Plan Review Details - Permit 14021046
Plan Review Stops For Permit 14021046
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2014-05-21 Cont ID  
Sent By skennedy Date 2014-05-21 Time 07:41 Rev Time 0.00
Received By skennedy Date 2014-05-21 Time 07:41 Sent To  
Notes
2014-05-21 07:47:042ND REVIEW, NOTE THIS PLAN IS TRAVELING WITH 14021045
 AS THE DRAWINGS WERE SUBMITTED TO APPLY TO BOTH
 PERMITS:
  
 FBC 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
 CONSTRUCTION DOCUMENTS SHALL BE
 DIMENSIONED AND DRAWN UPON SUITABLE MATERIAL.
 ELECTRONIC MEDIA DOCUMENTS SHALL BE
 SUBMITTED WHEN APPROVED BY THE BUILDING OFFICIAL.
 CONSTRUCTION DOCUMENTS SHALL BE OF SUFFICIENT
 CLARITY TO INDICATE THE LOCATION, NATURE AND EXTENT OF
 THE WORK PROPOSED AND SHOW IN
 DETAIL THAT IT WILL CONFORM TO THE PROVISIONS OF THIS
 CODE AND RELEVANT LAWS, ORDINANCES, RULES
 AND REGULATIONS, AS DETERMINED BY THE BUILDING
 OFFICIAL.
  
 PROVIDE CLEAR DETAILS IN THE AREA WHERE A WINDOW IS TO
 BE REMOVED AND SEALED UP IN THE REAR EXTERIOR WALL.ON
 THE WALL FRAMING AND ACCHORING TO RESIST DESIGN
 PRESSURES, AND PROVID DESIGN PRESSURES. SHOW, WEATHER
 PROOFING, INTERIOR AND EXTERIOR SURFACES.
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2014-03-03 Cont ID  
Sent By shill Date 2014-03-03 Time 11:38 Rev Time 0.00
Received By shill Date 2014-03-03 Time 11:38 Sent To  
Notes
2014-03-03 11:38:41****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. PROVIDE PLANS WHICH SCOPE AND NATURE OF PROPOSED
 IMPROVEMENT, FBC 107.
  
 2. VALUE IS TO INCLUDE THE ***VALUE*** OF LABOR,
 MATERIALS, OVERHEAD, PROFIT, ENGINEERING/ARCHITECTURE,
 FBC 109. PROVIDE AN ITEMIZED COST BREAKDOWN. FBC 109.
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2014-05-22 Cont ID  
Sent By skennedy Date 2014-05-22 Time 05:59 Rev Time 0.00
Received By skennedy Date 2014-04-23 Time 17:18 Sent To  
Notes
2014-05-21 07:48:08TRAVELING WITH 14021045 AND THEREFORE CANNOT BE LOGGED
 OUT UNTIL IT IS LOGGED OUT.
2014-05-19 18:45:045/19 TO SK DESK
  
2014-04-24 17:18:27SENT TO S HILL

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-03-03 Cont ID  
Sent By shill Date 2014-03-03 Time 11:38 Rev Time 0.00
Received By shill Date 2014-02-28 Time 06:18 Sent To  
Notes
2014-02-28 06:19:23INCOMING SENT TO BLDG <$5K BOX. JW

Review Stop Z ZONING
Rev No 1 Status P Date 2014-05-21 Cont ID  
Sent By sgraham Date 2014-05-21 Time 14:23 Rev Time 0.00
Received By sgraham Date 2014-05-21 Time 14:23 Sent To B
Notes
2014-05-21 14:25:505/21/14 ZONING FAILED
  
 1. THIS GARAGE WAS NEVER A LEGAL GARAGE APARTMENT, THE
 ZONING IS APPROVED FOR A GARAGE APARTMENT BUT THE PLANS
 MUST SHOW ALL THE CONSTRUCTION LEGALLY CONVERTED THE
 GARAGE TO AN APARTMENT.
 2. PROVIDE 2- SURVEYS


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved