| Plan Review Stops For Permit 14010138 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2014-01-15 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-01-15 |
Time |
10:41 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-01-15 |
Time |
07:30 |
Sent To |
E |
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2014-02-24 |
|
|
Cont ID |
|
| Sent By |
albarran |
Date |
2014-02-24 |
Time |
11:52 |
Rev Time |
0.00 |
| Received By |
albarran |
Date |
2014-02-24 |
Time |
11:36 |
Sent To |
Z |
|
| Notes |
| 2014-02-24 12:02:47 | ROUTED TO ZONING |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2014-01-15 |
|
|
Cont ID |
|
| Sent By |
albarran |
Date |
2014-01-15 |
Time |
12:24 |
Rev Time |
0.00 |
| Received By |
albarran |
Date |
2014-01-15 |
Time |
12:10 |
Sent To |
I |
|
| Notes |
| 2014-01-15 12:29:15 | THE FOLLOWING ITEMS NEED TO BE PROVIDED FOR APPROVAL OF | | | THIS PERMIT: | | | 1. PROVIDE A LOAD CALC DATA SHEET ALONG WITH PANEL | | | SCHEDULES FOR THIS PROJECT. | | | 2. INDICATE THE PROPOSED CONDUCTOR INSULATION AND | | | FEEDER SCHEDULES | | | 3. INDICATE LOCATION OF POWER SOURCE. |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
N |
Date |
2014-01-15 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-01-15 |
Time |
09:33 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-01-15 |
Time |
09:33 |
Sent To |
|
|
| Notes |
| 2014-01-15 09:46:51 | NO GAS SHOWN ON PLANS. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2014-04-01 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
2014-04-01 |
Time |
07:55 |
Rev Time |
0.00 |
| Received By |
llouie |
Date |
2014-03-28 |
Time |
08:15 |
Sent To |
|
|
| Notes |
| 2014-03-31 08:23:38 | SENT TO ZONING BOX |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2014-02-21 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2014-02-26 |
Time |
13:24 |
Rev Time |
0.00 |
| Received By |
llouie |
Date |
2014-02-20 |
Time |
14:39 |
Sent To |
E |
|
| Notes |
| 2014-02-21 14:40:47 | TO MA DESK. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2014-01-16 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2014-01-16 |
Time |
11:05 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2014-01-06 |
Time |
11:08 |
Sent To |
|
|
| Notes |
| 2014-01-15 12:30:08 | SH DESK | | 2014-01-06 11:08:17 | ROUTED TO ZONING |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2014-01-15 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-01-15 |
Time |
09:22 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-01-15 |
Time |
07:30 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
P |
Date |
2014-04-01 |
|
|
Cont ID |
|
| Sent By |
LLouie |
Date |
2014-04-01 |
Time |
|
Rev Time |
0.00 |
| Received By |
llouie |
Date |
2014-04-01 |
Time |
07:52 |
Sent To |
I |
|
| Notes |
| 2014-04-01 07:55:06 | MINOR PD AMENDMENT #PB1180LL APPROVED ON 3/27/2014. | | | | | 2014-03-31 12:30:22 | 3/31/14 ZONING RECEIVED SENT TO LL SG |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
2014-02-26 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
2014-02-26 |
Time |
12:13 |
Rev Time |
0.00 |
| Received By |
llouie |
Date |
2014-02-26 |
Time |
12:13 |
Sent To |
|
|
| Notes |
| 2014-02-26 12:15:45 | 2/26/14 - ZONING FAILED - REQUIRES MINOR PD AMENDMENT | | | APPROVAL PRIOR TO BUILDING PERMIT. AWAITING MINOR PD | | | AMENDMENT APPROVAL (CASE NO. PB 1180LL/Z14020015). | | | | | | | | 2014-02-25 15:10:55 | 2/25/14 SENT TO LL. SG | | 2014-02-24 14:05:48 | 2/24/14 SENT TI LL.SG |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2014-01-10 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
2014-01-10 |
Time |
13:43 |
Rev Time |
0.00 |
| Received By |
llouie |
Date |
2014-01-10 |
Time |
13:43 |
Sent To |
P |
|
| Notes |
| 2014-01-10 13:43:39 | ** FAILED ** | | | | | | PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE | | | COMMENTS IN WRITING AND/OR ON THE PLANS WHERE | | | APPLICABLE: | | | | | | 1.) A MINOR AMENDMENT TO THE BRIAR BAY PLANNED | | | DEVELOPMENT, MASTER PLAN IS REQUIRED. AN APPLICATION | | | WILL NEED TO BE FILED TO THE PLANNING AND ZONING | | | DEPARTMENT AND APPROVED PRIOR TO SIGN-OFF OF BUILDING | | | PERMIT. THE COMMENTS BELOW REFLECT THE INFORMATION | | | NEEDED ON THE SITE PLAN PRIOR TO SUBMITTAL OF THE MINOR | | | AMENDMENTS TO THE BRIAR BAY PLANNED DEVELOPMENT. | | | | | | 2.) THE LOCATION OF THE PROPOSED SPLASH PAD IS LOCATED | | | BETWEEN TWO EXISTING TENNIS COURTS. ILLUSTRATE ACCESS, | | | SEPARATION AND CIRCULATION TO THE SPLASH PAD WITH | | | ADJACENT USES. | | | | | | 3.) WILL THE PROPOSED SPLASH PAD AREA CONNECT TO THE | | | EXISTING POOL AREA? | | | | | | 4.) AN ADEQUATE POOL BARRIER SHALL BE INSTALLED TO | | | OBSTRUCT ACCESS. BARRIERS OR FENCES SHALL BE AT LEAST 4 | | | FT. IN HEIGHT ABOVE GRADE. (ZLDR S.94-304(D)) | | | | | | 5.) WILL LANDSCAPING BE PROVIDED AROUND THE PROPOSED | | | SPLASH PAD? IF SO, LANDSCAPE DETAILS IN A LANDSCAPE | | | PLAN SHALL BE SUBMITTED. | | | | | | 6.) THE APPLICATION FOR A MINOR PD AMENDMENT CAN BE | | | FOUND FOLLOWING THIS LINK: HTTP://WPB.ORG/PLANNING/WP-C | | | ONTENT/UPLOADS/SITES/37/2013/06/2013-DEVELOPMENT-APPLIC | | | ATION-REVISED-06.06.2013.PDF | | | | | | PLEASE NOTE THAT ANY REVISIONS MAY RESULT IN ADDITIONAL | | | COMMENTS. CONTACT LINDA LOUIE @ (561) 822-1442 IF YOU | | | HAVE QUESTIONS. |
|
|