Plan Review Details - Permit 14011263
Plan Review Stops For Permit 14011263
Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2014-02-04 Cont ID  
Sent By Mgonzale Date 2014-02-04 Time   Rev Time 0.25
Received By mgonzale Date 2014-02-04 Time   Sent To Z
Notes
2014-02-04 11:30:05POLLUTION PREVENTION PLAN MUST BE ACTIVE DURING AND
 AFTER DEMOLITION UNTIL A BUILDING PERMIT IS APPLIED
 FOR.
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES AND PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2014-02-04 Cont ID  
Sent By llouie Date 2014-02-04 Time 13:51 Rev Time 0.00
Received By llouie Date 2014-01-29 Time 08:53 Sent To  
Notes
2014-01-30 08:54:10SENT TO ZONING BOX.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-01-27 Cont ID  
Sent By llouie Date 2014-01-27 Time 13:23 Rev Time 0.00
Received By llouie Date 2014-01-27 Time 13:20 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2014-01-31 Cont ID  
Sent By llouie Date 2014-01-31 Time 11:19 Rev Time 0.00
Received By llouie Date 2014-01-31 Time 11:19 Sent To ENG
Notes
2014-01-31 11:21:16ZONING APPROVED WITH THE FOLLOWING PROVISOS:
  
 1.) TEMPORARY FENCE SHALL BE MAINTAINED IN A
 SATISFACTORY MANNER AT ALL TIMES.
  
 2.) GATES SHALL BE CHAINED AND LOCKED WITH A LOCK
 SUBSTANTIAL ENOUGH TO ENSURE CLOSURE AND SECURITY WHEN
 WORKERS ARE NOT ON THE JOB SITE.

Review Stop Z ZONING
Rev No 1 Status F Date 2014-01-27 Cont ID  
Sent By llouie Date 2014-01-27 Time 13:20 Rev Time 0.00
Received By llouie Date 2014-01-27 Time 13:20 Sent To I
Notes
2014-01-27 13:21:33** FAILED **
  
 PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE
 COMMENTS IN WRITING AND/OR ON THE PLANS WHERE
 APPLICABLE:
  
 1.) SCREENING DETAILS SHALL BE SUBMITTED. WIND
 SCREENING SHALL BE SUBSTANTIAL ENOUGH TO AVOID
 RIPS/TEARS DUE TO WIND OR SUN, AND SHALL HAVE NO LESS
 THAN 85 PERCENT OPACITY. (ZLDR S.94-450(E)(2)5.)
  
 2.) EROSION CONTROL MEASURES ARE REQUIRED. A STORMWATER
 POLLUTION PREVENTION PLAN (SWPPP), IN COMPLIANCE WITH
 THE CITY?S STORMWATER MANAGEMENT PROGRAM, SHALL BE
 SUBMITTED AND APPROVED BY THE CITY PRIOR TO THE
 COMMENCEMENT OF LAND DEVELOPMENT ACTIVITIES. PROVIDE
 DOCUMENTATION THAT A SWPPP HAD BEEN APPROVED FOR THE
 PROJECT. (ZLDR S.94-450(E)(3))
  
 3.) CONTRACTORS APPLYING FOR A BUILDING PERMIT TO
 PERFORM LAND DEVELOPMENT ACTIVITIES SHALL POST AN
 EROSION CONTROL BOND OR DEPOSIT FOR THE EROSION CONTROL
 MEASURES APPROVED BY THE SWPPP. PROVIDE DOCUMENTATION
 THAT AN EROSION CONTROL BOND OR DEPOSIT FOR THE EROSION
 CONTROL MEASURES APPROVED BY THE SWPPP HAD BEEN
 APPROVED. (ZLDR S.94-450(F))
  
 PLEASE NOTE THAT ANY REVISIONS MAY RESULT IN ADDITIONAL
 COMMENTS. CONTACT LINDA LOUIE @ (561) 822-1442 IF YOU
 HAVE QUESTIONS.
  