Plan Review Details - Permit 13120466
Plan Review Stops For Permit 13120466
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2014-06-17 Cont ID  
Sent By rmcdouga Date 2014-06-17 Time 07:26 Rev Time 0.00
Received By rmcdouga Date 2014-06-17 Time 07:26 Sent To  
Notes
2014-06-17 07:26:46PROCESS APPROVED PLANS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2014-06-14 Cont ID  
Sent By rmcdouga Date 2014-06-14 Time 09:03 Rev Time 0.00
Received By rmcdouga Date 2014-06-13 Time 17:52 Sent To Z
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2014-04-26 Cont ID  
Sent By rmcdouga Date 2014-04-26 Time 07:32 Rev Time 0.00
Received By rmcdouga Date 2014-04-25 Time 18:47 Sent To  
Notes
2014-04-25 18:59:242010 FBC
  
 DENIED BY BUILDING
  
 1) THE PRODUCT APPROVAL FOR THE TRULITE SINGLE HUNG
 WINDOWS (NOA NO.12-0118.16) EXPIRED IN 2012. SUBMIT A
 CURRENT PRODUCT APPROVAL THAT HAS BEEN APPROVED BY THE
 DESIGNER OF RECORD. DCA RULE 9N-3 AND CITY AMENDMENTS
 107.3.4.1
  
 2) SPECIFY WHICH ONE OF THE APPROVED ASSEMBLIES FROM
 THE GAF SELF-ADHERING ROOFING SYSTEM (NOA NO.
 14-0102.12) WILL BE USED. SPECIFY THE FASTENING OPTION
 AND MAXIMUM DESIGN PRESSURE FOR THE SYSTEM. SUBMIT TWO
 SETS OF SIGNED AND SEALED RAS 117 CALCULATIONS FOR
 ENHANCED FASTENING AT THE CORNER AND PERIMETER AREAS IN
 ACCORDANCE WITH LIMITATION NUMBER 7 OF THE NOA. FBCR
 301.1
  
 3) CLARIFY WHERE THE MTS 20 STRAPS SPECIFIED ON PAGE 6
 ARE TO BE USED. THE WALL SECTION ON PAGE 3 SHOWS A
 SIMPSON H10 CONNECTOR AT EACH RAFTER. CITY AMENDMENTS
 107.2.1
  
 4) THE FASTENERS THAT ARE SPECIFIED FOR THE MTS 20
 STRAPS ARE INCORRECT. TAPCONS ARE NOT APPROVED
 FASTENERS FOR SIMPSON CONNECTORS. THEY REQUIRE TITAN
 MASONRY SCREWS. THE MTS 20 REQUIRES (7) 10D X 1-1/2"
 INTO THE TRUSS AND (7) 10D X 1-1/2" INTO THE WALL PLATE
 FOR A TOTAL OF 14 FASTENERS FOR WOOD TO WOOD
 CONNECTIONS. YOU WILL NEED TO PROVIDE DOCUMENTATION
 FROM SIMPSON IF YOU WISH TO MODIFY THE INTENDED AND
 TESTED USE OR FASTENERS. FBCR 301.1 AND DCA RULE 9N-3
  
 5) PLEASE CLARIFY THE ENHANCED NAILING PATTERN FOR
 ROOFING NOTE ON PAGE 6. IF THIS IS INTENDED FOR THE
 BASE SHEET ATTACHMENT OF THE GAF SELF-ADHERING ROOFING
 SYSTEM (NOA NO. 14-0102.12), IT IS NOT ACCEPTABLE. RAS
 117 CALCULATIONS ARE REQUIRED FOR THAT AS STATED ABOVE.
 CITY AMENDMENTS 107.2.1
  
 6) THE VALUE OF THE WORK ON THE APPLICATION IS
 $2000.00. THIS IS TOO LOW. INCLUDE THE VALUE OF ALL THE
 WORK DONE WITHOUT PERMITS, ALL OF THE PROPOSED WORK
 INCLUDING LABOR, MATERIALS, COST, OVERHEAD AND PROFIT.
 CITY AMENDMENTS 109.3.
  
 7) IN ORDER TO SPEED THE REVIEW PROCESS, PLEASE SUBMIT
 A RESPONSE LETTER INDICATING HOW EACH OF THE REVIEW
 COMMENTS WAS ADDRESSED.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2014-01-18 Cont ID  
Sent By rmcdouga Date 2014-01-18 Time 11:56 Rev Time 0.00
Received By rmcdouga Date 2014-01-16 Time 08:40 Sent To  
Notes
2014-01-16 10:12:182010 FBC
  
 DENIED BY BUILDING
  
 BASED ON THE CITY OF WPB BUILDING DEPARTMENT RECORDS,
 THIS STRUCTURE WAS A DETACHED GARAGE APPROXIMATELY 13'
 X 22' IN SIZE. THE APPROXIMATELY 5' X 18' AREA WITH THE
 BATHROOM AND LAUNDRY ROOM WAS ADDED AT A LATER DATE
 WITHOUT PERMITS OR INSPECTIONS.
  
 1) THE DESIGN CRITERIA ON SHEET 3 IS INCORRECT. PLEASE
 UPDATE IT TO MATCH SHEET 1. 2010 FBC R301.2.1 AND ASCE
 7-10.
  
 2) ON SHEET 1 THE BUILDING CLASSIFICATION IS SPECIFIED
 AS III B. IF THIS IS REFERRING TO THE TYPE OF
 CONSTRUCTION FOR THE STRUCTURE, IT WOULD BE V B PER FBC
 TABLE 601.
  
 3) THE DESIGN PARAMETERS ON SHEET 3 SPECIFY THE
 BUILDING DESIGN AS CAVERED. WAS THIS MEANT TO SAY
 ENCLOSED? PLEASE CLARIFY. CITY AMENDMENTS 107.2.1
  
 4) PROVIDE A CONNECTOR SCHEDULE THAT SPECIFIES THE TYPE
 AND NUMBER OF FASTENERS, THE ALLOWABLE LOADS AND THE
 PRODUCT APPROVAL NUMBERS FOR THE SPECIFIED CONNECTORS
 ON THE PLANS OR SUBMIT TWO COPIES OF PRODUCT APPROVALS
 FOR EACH OF THEM. DCA RULE 9N-3 AND FBCR 301.1
  
 5) SPECIFY THE ROOF SLOPE ON THE PLANS. THE ELEVATIONS
 ON SHEET 5 OF THE PLANS SHOW THAT THE SAME ROOF SLOPE
 IS CONTINUED OVER THE BATHROOM AND LAUNDRY AREAS. THE
 PHOTO OF THE STRUCTURE ON SHEET 1 OF THE PLANS SHOW
 THAT THE ROOF SLOPE IS LESS OVER THIS AREA. PLEASE
 CLARIFY. CITY AMENDMENTS 107.2.1 NOTE: THE MINIMUM
 SLOPE FOR ASPHALT SHINGLES IS 2/12 PER FBCR 905.2.2.
  
 6) INDICATE THE TYPE AND SIZE OF THE WINDOW SHOWN ON
 THE PLANS AND SUBMIT TWO COPIES OF PRODUCT APPROVALS
 FOR THE WINDOW. NOTE: BECAUSE THIS IS A STORAGE SHED
 NOT DESIGNED FOR HUMAN HABITATION AND HAS A FLOOR AREA
 OF LESS THAN 720 SQFT, LARGE MISSILE IMPACT PROTECTION
 IS NOT REQUIRED (FBC R301.2.1.2 (2) .
  
 7) SPECIFY ON THE PLANS THAT THIS STRUCTURE IS NOT
 DESIGNED NOR INTENDED TO BE USED AS HABITABLE SPACE.
 CITY AMENDMENTS 107.2.1
  
 8) THE VALUE SPECIFIED ON THE PLANS OF $2000.00 IS TOO
 LOW. PLEASE PROVIDE A REASONABLE VALUE FOR THIS PROJECT
 THAT INCLUDES THE UN-PERMITTED ADDITION, THE
 UN-PERMITTED PLUMBING WORK, THE ELECTRIC WORK, THE NEW
 HEATING AND AIR SYSTEM, STRUCTURAL AND OTHER SPECIFIED
 WORK. FOR PERMITTING PURPOSES THE VALUATION IS TO BE
 THE TOTAL REPLACEMENT COST AND IS REQUIRED TO INCLUDE
 THE COSTS OF ALL LABOR, MATERIALS, DESIGN COSTS,
 OVERHEAD AND PROFIT AS WOULD BE CHARGED BY A
 CONTRACTOR. CITY AMENDMENTS 109.3
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2014-06-14 Cont ID  
Sent By rmcdouga Date 2014-06-14 Time 07:27 Rev Time 0.00
Received By rmcdouga Date 2014-06-13 Time 18:13 Sent To  
Notes
2014-06-14 07:27:48PASSED SUBJECT TO FIELD INSPECTOR'S APPROVAL.

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2014-04-25 Cont ID  
Sent By rmcdouga Date 2014-04-25 Time 18:19 Rev Time 0.00
Received By rmcdouga Date 2014-04-25 Time 18:19 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2014-01-18 Cont ID  
Sent By rmcdouga Date 2014-01-18 Time 12:01 Rev Time 0.00
Received By rmcdouga Date 2014-01-15 Time 18:45 Sent To  
Notes
2014-01-18 12:06:36PASSED SUBJECT TO FIELD INSPECTOR'S APPROVAL.

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2014-06-16 Cont ID  
Sent By dkittred Date 2014-06-16 Time 13:17 Rev Time 0.00
Received By dkittred Date 2014-06-11 Time   Sent To  
Notes
2014-06-11 09:28:42ROUTED TO R MCDOUGAL

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2014-04-26 Cont ID  
Sent By rmcdouga Date 2014-04-26 Time 07:32 Rev Time 0.00
Received By rmcdouga Date 2014-04-03 Time 09:33 Sent To  
Notes
2014-04-04 09:34:28SENT TO R. MCDOUGAL'S DESK FOR REVIEW. JG.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-01-18 Cont ID  
Sent By rmcdouga Date 2014-01-18 Time 12:06 Rev Time 0.00
Received By rmcdouga Date 2013-12-11 Time 11:01 Sent To  
Notes
2013-12-14 11:04:41R08
  

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2014-06-13 Cont ID  
Sent By rmcdouga Date 2014-06-13 Time 18:12 Rev Time 0.00
Received By rmcdouga Date 2014-06-13 Time 18:12 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2014-04-25 Cont ID  
Sent By rmcdouga Date 2014-04-25 Time 18:28 Rev Time 0.00
Received By rmcdouga Date 2014-04-25 Time 18:28 Sent To  
Notes
2014-04-25 18:40:062010 FBC
  
 DENIED BY MECHANICAL
  
 1) THE EQUIPMENT SIZING CALCULATIONS DO NOT MATCH THE
 SIZE OF EQUIPMENT SPECIFIED ON THE PLANS. 2010 FBC
 ENERGY SECTION 403.6.1
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2014-01-16 Cont ID  
Sent By rmcdouga Date 2014-01-16 Time 08:39 Rev Time 0.00
Received By rmcdouga Date 2014-01-15 Time 18:46 Sent To  
Notes
2014-01-16 08:39:142010 FBC
  
 DENIED BY MECHANICAL
  
 1) SUBMIT TWO COPIES OF ENERGY CALCULATIONS FOR THE
 STRUCTURE WHICH IS TO BEING CONVERTED TO CONDITIONED
 SPACE. THE FORM IS TO BE SIGNED AND DATED BY THE PERSON
 THAT PREPARES IT AND THE OWNER/AGENT. FBC ENERGY
 CONSERVATION 101.4.5
  
 2) SUBMIT TWO COPIES OF EQUIPMENT SIZING CALCULATIONS
 IN ACCORDANCE WITH FBC FBCR M1401.3. THE EQUIPMENT THAT
 IS SPECIFIED ON THE PLANS IS REQUIRED TO MATCH THE
 SIZING CALCULATIONS.
  
 3) REVISE THE PLANS TO SHOW THE CLOTHES DRYER EXHAUSTED
 TO THE OUTSIDE OF THE BUILDING AND AT LEAST 3 FEET FROM
 ANY OPENINGS INTO THE BUILDING. FBCR M1502
  
 4) REVISE THE PLANS TO SHOW THE BATHROOM VENTILATION
 EXHAUSTED TO THE OUTSIDE OF THE BUILDING. FBCR M 1507
  
 5) THE MECHANICAL PLANS DO NOT SHOW HOW THE AIR WILL BE
 RETURNED TO THE AIR HANDLER. SPECIFY THE SIZE OF THE
 RETURN AIR GRILL OR THAT THE DOOR TO THE A/H CLOSET IS
 A LOUVERED DOOR. FBCR M1602.2
  
 6) THE EQUIPMENT SCHEDULE SPECIFIES A TOTAL AIR FLOW OF
 600 CFMS, BUT THE DUCT LAYOUT ONLY SHOWS 200 CFMS.
 PLEASE CORRECT. CITY AMENDMENTS 107.2.1
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop P PLUMBING
Rev No 3 Status P Date 2014-06-13 Cont ID  
Sent By rmcdouga Date 2014-06-13 Time 18:05 Rev Time 0.00
Received By rmcdouga Date 2014-06-13 Time 18:04 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status F Date 2014-04-25 Cont ID  
Sent By rmcdouga Date 2014-04-25 Time 18:05 Rev Time 0.00
Received By rmcdouga Date 2014-04-25 Time 18:05 Sent To  
Notes
2014-04-25 18:15:582010 FBC
  
 DENIED BY PLUMBING
  
 1) THE SHOWER AND WATER CLOSET ARE NOT PROPERLY VENTED.
 FBCR P3108.2.1 NOT MORE THAN ONE ONE WET-VENTED FIXTURE
 DRAIN SHALL DISCHARGE UPSTREAM OF THE DRY-VENTED
 FIXTURE DRAIN CONNECTION.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop P PLUMBING
Rev No 1 Status F Date 2014-01-16 Cont ID  
Sent By rmcdouga Date 2014-01-16 Time 07:21 Rev Time 0.00
Received By rmcdouga Date 2014-01-15 Time 18:45 Sent To  
Notes
2014-01-16 07:29:482010 FBC
  
 DENIED BY PLUMBING
  
 1) SUBMIT TWO SETS OF A PLUMBING RISER DIAGRAM SHOWING
 THE BATHROOM AND LAUNDRY. CITY AMENDMENTS 107.3.5.3
  
 2) THE NAME, SIGNATURE AND LICENSE NUMBER OF THE PERSON
 RESPONSIBLE FOR THE DESIGN IS REQUIRED ON THE PLAN.
 CITY AMENDMENTS 107.2.1
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status P Date 2014-06-20 Cont ID  
Sent By rmcdouga Date 2014-06-20 Time 08:39 Rev Time 0.00
Received By rmcdouga Date 2014-06-20 Time 08:39 Sent To  
Notes
2014-06-20 08:40:37NOA NO.13-0419.04

Review Stop Z ZONING
Rev No 2 Status P Date 2014-06-16 Cont ID  
Sent By dkittred Date 2014-06-16 Time 12:53 Rev Time 0.00
Received By dkittred Date 2014-06-16 Time 12:25 Sent To  
Notes
2014-06-16 11:47:116/16/14 ZONING SENT TO DK. SG

Review Stop Z ZONING
Rev No 1 Status P Date 2013-12-18 Cont ID  
Sent By dkittred Date 2013-12-18 Time 16:38 Rev Time 0.00
Received By dkittred Date 2013-12-18 Time 12:37 Sent To  
Notes
2013-12-18 11:05:5012/18/13


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved