| 2014-04-16 19:11:48 | W P B ADMINISTRATIVE: CODE 108.2 SCHEDULE OF PERMIT |
| | FEES. ON BUILDINGS, STRUCTURES, ELECTRICAL, GAS, |
| | MECHANICAL AND PLUMBING SYSTEMS OR ALTERATIONS |
| | REQUIRING A PERMIT, A FEE FOR EACH PERMIT SHALL BE PAID |
| | AS REQUIRED, IN ACCORDANCE WITH THE SCHEDULE |
| | ESTABLISHED BY THE APPLICABLE GOVERNING AUTHORITY. |
| | 108.3* BUILDING PERMIT VALUATION. |
| | IF, IN THE OPINION OF THE BUILDING OFFICIAL, THE |
| | CLAIMED VALUATION OF BUILDING, ALTERATION, STRUCTURE, |
| | ELECTRICAL, GAS, MECHANICAL, OR PLUMBING SYSTEMS |
| | APPEARS TO BE UNDER ESTIMATED ON THE APPLICATION, THE |
| | PERMIT SHALL BE DENIED. FOR PERMITTING PURPOSES, |
| | VALUATION OF BUILDINGS AND SYSTEMS SHALL BE TOTAL |
| | REPLACEMENT PURPOSES, VALUATION OF BUILDINGS AND |
| | SYSTEMS SHALL BE THE TOTAL REPLACEMENT VALUE TO INCLUDE |
| | STRUCTURAL, ELECTRICAL, PLUMBING, MECHANICAL, INTERIOR |
| | FINISHES, NORMAL SITE WORK (EXCAVATION AND BACKFILL FOR |
| | BUILDINGS), ARCHITECTURAL AND DESIGN FEES, MARKETING |
| | COST, OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE. |
| | VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED |
| | DATA OF NATIONAL CONSTRUCTION COST ANALYSIS SERVICES |
| | (MARSHALL-SWIFT, MEANS, ETC.) WITH REGIONAL ADJUSTMENTS |
| | FOR LOCATION AS PUBLISHED BY THE INTERNATIONAL CODE |
| | CONGRESS. |
| | |