| Plan Review Stops For Permit 14030485 |
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
P |
Date |
2014-03-19 |
|
|
Cont ID |
|
| Sent By |
mgonzale |
Date |
2014-03-19 |
Time |
|
Rev Time |
1.00 |
| Received By |
mgonzale |
Date |
2014-03-19 |
Time |
|
Sent To |
I |
|
| Notes |
| 2014-03-19 13:06:38 | PASSED - NO OBJECTIONS |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2014-03-19 |
|
|
Cont ID |
|
| Sent By |
swurafti |
Date |
2014-03-19 |
Time |
14:05 |
Rev Time |
0.00 |
| Received By |
swurafti |
Date |
2014-03-12 |
Time |
14:05 |
Sent To |
|
|
| Notes |
| 2014-03-12 14:24:19 | ROUTED TO PLUMBING LESS THAN $5000 |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2014-03-13 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2014-03-13 |
Time |
06:31 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2014-03-13 |
Time |
06:23 |
Sent To |
|
|
| Notes |
| 2014-03-13 06:31:10 | PLUMBING PROVISO: | | | 2010 FBC-P 1003.5.3 INLET AND OUTLET PIPING. | | | THE INLET INVERT SHALL DISCHARGE A MINIMUM 21/2 INCHES | | | ABOVE THE LIQUID | | | LEVEL LINE AND THE OUTLET PIPE SHALL HAVE A TEE WITH A | | | MINIMUM DIAMETER OF | | | 4 INCHES THAT EXTENDS TO WITHIN 8 INCHES OF THE BOTTOM | | | OF THE TANK. THE | | | TEE SHALL BE INSTALLED WITH THE RUN IN THE VERTICAL | | | DIRECTION. |
|
|
|