Plan Review Details - Permit 14030485
Plan Review Stops For Permit 14030485
Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2014-03-19 Cont ID  
Sent By mgonzale Date 2014-03-19 Time   Rev Time 1.00
Received By mgonzale Date 2014-03-19 Time   Sent To I
Notes
2014-03-19 13:06:38PASSED - NO OBJECTIONS

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-03-19 Cont ID  
Sent By swurafti Date 2014-03-19 Time 14:05 Rev Time 0.00
Received By swurafti Date 2014-03-12 Time 14:05 Sent To  
Notes
2014-03-12 14:24:19ROUTED TO PLUMBING LESS THAN $5000

Review Stop P PLUMBING
Rev No 1 Status P Date 2014-03-13 Cont ID  
Sent By jwitmer Date 2014-03-13 Time 06:31 Rev Time 0.00
Received By jwitmer Date 2014-03-13 Time 06:23 Sent To  
Notes
2014-03-13 06:31:10PLUMBING PROVISO:
 2010 FBC-P 1003.5.3 INLET AND OUTLET PIPING.
 THE INLET INVERT SHALL DISCHARGE A MINIMUM 21/2 INCHES
 ABOVE THE LIQUID
 LEVEL LINE AND THE OUTLET PIPE SHALL HAVE A TEE WITH A
 MINIMUM DIAMETER OF
 4 INCHES THAT EXTENDS TO WITHIN 8 INCHES OF THE BOTTOM
 OF THE TANK. THE
 TEE SHALL BE INSTALLED WITH THE RUN IN THE VERTICAL
 DIRECTION.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved