Plan Review Details - Permit 13110189
Plan Review Stops For Permit 13110189
Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-03-27 Cont ID  
Sent By rmcdouga Date 2014-03-27 Time 18:16 Rev Time 0.00
Received By rmcdouga Date 2014-03-25 Time 18:37 Sent To  
Notes
2014-03-25 18:37:15TO RM DESK
  
  
2013-11-06 11:54:38ROUTED TO PLUMBING $5000 & UNDER

Review Stop P PLUMBING
Rev No 3 Status P Date 2014-03-28 Cont ID  
Sent By rmcdouga Date 2014-03-28 Time 15:15 Rev Time 0.00
Received By rmcdouga Date 2014-03-28 Time 15:15 Sent To  
Notes
2014-03-28 15:16:13THE CONTRACTOR PROVIDED THE REQUIRED INFORMATION VIA A
 PHONE CALL.

Review Stop P PLUMBING
Rev No 2 Status F Date 2014-03-27 Cont ID  
Sent By rmcdouga Date 2014-03-27 Time 18:16 Rev Time 0.00
Received By rmcdouga Date 2014-03-27 Time 17:09 Sent To  
Notes
2014-03-27 18:21:012010 FBC
  
 DENIED
  
 1) THE PLUMBING RISER DIAGRAM DOES NOT SHOW ANY
 VENTING. FBCR P3101.2.1
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop P PLUMBING
Rev No 1 Status F Date 2013-11-12 Cont ID  
Sent By rmcdouga Date 2013-11-12 Time 16:49 Rev Time 0.00
Received By rmcdouga Date 2013-11-12 Time 16:48 Sent To  
Notes
2013-11-12 17:45:172010 FBC
  
 DENIED BY PLUMBING
  
 1) `THE SCOPE OF WORK FOR THIS PROJECT REQUIRES A
 BUILDING CONTRACTOR TO PULL A RESIDENTIAL REMODEL
 PERMIT. THIS PLUMBING PERMIT SHOULD BE TIED TO THE
 REMODEL PERMIT AND CAN NOT BE ISSUED UNTIL A REMODEL
 PERMIT IS ISSUED. PERMITS FOR ELECTRIC WILL ALSO BE
 REQUIRED. A SEPARATE PERMIT, APPLICATION AND REVIEW IS
 REQUIRED FOR THE GAS PERMIT.
  
 2) SUBMIT TWO SETS OF DIMENSIONED PLANS FOR THE NEW
 BATHROOM TO SHOW COMPLIANCE WITH FBC R307.1. THE
 ADDRESS OF THE PROJECT, THE PRINTED NAME AND SIGNATURE
 OF THE PERSON RESPONSIBLE FOR THE DESIGN IS REQUIRED TO
 BE ON THE PLANS.
  
 3) SUBMIT TWO SETS OF A FLOOR PLAN OF THE EXISTING
 DWELLING SPECIFYING THE EXISTING ROOMS AND SHOWING THE
 LOCATION OF THE PROPOSED BATHROOM AND NEW TANKLESS
 WATER HEATER. CITY AMENDMENTS 107.2.1. THE ADDRESS OF
 THE PROJECT, THE PRINTED NAME AND SIGNATURE OF THE
 PERSON RESPONSIBLE FOR THE DESIGN IS REQUIRED TO BE ON
 THE PLANS.
  
 4) SUBMIT TWO SETS OF A RISER DIAGRAM FOR THE NEW
 BATHROOM. SPECIFY THE PIPING MATERIAL, PIPE SIZES AND
 LOCATIONS FOR THE WASTE AND VENT PIPING. THE ADDRESS OF
 THE PROJECT, THE PRINTED NAME AND SIGNATURE OF THE
 PERSON RESPONSIBLE FOR THE DESIGN IS REQUIRED TO BE ON
 THE PLANS. CITY AMENDMENTS 107.3.5
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]