| Plan Review Stops For Permit 14031088 |
| Review Stop |
G |
GAS REVIEW |
| Rev No |
2 |
Status |
P |
Date |
2014-03-28 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-03-28 |
Time |
09:28 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-03-28 |
Time |
09:28 |
Sent To |
|
|
| Notes |
| 2014-03-28 09:29:26 | CONTRACTOR PROVIDED THE REQUESTED INFORMATION VIA A | | | PHONE CALL. |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2014-03-27 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-03-27 |
Time |
17:47 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-03-27 |
Time |
17:47 |
Sent To |
|
|
| Notes |
| 2014-03-27 18:05:10 | 2010 FBC | | | | | | DENIED | | | | | | 1) SPECIFY THE TYPE OF PIPING MATERIAL BEING USED. | | | | | | 2) INDICATE THE DELIVERY PRESSURE. IF NATURAL GAS | | | SPECIFY .5 PSI OR 2 PSI. FBCR G2413.2 | | | | | | 3) SPECIFY THE TOTAL LOAD ON THE SYSTEM AND THE | | | DISTANCE FROM THE METER TO THE MOST REMOTE OUTLET IN | | | THE SYSTEM. FBCR APPENDIX A SECTION A.3.1(4) | | | | | | 4) SPECIFY THE LOCATION OF THE NEW TANKLESS WATER | | | HEATER AND SHOW THAT IT'S LOCATION COMPLIES WITH THE | | | MANUFACTURER'S REQUIRED CLEARANCES FROM OPENINGS AND | | | COMBUSTIBLES. | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | [email protected] |
|
|
|