Review Stop E ELECTRICAL
Rev No 2 Status P Date 2014-03-10 Cont ID  
Sent By dhayes Date 2014-03-10 Time 15:01 Rev Time 0.00
Received By dhayes Date 2014-03-10 Time 15:01 Sent To  
Notes
2014-03-10 15:22:22TEMPORARY ELECTRIC ONLY. CHILLER IS DOWN. RENTAL
 EQUIPMENT TIED IN VIA HARDUSE PPE CABLE AND CAMLOK
 TERMINATIONS. ADDITIONAL PERMITS ARE REQUIRED FOR
 INSTALLATION OF NEW PERMENANT ELECTRICAL INSTALLATION
 FOR NEW CHILLER AND PUMPS.

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2014-03-05 Cont ID  
Sent By dhayes Date 2014-03-05 Time 13:16 Rev Time 0.00
Received By dhayes Date 2014-03-05 Time 13:15 Sent To  
Notes
2014-03-05 13:58:39THE PLAN SUBMITTED IS DEFICIENT IN THE FOLLOWING AREAS:
 FBC 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
 CONSTRUCTION DOCUMENTS SHALL BE DIMENSIONED AND DRAWN
 UPON SUITABLE MATERIAL. ELECTRONIC MEDIA DOCUMENTS
 SHALL BE SUBMITTED WHEN APPROVED BY THE BUILDING
 OFFICIAL. CONSTRUCTION DOCUMENTS SHALL BE OF SUFFICIENT
 CLARITY TO INDICATE THE LOCATION, NATURE AND EXTENT OF
 THE WORK PROPOSED AND SHOW IN DETAIL THAT IT WILL
 CONFORM TO THE PROVISIONS OF THIS CODE AND RELEVANT
 LAWS, ORDINANCES, RULES AND REGULATIONS, AS DETERMINED
 BY THE BUILDING OFFICIAL. SUCH DRAWINGS AND
 SPECIFICATIONS SHALL CONTAIN INFORMATION, IN THE FORM
 OF NOTES OR OTHERWISE, AS TO THE QUALITY OF MATERIALS,
 WHERE QUALITY IS ESSENTIAL TO CONFORMITY WITH THE
 TECHNICAL CODES. SUCH INFORMATION SHALL BE SPECIFIC,
 AND THE TECHNICAL CODES SHALL NOT BE CITED AS A WHOLE
 OR IN PART, NOR SHALL THE TERM "LEGAL" OR ITS
 EQUIVALENT BE USED AS A SUBSTITUTE FOR SPECIFIC
 INFORMATION. ALL INFORMATION, DRAWINGS, SPECIFICATIONS
 AND ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE
 OF THE PERSON RESPONSIBLE FOR THE DESIGN. (SEE ALSO
 SECTION 107.3.5)..
 FBC 107.3.5. ELECTRICAL_OVERCURRENT PROTECTION,
 GROUNDING, WIRING METHODS AND MATERIALS. MORE DETAIL
 REQUIRED IN ALL OF THESE AREAS.
 FBC 107.2.5 THE CONSTRUCTION DOCUMENTS SUBMITTED WITH
 THE APPLICATION FOR PERMIT SHALL BE ACCOMPANIED BY A
 SITE PLAN SHOWING TO SCALE THE SIZE AND LOCATION OF NEW
 CONSTRUCTION
 AND EXISTING STRUCTURES ON THE SITE, DISTANCES FROM LOT
 LINES, THE ESTABLISHED STREET GRADES AND THE PROPOSED
 FINISHED GRADES AND, AS APPLICABLE, FLOOD HAZARD AREAS,
 FLOODWAYS, AND DESIGN FLOOD ELEVATIONS; AND IT SHALL BE
 DRAWN IN ACCORDANCE WITH AN ACCURATE BOUNDARY LINE
 SURVEY. IN THE CASE OF DEMOLITION, THE SITE PLAN SHALL
 SHOW CONSTRUCTION TO BE DEMOLISHED AND THE LOCATION AND
 SIZE OF EXISTING STRUCTURES AND CONSTRUCTION THAT ARE
 TO REMAIN ON THE SITE OR PLOT. THE BUILDING OFFICIAL IS
 AUTHORIZED TO WAIVE OR MODIFY THE REQUIREMENT FOR A
 SITE PLAN WHEN THE APPLICATION FOR PERMIT IS FOR
 ALTERATION OR REPAIR OR WHEN OTHERWISE WARRANTED.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2014-03-10 Cont ID  
Sent By dhayes Date 2014-03-10 Time 15:01 Rev Time 0.00
Received By dhayes Date 2014-03-10 Time 15:01 Sent To  
Notes
2014-03-06 18:36:17RESUBMITTAL SENT TO ELECTRICAL UNDER $5000 SHELF FOR
 REVIEW. JG.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-03-05 Cont ID  
Sent By dhayes Date 2014-03-05 Time 13:15 Rev Time 0.00
Received By dhayes Date 2014-03-05 Time 13:15 Sent To  
Notes
2014-02-26 09:25:51ROUTED TO ELECTRICAL