| Plan Review Stops For Permit 13120466 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2014-06-17 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-06-17 |
Time |
07:26 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-06-17 |
Time |
07:26 |
Sent To |
|
|
| Notes |
| 2014-06-17 07:26:46 | PROCESS APPROVED PLANS. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2014-06-14 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-06-14 |
Time |
09:03 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-06-13 |
Time |
17:52 |
Sent To |
Z |
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2014-04-26 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-04-26 |
Time |
07:32 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-04-25 |
Time |
18:47 |
Sent To |
|
|
| Notes |
| 2014-04-25 18:59:24 | 2010 FBC | | | | | | DENIED BY BUILDING | | | | | | 1) THE PRODUCT APPROVAL FOR THE TRULITE SINGLE HUNG | | | WINDOWS (NOA NO.12-0118.16) EXPIRED IN 2012. SUBMIT A | | | CURRENT PRODUCT APPROVAL THAT HAS BEEN APPROVED BY THE | | | DESIGNER OF RECORD. DCA RULE 9N-3 AND CITY AMENDMENTS | | | 107.3.4.1 | | | | | | 2) SPECIFY WHICH ONE OF THE APPROVED ASSEMBLIES FROM | | | THE GAF SELF-ADHERING ROOFING SYSTEM (NOA NO. | | | 14-0102.12) WILL BE USED. SPECIFY THE FASTENING OPTION | | | AND MAXIMUM DESIGN PRESSURE FOR THE SYSTEM. SUBMIT TWO | | | SETS OF SIGNED AND SEALED RAS 117 CALCULATIONS FOR | | | ENHANCED FASTENING AT THE CORNER AND PERIMETER AREAS IN | | | ACCORDANCE WITH LIMITATION NUMBER 7 OF THE NOA. FBCR | | | 301.1 | | | | | | 3) CLARIFY WHERE THE MTS 20 STRAPS SPECIFIED ON PAGE 6 | | | ARE TO BE USED. THE WALL SECTION ON PAGE 3 SHOWS A | | | SIMPSON H10 CONNECTOR AT EACH RAFTER. CITY AMENDMENTS | | | 107.2.1 | | | | | | 4) THE FASTENERS THAT ARE SPECIFIED FOR THE MTS 20 | | | STRAPS ARE INCORRECT. TAPCONS ARE NOT APPROVED | | | FASTENERS FOR SIMPSON CONNECTORS. THEY REQUIRE TITAN | | | MASONRY SCREWS. THE MTS 20 REQUIRES (7) 10D X 1-1/2" | | | INTO THE TRUSS AND (7) 10D X 1-1/2" INTO THE WALL PLATE | | | FOR A TOTAL OF 14 FASTENERS FOR WOOD TO WOOD | | | CONNECTIONS. YOU WILL NEED TO PROVIDE DOCUMENTATION | | | FROM SIMPSON IF YOU WISH TO MODIFY THE INTENDED AND | | | TESTED USE OR FASTENERS. FBCR 301.1 AND DCA RULE 9N-3 | | | | | | 5) PLEASE CLARIFY THE ENHANCED NAILING PATTERN FOR | | | ROOFING NOTE ON PAGE 6. IF THIS IS INTENDED FOR THE | | | BASE SHEET ATTACHMENT OF THE GAF SELF-ADHERING ROOFING | | | SYSTEM (NOA NO. 14-0102.12), IT IS NOT ACCEPTABLE. RAS | | | 117 CALCULATIONS ARE REQUIRED FOR THAT AS STATED ABOVE. | | | CITY AMENDMENTS 107.2.1 | | | | | | 6) THE VALUE OF THE WORK ON THE APPLICATION IS | | | $2000.00. THIS IS TOO LOW. INCLUDE THE VALUE OF ALL THE | | | WORK DONE WITHOUT PERMITS, ALL OF THE PROPOSED WORK | | | INCLUDING LABOR, MATERIALS, COST, OVERHEAD AND PROFIT. | | | CITY AMENDMENTS 109.3. | | | | | | 7) IN ORDER TO SPEED THE REVIEW PROCESS, PLEASE SUBMIT | | | A RESPONSE LETTER INDICATING HOW EACH OF THE REVIEW | | | COMMENTS WAS ADDRESSED. | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | [email protected] |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2014-01-18 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-01-18 |
Time |
11:56 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-01-16 |
Time |
08:40 |
Sent To |
|
|
| Notes |
| 2014-01-16 10:12:18 | 2010 FBC | | | | | | DENIED BY BUILDING | | | | | | BASED ON THE CITY OF WPB BUILDING DEPARTMENT RECORDS, | | | THIS STRUCTURE WAS A DETACHED GARAGE APPROXIMATELY 13' | | | X 22' IN SIZE. THE APPROXIMATELY 5' X 18' AREA WITH THE | | | BATHROOM AND LAUNDRY ROOM WAS ADDED AT A LATER DATE | | | WITHOUT PERMITS OR INSPECTIONS. | | | | | | 1) THE DESIGN CRITERIA ON SHEET 3 IS INCORRECT. PLEASE | | | UPDATE IT TO MATCH SHEET 1. 2010 FBC R301.2.1 AND ASCE | | | 7-10. | | | | | | 2) ON SHEET 1 THE BUILDING CLASSIFICATION IS SPECIFIED | | | AS III B. IF THIS IS REFERRING TO THE TYPE OF | | | CONSTRUCTION FOR THE STRUCTURE, IT WOULD BE V B PER FBC | | | TABLE 601. | | | | | | 3) THE DESIGN PARAMETERS ON SHEET 3 SPECIFY THE | | | BUILDING DESIGN AS CAVERED. WAS THIS MEANT TO SAY | | | ENCLOSED? PLEASE CLARIFY. CITY AMENDMENTS 107.2.1 | | | | | | 4) PROVIDE A CONNECTOR SCHEDULE THAT SPECIFIES THE TYPE | | | AND NUMBER OF FASTENERS, THE ALLOWABLE LOADS AND THE | | | PRODUCT APPROVAL NUMBERS FOR THE SPECIFIED CONNECTORS | | | ON THE PLANS OR SUBMIT TWO COPIES OF PRODUCT APPROVALS | | | FOR EACH OF THEM. DCA RULE 9N-3 AND FBCR 301.1 | | | | | | 5) SPECIFY THE ROOF SLOPE ON THE PLANS. THE ELEVATIONS | | | ON SHEET 5 OF THE PLANS SHOW THAT THE SAME ROOF SLOPE | | | IS CONTINUED OVER THE BATHROOM AND LAUNDRY AREAS. THE | | | PHOTO OF THE STRUCTURE ON SHEET 1 OF THE PLANS SHOW | | | THAT THE ROOF SLOPE IS LESS OVER THIS AREA. PLEASE | | | CLARIFY. CITY AMENDMENTS 107.2.1 NOTE: THE MINIMUM | | | SLOPE FOR ASPHALT SHINGLES IS 2/12 PER FBCR 905.2.2. | | | | | | 6) INDICATE THE TYPE AND SIZE OF THE WINDOW SHOWN ON | | | THE PLANS AND SUBMIT TWO COPIES OF PRODUCT APPROVALS | | | FOR THE WINDOW. NOTE: BECAUSE THIS IS A STORAGE SHED | | | NOT DESIGNED FOR HUMAN HABITATION AND HAS A FLOOR AREA | | | OF LESS THAN 720 SQFT, LARGE MISSILE IMPACT PROTECTION | | | IS NOT REQUIRED (FBC R301.2.1.2 (2) . | | | | | | 7) SPECIFY ON THE PLANS THAT THIS STRUCTURE IS NOT | | | DESIGNED NOR INTENDED TO BE USED AS HABITABLE SPACE. | | | CITY AMENDMENTS 107.2.1 | | | | | | 8) THE VALUE SPECIFIED ON THE PLANS OF $2000.00 IS TOO | | | LOW. PLEASE PROVIDE A REASONABLE VALUE FOR THIS PROJECT | | | THAT INCLUDES THE UN-PERMITTED ADDITION, THE | | | UN-PERMITTED PLUMBING WORK, THE ELECTRIC WORK, THE NEW | | | HEATING AND AIR SYSTEM, STRUCTURAL AND OTHER SPECIFIED | | | WORK. FOR PERMITTING PURPOSES THE VALUATION IS TO BE | | | THE TOTAL REPLACEMENT COST AND IS REQUIRED TO INCLUDE | | | THE COSTS OF ALL LABOR, MATERIALS, DESIGN COSTS, | | | OVERHEAD AND PROFIT AS WOULD BE CHARGED BY A | | | CONTRACTOR. CITY AMENDMENTS 109.3 | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | [email protected] |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2014-06-14 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-06-14 |
Time |
07:27 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-06-13 |
Time |
18:13 |
Sent To |
|
|
| Notes |
| 2014-06-14 07:27:48 | PASSED SUBJECT TO FIELD INSPECTOR'S APPROVAL. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2014-04-25 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-04-25 |
Time |
18:19 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-04-25 |
Time |
18:19 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2014-01-18 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-01-18 |
Time |
12:01 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-01-15 |
Time |
18:45 |
Sent To |
|
|
| Notes |
| 2014-01-18 12:06:36 | PASSED SUBJECT TO FIELD INSPECTOR'S APPROVAL. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2014-06-16 |
|
|
Cont ID |
|
| Sent By |
dkittred |
Date |
2014-06-16 |
Time |
13:17 |
Rev Time |
0.00 |
| Received By |
dkittred |
Date |
2014-06-11 |
Time |
|
Sent To |
|
|
| Notes |
| 2014-06-11 09:28:42 | ROUTED TO R MCDOUGAL |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2014-04-26 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-04-26 |
Time |
07:32 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-04-03 |
Time |
09:33 |
Sent To |
|
|
| Notes |
| 2014-04-04 09:34:28 | SENT TO R. MCDOUGAL'S DESK FOR REVIEW. JG. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2014-01-18 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-01-18 |
Time |
12:06 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2013-12-11 |
Time |
11:01 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
3 |
Status |
P |
Date |
2014-06-13 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-06-13 |
Time |
18:12 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-06-13 |
Time |
18:12 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
F |
Date |
2014-04-25 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-04-25 |
Time |
18:28 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-04-25 |
Time |
18:28 |
Sent To |
|
|
| Notes |
| 2014-04-25 18:40:06 | 2010 FBC | | | | | | DENIED BY MECHANICAL | | | | | | 1) THE EQUIPMENT SIZING CALCULATIONS DO NOT MATCH THE | | | SIZE OF EQUIPMENT SPECIFIED ON THE PLANS. 2010 FBC | | | ENERGY SECTION 403.6.1 | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | [email protected] |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2014-01-16 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-01-16 |
Time |
08:39 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-01-15 |
Time |
18:46 |
Sent To |
|
|
| Notes |
| 2014-01-16 08:39:14 | 2010 FBC | | | | | | DENIED BY MECHANICAL | | | | | | 1) SUBMIT TWO COPIES OF ENERGY CALCULATIONS FOR THE | | | STRUCTURE WHICH IS TO BEING CONVERTED TO CONDITIONED | | | SPACE. THE FORM IS TO BE SIGNED AND DATED BY THE PERSON | | | THAT PREPARES IT AND THE OWNER/AGENT. FBC ENERGY | | | CONSERVATION 101.4.5 | | | | | | 2) SUBMIT TWO COPIES OF EQUIPMENT SIZING CALCULATIONS | | | IN ACCORDANCE WITH FBC FBCR M1401.3. THE EQUIPMENT THAT | | | IS SPECIFIED ON THE PLANS IS REQUIRED TO MATCH THE | | | SIZING CALCULATIONS. | | | | | | 3) REVISE THE PLANS TO SHOW THE CLOTHES DRYER EXHAUSTED | | | TO THE OUTSIDE OF THE BUILDING AND AT LEAST 3 FEET FROM | | | ANY OPENINGS INTO THE BUILDING. FBCR M1502 | | | | | | 4) REVISE THE PLANS TO SHOW THE BATHROOM VENTILATION | | | EXHAUSTED TO THE OUTSIDE OF THE BUILDING. FBCR M 1507 | | | | | | 5) THE MECHANICAL PLANS DO NOT SHOW HOW THE AIR WILL BE | | | RETURNED TO THE AIR HANDLER. SPECIFY THE SIZE OF THE | | | RETURN AIR GRILL OR THAT THE DOOR TO THE A/H CLOSET IS | | | A LOUVERED DOOR. FBCR M1602.2 | | | | | | 6) THE EQUIPMENT SCHEDULE SPECIFIES A TOTAL AIR FLOW OF | | | 600 CFMS, BUT THE DUCT LAYOUT ONLY SHOWS 200 CFMS. | | | PLEASE CORRECT. CITY AMENDMENTS 107.2.1 | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | [email protected] |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
P |
Date |
2014-06-13 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-06-13 |
Time |
18:05 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-06-13 |
Time |
18:04 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
F |
Date |
2014-04-25 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-04-25 |
Time |
18:05 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-04-25 |
Time |
18:05 |
Sent To |
|
|
| Notes |
| 2014-04-25 18:15:58 | 2010 FBC | | | | | | DENIED BY PLUMBING | | | | | | 1) THE SHOWER AND WATER CLOSET ARE NOT PROPERLY VENTED. | | | FBCR P3108.2.1 NOT MORE THAN ONE ONE WET-VENTED FIXTURE | | | DRAIN SHALL DISCHARGE UPSTREAM OF THE DRY-VENTED | | | FIXTURE DRAIN CONNECTION. | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | [email protected] |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2014-01-16 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-01-16 |
Time |
07:21 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-01-15 |
Time |
18:45 |
Sent To |
|
|
| Notes |
| 2014-01-16 07:29:48 | 2010 FBC | | | | | | DENIED BY PLUMBING | | | | | | 1) SUBMIT TWO SETS OF A PLUMBING RISER DIAGRAM SHOWING | | | THE BATHROOM AND LAUNDRY. CITY AMENDMENTS 107.3.5.3 | | | | | | 2) THE NAME, SIGNATURE AND LICENSE NUMBER OF THE PERSON | | | RESPONSIBLE FOR THE DESIGN IS REQUIRED ON THE PLAN. | | | CITY AMENDMENTS 107.2.1 | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | [email protected] |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
1 |
Status |
P |
Date |
2014-06-20 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2014-06-20 |
Time |
08:39 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2014-06-20 |
Time |
08:39 |
Sent To |
|
|
| Notes |
| 2014-06-20 08:40:37 | NOA NO.13-0419.04 |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2014-06-16 |
|
|
Cont ID |
|
| Sent By |
dkittred |
Date |
2014-06-16 |
Time |
12:53 |
Rev Time |
0.00 |
| Received By |
dkittred |
Date |
2014-06-16 |
Time |
12:25 |
Sent To |
|
|
| Notes |
| 2014-06-16 11:47:11 | 6/16/14 ZONING SENT TO DK. SG |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2013-12-18 |
|
|
Cont ID |
|
| Sent By |
dkittred |
Date |
2013-12-18 |
Time |
16:38 |
Rev Time |
0.00 |
| Received By |
dkittred |
Date |
2013-12-18 |
Time |
12:37 |
Sent To |
|
|
| Notes |
| 2013-12-18 11:05:50 | 12/18/13 |
|
|