Plan Review Details - Permit 13120835
| Plan Review Stops For Permit 13120835 |
| Review Stop |
G |
GAS REVIEW |
| Rev No |
3 |
Status |
P |
Date |
2014-07-22 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-07-22 |
Time |
12:52 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-07-22 |
Time |
12:52 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
2 |
Status |
F |
Date |
2014-06-30 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-06-30 |
Time |
09:22 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-06-30 |
Time |
08:15 |
Sent To |
|
|
| Notes |
| 2014-06-30 10:03:25 | 2010 FBC | | | | | | GAS PLAN IS DENIED | | | | | | 1) BASED ON THE GAS RISER PLAN THAT WAS SUBMITTED, THE | | | LONGEST PIPE RUN FROM THE POINT OF DELIVERY TO THE MOST | | | REMOTE OUTLET IS 165 FEET AND THE TOTAL LOAD ON THE | | | SYSTEM IS 1,221,000 BTU. THE 3/4" PE PIPE THAT IS | | | SPECIFIED IS TOO SMALL. IT IS RATED FOR 791,000 BTU 175 | | | FEET PER FBCR TABLE G2413.4(8) & TABLE 402.4(20). 1" PE | | | PIPE WILL BE REQUIRED FROM THE POINT OF DELIVERY TO THE | | | POINT WHERE TO LOAD IS REDUCED TO 791,000 BTU FROM THAT | | | POINT IT CAN BE REDUCED TO 3/4" PE PIPE. PLEASE | | | CORRECT. | | | | | | 2) THE LENGTH OF THE BRANCH PIPE SECTION, SIZE AND PIPE | | | MATERIAL IS NOT SPECIFIED ON THE PLAN FOR THE BBQ. FBCR | | | G2413 (402) | | | | | | 3) THE LENGTH OF THE BRANCH PIPE SECTION, AND PIPE | | | MATERIAL IS NOT SPECIFIED ON THE PLAN FOR THE POOL | | | HEATER. FBCR G2413 (402) | | | | | | 4) THE LENGTH OF THE BRANCH PIPE SECTION AND PIPE | | | MATERIAL IS NOT SPECIFIED ON THE PLAN FOR THE FUTURE | | | DRYER. FBCR G2413 (402) | | | | | | 5) THE NAME, SIGNATURE AND LICENSE NUMBER OF THE PERSON | | | RESPONSIBLE FOR THE DESIGN IS REQUIRED ON THE GAS RISER | | | PLANS. CITY AMENDMENTS 107.2.1 | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | [email protected] |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2014-01-14 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-01-14 |
Time |
10:45 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-01-14 |
Time |
06:41 |
Sent To |
|
|
| Notes |
| 2014-01-14 08:21:25 | 2010 FBC | | | | | | DENIED | | | | | | 1) SUBMIT TWO LEGIBLE SETS OF A GAS RISER DIAGRAM. THE | | | ONES THAT WERE SUBMITTED ARE NOT CLEAR ENOUGH TO BE | | | FILED FOR PUBLIC RECORD. CITY AMENDMENTS 107.2.1.4 | | | | | | 2) SPECIFY THE DISTANCE FROM EACH SECOND STAGE | | | REGULATOR TO THE APPLIANCE, THE PIPING MATERIAL AND | | | SIZE PER .5 PSI TABLES. FBCFG 401.8 | | | | | | 3) SUBMIT THE SPEC. SHEET FOR THE GAS FIRE PLACE | | | EQUIPMENT SHOWING THAT ONLY THE 25,000 BTUS THAT ARE | | | SPECIFIED ON THE GAS PLAN IS REQUIRED. OTHERWISE THE | | | 80,000 BTUS SPECIFIED IN FBC FUEL GAS TABLE 402.2 FOR | | | GAS LOGS SHALL BE USED. FBCFG 402.2 | | | | | | 4) SUBMIT THE MANUFACTURER'S SPECIFICATIONS THAT | | | INDICATE THE REQUIRED BTUS FOR THE GENERATOR. THE | | | INFORMATION I GOT ON LINE IS 240,000 BTUS FOR NATURAL | | | GAS. 225.000 BTUS IS WHAT IS SPECIFIED ON THE GAS | | | DRAWING. | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | [email protected] |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2014-07-22 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-07-22 |
Time |
12:52 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-07-19 |
Time |
09:12 |
Sent To |
|
|
| Notes |
| 2014-07-19 09:13:24 | SENT TO R MCDOUGAL |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2014-06-30 |
|
|
Cont ID |
|
| Sent By |
RM |
Date |
2014-06-30 |
Time |
09:22 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-06-20 |
Time |
13:43 |
Sent To |
G |
|
| Notes |
|
|
|