE PART OF THE RESIDENCE.
 4. NEC 210.52 HAS SPECIFIC OUTLET REQUIREMENTS FOR
 DWELLING UNITS
 5. NEC 210.70 HAS MINIMAL LIGHTING REQUIREMENTS
  
 FOR QUESTIONS PLEASE CONTACT: MIKE ALBARRAN, E.P. REV.
 AT (561) 805-6718
  

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2014-10-06 Cont ID  
Sent By jgomez Date 2014-10-06 Time 13:14 Rev Time 0.00
Received By jgomez Date 2014-10-06 Time 13:14 Sent To  
Notes
2014-10-06 13:14:43IMPACT FEES SUBMITTAL. JG.

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2014-10-03 Cont ID  
Sent By rmcdouga Date 2014-10-03 Time 14:27 Rev Time 0.00
Received By rmcdouga Date 2014-09-22 Time 15:18 Sent To  
Notes
2014-09-22 15:18:40RE-SUBMITTAL SENT TO ROBERT MCDOUGAL'S DESK FOR REVIEW.
 JG.

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2014-08-21 Cont ID  
Sent By rmcdouga Date 2014-08-21 Time 15:36 Rev Time 0.00
Received By rmcdouga Date 2014-08-13 Time 18:35 Sent To  
Notes
2014-08-19 18:35:07TO R MCDOUGAL

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2014-06-25 Cont ID  
Sent By dhayes Date 2014-06-25 Time 12:29 Rev Time 0.00
Received By dhayes Date 2014-06-13 Time 16:05 Sent To  
Notes
2014-06-13 16:06:25TO R.M'S DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-05-03 Cont ID  
Sent By rmcdouga Date 2014-05-03 Time 12:19 Rev Time 0.00
Received By rmcdouga Date 2014-04-16 Time 08:16 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 4 Status P Date 2014-10-06 Cont ID  
Sent By jgomez Date 2014-10-06 Time 13:14 Rev Time 0.00
Received By jgomez Date 2014-10-06 Time 13:14 Sent To  
Notes
2014-10-06 13:15:41IMPACT FEES PAID $180.65. MU-2014-021885. JG.

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 3 Status F Date 2014-10-03 Cont ID  
Sent By rmcdouga Date 2014-10-03 Time 14:26 Rev Time 0.00
Received By rmcdouga Date 2014-10-03 Time 14:26 Sent To  
Notes
2014-10-03 14:26:59AN IMPACT FEE REVIEW IS REQUIRED.

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status F Date 2014-08-21 Cont ID  
Sent By rmcdouga Date 2014-08-21 Time 14:44 Rev Time 0.00
Received By rmcdouga Date 2014-08-13 Time 15:14 Sent To  
Notes
2014-08-21 14:45:37AN IMPACT FEE REVIEW IS REQUIRED.
2014-08-14 15:14:22SENT TO R MCDOUGAL

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2014-05-03 Cont ID  
Sent By rmcdouga Date 2014-05-03 Time 11:15 Rev Time 0.00
Received By rmcdouga Date 2014-05-03 Time 11:11 Sent To  
Notes
2014-05-03 11:15:53AFTER THE PLANS HAVE BEEN APPROVED, ONE SET OF THE
 APPROVED PLANS WILL NEED TO BE SIGNED OUT AND TAKEN TO
 PALM BEACH COUNTY FOR AN IMPACT FEE REVIEW. THE PLANS
 WITH THE IMPACT FEE REVIEW STAMP AND A COPY OF THE PAID
 IMPACT FEE RECEIPT MUST BE RETURNED TO THE CITY
 BUILDING DEPARTMENT BEFORE THE BUILDING PERMIT CAN BE
 ISSUED.

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2014-06-24 Cont ID  
Sent By rmcdouga Date 2014-06-24 Time 07:06 Rev Time 0.00
Received By rmcdouga Date 2014-06-24 Time 07:06 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2014-05-03 Cont ID  
Sent By rmcdouga Date 2014-05-03 Time 11:08 Rev Time 0.00
Received By rmcdouga Date 2014-05-03 Time 11:08 Sent To  
Notes
2014-05-03 11:28:392010 FBC
  
 DENIED BY MECHANICAL
  
 1) THE PURPOSE / USE OF THIS NEW ROOM IS NOT SPECIFIED
 ON THE PLANS. FBCR 303.8 REQUIRES HABITABLE SPACE TO BE
 PROVIDED WITH HEATING FACILITIES CAPABLE OF MAINTAINING
 A MINIMUM ROOM TEMPERATURE OF 68 DEGREES AT THE DESIGN
 TEMPERATURE. SHOW HOW THIS REQUIREMENT WILL BE MET.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop P PLUMBING
Rev No 1 Status N Date 2014-05-03 Cont ID  
Sent By rmcdouga Date 2014-05-03 Time 11:08 Rev Time 0.00
Received By rmcdouga Date 2014-05-03 Time 11:08 Sent To  
Notes
2014-05-03 11:11:19NO PLUMBING WORK IS SHOWN ON THE PLANS. A SEPARATE
 PERMIT, APPLICATION AND REVIEW IS REQUIRED FOR A
 PLUMBING PERMIT.

Review Stop Z ZONING
Rev No 1 Status P Date 2014-04-22 Cont ID  
Sent By jroach Date 2014-04-22 Time 10:24 Rev Time 0.00
Received By jroach Date 2014-04-21 Time 16:06 Sent To  
Notes
2014-04-21 15:14:044/21/14