Plan Review Details - Permit 13110401
Plan Review Stops For Permit 13110401
Review Stop E ELECTRICAL
Rev No 5 Status P Date 2014-02-25 Cont ID  
Sent By albarran Date 2014-02-25 Time 18:38 Rev Time 0.00
Received By albarran Date 2014-02-25 Time 18:28 Sent To I
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 4 Status F Date 2014-02-06 Cont ID  
Sent By albarran Date 2014-02-06 Time 14:31 Rev Time 0.00
Received By albarran Date 2014-02-03 Time 17:27 Sent To  
Notes
2014-02-06 14:34:042/18/14 ROUTED TO DENIED SMALL BIN "E", MA
 THIS HAS BEEN ON MY DESK WAITING FOR ADAM TO SUBMITT
 CORRECTION AS PER OUR CONVERSATION, BUT BEING THAT HE
 HAS NOT, I ROUTED TO THE BIN.
  
  
 2/6214 THIS IS HOLDING ON MY DESK
  
  
  
  
 NOT HAVING HEARD BACK FROM ADAM OF ELCON ELECTRIC, I
 CALLED HIM THIS AFTERNOON. WE DISCUSSED THE SUBMITTED
 DRAWING AND AGREED FOR HIM TO SUBMIT A DRAWING THAT IS
 REPRESENTATIVE OF THE SITE CONDITIONS AND ON IT
 MARK/CLOUD THE ITEM BEING REMOVED.

Review Stop E ELECTRICAL
Rev No 3 Status F Date 2013-12-27 Cont ID  
Sent By albarran Date 2013-12-27 Time 13:09 Rev Time 0.00
Received By albarran Date 2013-12-27 Time 13:09 Sent To I
Notes
2013-12-27 13:11:37I SPOKE W/ADAM OF ELCON, WHO UPON SEEING THE DRAWING
 AND TRYING TO MATCH IT TO THE SCOPE OF WORK DECIDED TO
 REVISE THE DRAWING AND DESCRIBED THE SCOPE OF WORK ON
 THE REVISION FORM.

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2013-12-17 Cont ID  
Sent By albarran Date 2013-12-17 Time 18:40 Rev Time 0.00
Received By albarran Date 2013-12-17 Time 18:24 Sent To  
Notes
2013-12-17 18:43:40AS OF TONIGHT, I STILL CANT DETERMINE THE SCOPE OF
 WORK. I CALLED THE EC FOR A CLARIFICATION BUT HAD TO
 LEAVE A MESSAGE. I WILL HOLD THE FILE ON MY DESK FOR A
 DAY TO DISCUSS THIS FURTHER. THE DRAWING SUBMITTED DOES
 NOT INDICATE WHICH PANEL IS BEING WIRED OR WHY. IF A
 NEW PANEL IS BEING ADDED, OR ADDITIONAL LOADS ARE BEING
 PLACED ON AN EXISTING PANEL REQUIRING LARGER WIRE LOAD
 CALCULATIONS IN ADDITION TO A PANEL SCHEDULE SHALL BE
 PROVIDED,

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2013-12-17 Cont ID  
Sent By albarran Date 2013-11-14 Time 18:39 Rev Time 0.00
Received By albarran Date 2013-11-14 Time 10:33 Sent To I
Notes
2013-11-14 10:43:23HOLDING THIS ON MY DESK WAITING A RESPONSE FROM EC
2013-11-14 10:42:50THE SUBMITTED DRAWING APPEARS TO CONNECT WHAT MAY BE
 TWO SEPARATE SERVICES. I CALLED THE EC AND SPOKE WITH
 STEPHANIE WHO WILL CONFIRM AND ADVISE.
 IF NECESSARY DRAWING WILL BE CORRECTED AND RESUBMITTED.

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2014-02-25 Cont ID  
Sent By albarran Date 2014-02-25 Time 18:38 Rev Time 0.00
Received By albarran Date 2014-02-25 Time 18:24 Sent To PC
Notes
2014-02-25 18:25:08TO MA DESK
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2014-02-25 Cont ID  
Sent By shill Date 2014-02-18 Time 18:24 Rev Time 0.00
Received By shill Date 2014-01-11 Time 08:32 Sent To  
Notes
2014-01-11 08:32:11TO ELEC
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2013-12-31 Cont ID  
Sent By shill Date 2013-12-31 Time 17:07 Rev Time 0.00
Received By shill Date 2013-11-21 Time 16:39 Sent To  
Notes
2013-12-27 13:13:56SENT TO SH DESK FOR ROUTING TO DENIED BIN. EC IS AWARE
 OF THE SITUATION
  
2013-11-21 16:39:58TO ELEC
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-01-11 Cont ID  
Sent By shill Date 2013-11-14 Time 08:31 Rev Time 0.00
Received By shill Date 2013-11-13 Time 08:22 Sent To  
Notes
2013-11-13 08:22:47ROUTED TO ELECTRICAL $5000 & UNDER


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved